A finishing contractor in Jubail really works in two places that share one name: Jubail Industrial City, with its residential districts and administration buildings, and Jubail Al-Balad, the original town of family houses and walk-up blocks. At Aemar Al-Maryam General Contracting, we pick up a villa or flat at shell stage, an empty office floor, or an older home whose finishes and wiring are tired, put every trade on one schedule, and hand the place over after a written snagging walk. Our published rates are SAR 650 a square metre at economy, SAR 830 at standard and SAR 1,100 at premium; the metre is floor area and the rate covers the materials we supply plus the trades’ labour. They hold as estimates only until the site visit and a signed scope. Phone or WhatsApp: 0547879578.
The difference between the two halves of Jubail is more than a postcode. Inside the Industrial City the Royal Commission issues the permits, electricity and water are supplied by Marafiq, and offices sit inside facilities with their own access rules and working hours. In Al-Balad paperwork goes through Balady, power comes from the Saudi Electricity Company, and many homes need a new distribution board before anyone talks about paint colours. So our first question is always where the property is, and the schedule is built around the answer.
In short: finishing in Jubail with Aemar Al-Maryam
- Typical jobs: shell villas and flats taken to move-in, empty office floors fitted out, and tired Al-Balad houses refreshed along with their boards.
- Rate per floor metre, supplied and fitted: starting points of 650, 830 and 1,100 riyals for the three levels.
- Before handover: a room-by-room snagging walk with tape markers and a written list, then a second walk with you.
- Offices: carpet tiles, glass partitions and suspended ceilings, priced at inspection.
- Authorities: Royal Commission and Marafiq in the Industrial City; Balady and the Saudi Electricity Company in Al-Balad.
- Outside the rate: air-conditioning units, loose furniture, kitchen joinery and white goods.
- Getting started: WhatsApp 0547879578 with the plan, room photos and current stage.
Finishing contractor in Jubail: the Industrial City and Al-Balad work differently
A finishing contractor in Jubail has to know which authority is involved before choosing a single tile. The finishing itself is the same in both places: concealed services that are tested, surfaces that are plastered, tiled and painted, then fittings and handover. What surrounds the work is different, and that is what delays projects when nobody plans for it. For a one-page overview see our finishing and interior extension service, and for every trade we cover locally, our Jubail area page.
Finishing in Jubail Industrial City: Royal Commission rules and Marafiq utilities
Because the Royal Commission runs Jubail Industrial City, permits and site rules come from it rather than from Balady, and electricity, water and sewerage are supplied by Marafiq to residents and facilities alike. In practice, any structural change, say a new doorway sawn in concrete or an added bedroom, goes through the Commission with an engineering office, and a meter change or new connection is coordinated with Marafiq. Tiling, painting, gypsum and similar interior work that leaves the frame alone counts as internal maintenance.
Many villas and homes in the Industrial City belong to employers or are rented. So before any tool comes out we need the scope approved in writing by the landlord or the housing office, and we follow the working hours, storage areas and waste removal routes the site sets.
Finishing in Jubail Al-Balad: older homes, renewal before decoration
In Al Dhabab, Ghirnatah, Al Hamra and the rest of Al-Balad we see houses and flats whose finishes are years old: small distribution boards that cannot carry air conditioners and water heaters together, ageing pipes, and floor tiles that sound hollow in places. A new colour is not enough there. We start with what is behind the wall and then rebuild the surface. Permits go through Balady where needed (see our renovation service), and electricity is on the Saudi Electricity Company.
■ Industrial City
Royal Commission permits, Marafiq utilities, employer housing, administration buildings with access rules.
■ Al-Balad
Balady and the Saudi Electricity Company, older homes, rewiring and replumbing before surfaces.
■ Common to both
one trade schedule, tests before closing, and a snagging walk before handover.
The snagging walk before villa handover in Jubail Industrial City
The snagging walk is the last stage of finishing a villa in Jubail and the one that matters most to the owner. Once the trades are done we go through the house room by room, put a small piece of blue tape on every spot that needs attention, and write it on a list under the room name, the type of defect and the trade responsible. The painter, plumber and electrician then work through the list, and we walk the villa again with you, peeling off each tape as its item is closed.
Small defects are hard to see on a working day: a scuff in the paint that only shows in midday light, a missing bead of silicone behind a basin, a door that catches the floor once the threshold goes in. If nobody writes them down and assigns them, they fall between trades. And because many Industrial City homes are handed to an employer or a tenant, a signed list protects everyone.
