Formwork
Level and tight so concrete does not leak.
Formwork, rebar and pouring for footings, slabs, floors and stairs, with compaction and water curing afterwards.
A good pour needs preparation before the mixer arrives: clean, level formwork, rebar at the specified sizes and spacing, and the right cover. During the pour we vibrate out the air, and afterwards we water-cure it for days.
Pouring footings, slabs and concrete floors
Methods and equipment
Level and tight so concrete does not leak.
Removes air and fills voids around the bars.
Spraying or covering after pouring.
How it is done
We visit the site, look at the pour location and dimensions first-hand, take measurements and photos, and hear exactly what you need.
We set out the items, materials and expected duration clearly, with the price set after inspection and agreement.
The crew starts on the agreed date with the right equipment, protecting the surroundings and cleaning as the work goes.
We go through the work with you item by item, remove the debris and hand the site back clean.
Estimated prices
The price depends on measurements, site condition and access; we set it out item by item after the inspection.
Estimated prices — final price after site inspection and agreement
Fill in the details and WhatsApp opens with your request so we can arrange the inspection.
Your request is saved.
Open WhatsApp to send the requestArticles
Concrete pouring in Al Khobar for villas and apartment buildings: hourdi roof slabs placed by pump, columns…
Read articleConcrete pouring in Dhahran for villas and annexes: termite treatment followed by blinding, footings, ground…
Read articleConcrete pouring in Qatif and Tarout: rooftop room and annex slabs placed with a crane-lifted bucket where…
Read articleConcrete pouring in Saihat for villa and annex roofs, yards and footings: in hot weather we time roof pours…
Read articleConcrete pouring in Jubail for warehouse and workshop floors levelled by laser screed and power-trowelled,…
Read articleConcrete pouring in Al-Ahsa for rest houses, farms and villas: large mesh-reinforced courtyards with joints…
Read articleFAQ
We order ready-mix to the required specification and receive it on site.
It depends on the element and weather; we never strike early.
Yes, with falls for rainwater.
Structural elements follow the structural drawings; for simple floors we agree thickness and mesh with you.
By quantities (cubic metres), steel and formwork; the price follows inspection and measurements.
Other services