What we check in every room before handover
- ✓Floors: a 3 m straightedge; large-format tiles should not deviate more than 3 mm. We tap tiles to find hollow ones and check that grout is complete.
- ✓Bathrooms: we pour water to watch the fall to the drain, review the flood-test record, and check silicone at junctions and that mixers and traps do not leak.
- ✓Walls and ceilings: straight and plumb, no cracks beyond hairline, even paint without roller marks or patches.
- ✓Electrics: every point works, the residual-current device trips on its test button, and every circuit is named in the board.
- ✓Doors and windows: they close without rubbing, ironmongery is complete, no gaps around frames.
- ✓Paperwork: route photos taken while services were exposed, the test sheets, the list of materials used, and the snag list with signatures.
How we sort items on the snag list
| Category | Examples | When it is closed |
|---|---|---|
| Touch-up | paint scuff, missing grout, a smear of filler | on the repair day itself |
| Repair | hollow tile, a rubbing door, a dead socket, silicone that has come away | before the second walk |
| Rework | a shower floor falling the wrong way, a visibly wavy wall, a leak at a mixer | before handover, and re-checked in front of you |
Sorting the list makes the work efficient: the painter takes every touch-up in one round, the plumber and electrician take the repairs, and rework is treated as a small stage with its own check.
Owner tip
Join the walk in daylight and bring a hand torch. A low beam skimming along a wall shows waves in the plaster and paint far better than ceiling lights do.
Office fit-out in Jubail: carpet tiles, glass partitions and suspended ceilings
Office finishing in Jubail differs from homes in three ways: the floor is usually square carpet tiles rather than porcelain, rooms are divided with lightweight or glass partitions instead of block, and the ceiling is a suspended grid carrying flat panel lights and AC grilles. Much of our office work is inside existing administration buildings in the Industrial City, so we agree access, storage and the hours for noisy work with building management.

Square carpet tiles: why they suit offices
Carpet tiles are square pieces laid on a clean, level floor. A damaged or stained tile can be lifted and replaced on its own without stripping the room, and cables under the floor stay reachable. We set out from the middle of the space on two lines at right angles so that the cut pieces at the walls come out equal, and cut the edge tiles in place. The most important step comes before laying: levelling the floor, because any dip or ridge shows through the carpet over time. Floor levelling starts at SAR 14 per m²; carpet tiles themselves are priced at inspection by type and quantity.
Glass partitions and the suspended ceiling
Glass partitions and their frames come through a specialist supplier; our job is to place them in the schedule, after AC and electrical routes in the ceiling are fixed and before final paint and carpet so the floor is not damaged. For meeting rooms that must keep conversations private, we build a twin-skin drywall partition with mineral wool inside, from SAR 165 per square metre. The suspended ceiling is coordinated with light positions, AC grilles and the fire detectors the building office specifies, so no ceiling tile is cut in the wrong place.
Before fitting out an office inside a facility
Ask building management for permitted working hours, the route for bringing materials in, the waste point and worker access passes, and send them to us with the plan. These details decide the programme more than the floor area does.
Distribution boards in Jubail Al-Balad homes
Refreshing the finishes of an older house in Jubail Al-Balad usually starts at the electrical board. Old boards are small, circuits are mixed together, there is no residual-current protection, and owners notice when the power trips every time the air conditioners and the water heater run together. So we open the board before we promise a paint colour and decide with you whether to tidy it or replace it with a larger board and properly split circuits.

In a new board we separate lighting from sockets, air conditioners and water heaters, label each breaker with its circuit, and put sockets, bathrooms and the kitchen behind 30 mA earth-leakage protection. Before switching on we measure insulation resistance and earth continuity and test the RCD, then hand over the board with its circuit chart. Full detail is in our electrician in Jubail article. An electrical point within a first-fix project starts at SAR 37 and fitting a socket or switch at SAR 18; replacing the board itself is priced after inspection.
Do not paint over an electrical problem
If sockets run warm or breakers trip often, fix that before painting. Pulling a new cable after finishing means breaking into a painted wall and plastering it again.
Economy, standard and premium finishing in Jubail: what each level contains
The finishing level in Jubail is set by the visible materials, not by the services. Every level gets identical wiring, pipework and wet-area membranes; the difference is in tiles, ceilings, paint and doors. Rates below are per square metre of floor area, including materials and labour, and are estimates until inspection and agreement.
| Level | What you see on site | Starting rate per m² |
|---|---|---|
| Economy | Saudi-made ceramic floors, budget emulsion over cement render, plain ready-hung doors, and damp-proof board ceilings in the bathrooms only; all services and membranes as standard | SAR 650 |
| Standard | floors step up to roughly 60×60 porcelain, living rooms and majlis get flat gypsum ceilings, and paint and doors move up a grade | SAR 830 |
| Premium | marble or big-slab porcelain, stepped ceilings with concealed light coves, top-grade or feature paint, and solid timber doors | SAR 1,100 |
| Designer specification | imported stone and details drawn space by space | After the visit |
| Trades only | you buy materials, we price each item of labour | After the visit |
Kitchen cabinets, appliances, furniture and AC units are not included in any package.
Finishing stages in order in Jubail
Finishing stages in Jubail obey one principle: whatever ends up hidden is installed and proven first, wet trades follow, visible surfaces after that, and delicate items go in at the very end. Trades may overlap between rooms, never inside the same room.
- 1Layout and points
fix furniture positions, and from them socket, light, water and AC points, before any services go in. - 2Electrical first fix
conduits and boxes, low-current kept separate, routes photographed before closing. - 3Plumbing first fix
drains topped up to a three-metre head, level checked after fifteen minutes; supply lines held under pressure with no drop. - 4AC provisions
condensate lines, sleeves and duct routes before the gypsum. - 5Waterproofing and insulation
bathrooms flood-tested for 24 to 72 hours; thermal insulation of walls and roof in new buildings. - 6Plaster
dots and screeds, mesh where block meets concrete, and about a week of water curing. - 7Gypsum board
only once cable and duct routes are final, with damp-proof board in wet rooms. - 8Tiles
falls to the drain in wet areas; 3 mm in 3 m flatness for large formats. - 9Putty and first paint coats
when the render is dry; full cure of cement render may take four weeks. - 10Doors and windows
hung once the messy wet work has moved on. - 11Second fix
accessories on the walls, the board dressed, then taps, basins and water heaters fitted with relief valves. - 12Final coat and walk
final paint, silicone and cleaning, then the snagging walk and handover.
Our reference is the Saudi Building Code for dwellings. On new construction the heat insulation of walls and roof, and the glazing type, must be settled before rendering and window fixing because the utility will not connect without it; in the Industrial City we check Marafiq’s requirements, in Al-Balad those of the Saudi Electricity Company.
Shell, finishing, turnkey and renovation in Jubail: the difference
Shell (known locally as «عظم») is the concrete frame and block walls with no finishes, built by a building contractor; see building contractor in Jubail. Finishing starts from an existing shell and turns it into a home, which is what this article covers. Turnkey is a contract that combines both. Renovation repairs defects in a lived-in building while keeping what is sound; that is covered in renovation contractor in Jubail. Do not compare a renovation rate per metre with a finishing rate: renovation reuses sound plaster and services, finishing creates them.
Villa finishing company in Jubail
Finishing a villa in Jubail means two floors or more, wide halls where any wave in the floor or ceiling shows, and a guest majlis that owners usually want at a higher standard than the rest of the house. That is why we sometimes propose two levels in one villa: the ground floor with its halls and majlis at premium, the upper bedrooms at standard. The courtyard, facades and roof are priced on their own after the visit; for those see our Jubail painting page, roof insulation work in Jubail and interlock paving in Jubail.
Worked example: pricing a two-floor Industrial City villa
A villa in Jubail Industrial City with 190 m² per floor, so 380 m² of floor area, handed over at shell stage:
| Option | Calculation | From |
|---|---|---|
| Whole villa at standard | 380 × 830 | SAR 315,400 |
| Ground floor premium | 190 × 1,100 | SAR 209,000 |
| Upper floor standard | 190 × 830 | SAR 157,700 |
| Premium ground, standard upper | 209,000 + 157,700 | SAR 366,700 |
Illustrative estimate until inspection; excludes facades, courtyard, roof, kitchen cabinets, appliances and AC units, and crew travel is added after inspection.
The gap between the two options is SAR 51,300, which is the cost of putting the floor guests see at a higher level. Where the villa belongs to an employer, the housing agreement may already fix the material level, and we work to it.
Apartment finishing in Jubail
Apartment finishing in Jubail is most common in Al-Balad’s blocks, and comes in two forms: a flat at shell stage finished from scratch, and a lived-in flat whose finishes are renewed. The first follows the full stage list. In the second we decide what comes out and what stays; often that means stripping the old floor tiles with their mortar bed, from SAR 14 a square metre, keeping any render that passes the tap test, and laying a fresh membrane in each bathroom before it is retiled. Bathrooms and kitchens have their own detailed articles: bathroom renovation in Jubail and kitchen renovation in Jubail. We do not make or fit kitchen cabinets; our job ends with the services, walls and floor ready for your joiner.
Majlis and annex finishing in Jubail
An outdoor majlis or annex in a villa courtyard is usually one open space with few doors, and may have no bathroom or kitchen, so flat and villa packages do not apply as they stand. If the annex already exists as a shell we finish it by item: plaster, gypsum, tiles, paint and electrics, with any bathroom priced separately. If it is not built yet, annex and majlis builder in Jubail covers building and finishing together. In the Industrial City a new annex needs a Royal Commission permit before any work starts.
Interior extension and room merging in Jubail (non-load-bearing walls only)
Interior extension in Jubail covers knocking two bedrooms into one, opening a kitchen onto the family room, forming a new doorway, or putting up partitions to split a big hall. Our scope stops at partitions that carry no load; structural walls and beams need an engineer’s report and a permit first, and we will not start without both.
| Job | Starting price | Charged per |
|---|---|---|
| Demolishing a non-structural blockwork divider | SAR 185 | wall |
| Forming a door or window opening through concrete | SAR 140 | opening |
| Diamond-saw cut in a concrete wall | SAR 280 per cut, or 75 per metre run | job or length |
| Drywall partition, boarded both faces, rock-wool core | SAR 165 | m² |
| Cement-board partition, both faces, insulated core | SAR 185 | m² |
| Fresh blockwork partition, rendered | After the visit | — |
| Stripping old floor tiles and mortar where rooms join | SAR 14 | m² |
| Carting rubble to an approved tip in Jubail | After the visit | load |
| Structural wall, beam or strengthening works | After the visit and an engineer’s report | — |
Removing a wall leaves traces: a bare strip in the floor, a scar across the ceiling, and the outlets that used to live on that wall. We make these good as part of the job, and we recommend retiling the whole merged area because matching old tiles rarely works. Details are in door and window openings in Jubail, demolition contractor in Jubail and concrete cutting in Jubail.
Is the wall load-bearing? Permits in the Industrial City and Al-Balad
Thickness and the sound a wall makes under a knuckle prove nothing; an engineer reads the structural drawings, looks at the site and gives the answer. Removing a divider with no structural role counts as interior upkeep and normally needs no permit. Anything that touches a bearing wall, pierces concrete for a door or changes a beam alters the building’s components: on the Al-Balad side the route is Balady’s «إضافة وتعديل مكونات بناء» service with an engineering office, and in the Industrial City through the Royal Commission.
Finishing price per square metre in Jubail and item prices
Being in Jubail does not change the rate per metre: the three levels cost here exactly what they cost in Dammam. The one extra is the crew’s journey, which we work out after the visit from the amount of work and how many trips it will take. If you only want certain trades rather than a package, here are the individual rates:
| Work | From | Measured by |
|---|---|---|
| Wiring first fix for a villa or block, labour | SAR 28 | m² of built area |
| Pipework first fix for a new build, labour | SAR 23 | m² of built area |
| Plumbing labour, per bathroom / per kitchen | SAR 460 / 135 | room |
| Wet-room membrane proven by flooding | SAR 26 | m² |
| Internal render supplied / labour only | SAR 13 / 11 | m² |
| Gypsum ceiling, flat / damp-proof board | SAR 46 / 74 | m² |
| Gypsum ceiling, stepped / with light cove | SAR 110 / 138 | m² |
| Budget tiles we supply and fix in adhesive | SAR 37 | m² |
| Laying porcelain 60×60 / 60×120, labour | SAR 32 / 37 | m² |
| Skirting tile along the wall base | SAR 14 | running m |
| Filling and sanding walls for paint | SAR 14 | m² |
| Paint with materials, standard / top grade | SAR 14 / 32 | m² |
| Installing a mixer / a washbasin / a heater and its T&P valve | SAR 75 / 90 / 140 | per item |
| Carpet tiles and glazed office partitions | After the visit | — |
Figures stay provisional until inspection and agreement. The complete schedule is on our prices page.
How to estimate finishing cost yourself
Read the floor area off your deed or drawings, multiply by the rate for your chosen level, then add what the package leaves out: facades and courtyard, kitchen cabinets, appliances and air conditioners, and a contingency of around a tenth for changes. That number tells you whether your budget is close to the level you have in mind; the inspection firms it up.
What raises finishing cost in Jubail and decides how long it takes
- ✓Shell condition: walls that lean or slabs that dip mean heavier render coats and a levelling screed before any tile goes down.
- ✓Number of bathrooms: each one carries services, waterproofing and wall tiles, so a three-bathroom flat costs more than a two-bathroom flat of the same size.
- ✓Late decisions: moving a socket or basin after plastering means breaking out and redoing.
- ✓Material supply: tiles or doors ordered from outside the region can hold up the trade waiting for them.
- ✓Site rules: in Industrial City administration buildings noisy work may be limited to certain hours, which stretches the programme.
- ✓Level: multi-level gypsum and marble need more time and labour.
On timing, a flat usually runs from several weeks up to a few months, several months for a villa, while an office floor depends on its size and the building’s hours. You get a written stage programme as soon as the scope is signed off; before then any duration would be a guess, so we do not give one.
Hiring each trade yourself or a single finishing contractor in Jubail?
You can hire an electrician, plumber, plasterer, tiler and painter separately and save the general contractor’s margin, but then you are the one coordinating them: who starts, who waits for whom, and who carries a mistake that surfaces in somebody else’s stage. In Jubail that load is heavier because most trades travel in from outside the city, and every day of waiting is a wasted trip. Hand the job to a single contractor and the programme, the testing and the handover become one firm’s responsibility.
What a finishing contract should state
- ✓Scope room by room: what is done in each room and what is not.
- ✓Materials and level: tile type and size, paint type, door type, without brand names unless agreed.
- ✓How quantities are measured: floor area for a package, or actual measurement for items.
- ✓Exclusions: cabinets, appliances, furniture, AC units and facades if they are not included.
- ✓Schedule and payments: payments against completed and checked stages, not the passing of time.
- ✓Variations: how any change the owner asks for after signing is priced.
- ✓Handover: the snagging walk, the signed list and the documents.
The Saudi Contractors Authority offers a unified contracting contract through its «مقاول» platform; when both sides accept it online it can be enforced directly, and it has ready templates covering plaster and finishing trades.
Common finishing mistakes in Jubail homes and offices
- ✓Tiling a bathroom before the waterproofing is flood-tested, then finding the leak in the ceiling below.
- ✓Fixing a gypsum ceiling before AC routes are agreed, then cutting it open for ducts.
- ✓Painting an older Al-Balad house without opening its electrical board, then chasing walls for new cables.
- ✓Laying carpet tiles on an unlevelled floor, so dips show through after a few months.
- ✓Removing a wall between rooms without confirming its type from the drawings and an engineer.
- ✓Accepting a villa without a written, signed snag list, so defects get lost between trades.
How to book a finishing contractor in Jubail
- 1Message us
a drawing or rough dimensions, pictures of each space, how far the build has got, the level you have in mind, and Industrial City or Al-Balad, all to WhatsApp 0547879578. - 2Ballpark figure
a rough number against the nearest package, plus a note of anything only a visit can price. - 3Site visit
we look at the shell or current finishes, open the board, inspect the wet rooms and mark which partitions could come out. - 4Scope and contract
items room by room, materials and level, schedule, payments against completed stages, and the variation method. - 5Works and tests
services tested and photographed before closing, then surfaces in order. - 6Walk and handover
a taped, written snagging walk, then a second walk with you and handover.
Prefer typing to calling? Use the visit booking form, and look through completed work under projects.
Reasons Jubail owners choose Aemar Al-Maryam for finishing
■ One trade schedule
you do not chase the electrician, plasterer and tiler; we sequence them and follow each stage.
■ Tests before closing
drains, supply, waterproofing and electrics are tested and photographed before they are covered.
■ A written snagging walk
you accept your home against a signed list, not a general impression.
■ Published prices
package rates and item prices are in front of you before you call.
■ Both authorities
Royal Commission and Marafiq in the Industrial City, Balady and the power company in Al-Balad.
■ Clear limits
no kitchen joinery from us, and no structural wall is touched unless an engineer has reported and a permit is in hand.
Where we finish in Jubail
Our crews come up from Dammam on booked days. In the Industrial City that means Al Fanateer and its neighbouring housing districts, plus office and administration buildings on each building’s terms; in Al-Balad it means Al Dhabab, Ghirnatah, Al Hamra and the streets around them. Further down the coast we cover finishing work in Ras Tanura, inland we cover finishing work in Abqaiq, and the long-form guide to stages and items lives on our Dammam finishing page.
A finishing contractor in Jubail with a clear schedule
Send the plan and room photos, or call, and we will arrange the inspection and estimate before setting out from Dammam.