Skip to content

Dammam and every Eastern Province city

العربية
Interior finishing

Finishing Contractor in Al Khobar – New Flats, Villa Facades, Shop Fit-Outs & Room Merging

Finishing Contractor in Al Khobar

A finishing contractor in Al Khobar is usually needed at a very particular moment: the day you collect the keys to a new flat in Al Hada and find it a bare shell, or finished in a way that does not suit you; the day the structure of your villa in Al Khobar Al Janubiyah is complete and the facade and interior are still waiting; or the day you lease an empty shop in Madinat Al Ummal and want it trading as soon as possible. Aemar Al-Maryam General Contracting runs the entire finishing job to a single programme: electrical and plumbing first-fix, pressure-tested and photographed before plastering, then waterproofing, plaster, gypsum board, tiles, paint, doors and fittings, together with room merging by removing non-load-bearing partitions. For a shell, the per-square-metre rate (on floor area, materials and labour together) is SAR 650 at the low end, SAR 830 in the middle and SAR 1,100 at the top, all provisional until we visit and you sign off the scope. Ring or message us on 0547879578.

Being a coastal city, Al Khobar forces a few finishing choices of its own. High humidity makes it more important to let plaster dry before painting; salty air wears out metalwork and exterior paint faster; and the shallow groundwater found in many parts of the Eastern Province can push damp and salt into the bottom of ground-floor walls unless it is dealt with before finishing. The work also changes with the building. A flat in an occupied block in Al Thuqbah or Al Aqrabiyah comes with a shared lift and neighbours on every side; a villa in Al Olaya or Al Hizam Al Akhdar has facades, a roof and a courtyard; a shop has a glass frontage and a landlord who is counting the days to opening. This guide walks through each case the way we actually handle it, including rates, a costed Al Hada flat and the checks to run when you take the keys back.

In short: finishing in Al Khobar with Aemar Al-Maryam

  • What we finish: new flats handed over as shell or developer-finished, villas inside and out including cornices, shops and offices, majlis rooms and annexes, and room merging.
  • Rates per m² of floor, materials in: SAR 650 and up for economy, SAR 830 and up for standard, SAR 1,100 and up for premium; one-off designs and labour-only jobs are priced on site.
  • Before any render goes on: water pipes proved under pressure, drains proved with a 3 m-plus head of water for fifteen minutes or more, and every route photographed for your records.
  • Room merging: removing a non-load-bearing block partition from SAR 185, a debris load within Al Khobar from SAR 90, and a new gypsum board partition from SAR 165/m².
  • What we do not supply: kitchen cabinets, appliances, furniture and AC units.
  • For an estimate: send the plan, room photos, your district and the level you want on WhatsApp 0547879578.

Finishing contractor in Al Khobar: where does our work start?

A finishing contractor in Al Khobar starts from whatever stage your property has reached, not from a fixed checklist. If it is a shell with no services, we start with first-fix. If the developer handed it over plastered and tiled, we start with the changes you want. If you are living in it, we plan the work room by room.

We act as the general contractor for the finishing: we work out the quantities, put the trades in an order where nobody ruins someone else’s work, and inspect each stage before the next one covers it. Every trade has its own Al Khobar article with full detail and item prices, and the service in brief sits on our finishing and interior extension service page. These are the jobs that reach us most often from Al Khobar:

■ New flat handed over as a shell

Block walls and concrete ceilings, with everything still to do from services to paint. Priced with the per-m² packages.

■ Flat finished by the developer

The finish is there but does not suit the owner: a partition to remove, tiles to change, gypsum and lighting to add. Priced item by item.

■ Villa from shell

The full interior, plus facades with cornices, plaster and paint, and the roof and courtyard. Interior per m², exterior at inspection.

■ Lived-in home needing a refresh

We split the job by room so part of the home stays usable, and we protect floors and furniture.

■ Shop or office

Floors, ceilings, lighting, a glass frontage and door, on a tight schedule because rent runs from day one.

■ Merging rooms

Removing a non-load-bearing partition between two rooms or between kitchen and living room, then repairing floor and ceiling and moving switches.

What is not part of our finishing work in Al Khobar?

We say this up front so you can compare prices on the same basis, because some quotes quietly include items and others quietly leave them out:

  • ✓Cabinets and worktops: our part ends with the kitchen piped, wired, waterproofed, tiled and painted, ready for the joiner. More in kitchen renovation in Al Khobar.
  • ✓Appliances and furniture: we do not supply household appliances or furnish the home.
  • ✓AC units: we prepare drain routes, pipe sleeves and unit positions; the units themselves and their installation are for an AC specialist.
  • ✓Wardrobes and dressing rooms: not part of our work, though we can leave their positions ready with power and lighting if you ask.

Apartment finishing in Al Khobar: from a new Al Hada flat to a lived-in block

Apartment finishing in Al Khobar usually falls into one of two cases: a new flat you are receiving from the developer, or an older flat you want to refresh, either while you live in it or before you move in. In both cases the shared building shapes the way we work: the lift, the hours when noise is allowed, where debris can be collected, and the neighbour below you.

Just received a new flat in Al Hada? What to check before we start

Before any finishing, make sure you know exactly what the developer handed over, because whatever you discover after work has started is hard to claim later. On the inspection visit we walk these points together and note each one:

  • ✓Levels: is the floor level from room to room, and is the bathroom set low enough to allow falls towards the drain?
  • ✓Existing services: if the developer has run electrical conduits or plumbing, we trace their routes and test them before building on top of them.
  • ✓Cracks and damp: cracks in the blockwork at columns, or water marks in the ceiling from the flat above.
  • ✓External windows and doors: has the developer fitted them, are they double-glazed, and are they properly sealed against air and water?
  • ✓Meter and earthing: where the meter and main panel are, and whether an earthing point exists.

A developer-finished flat does not mean starting from zero

If most of the developer’s finish is sound, there is no reason to tear it all out. We identify only what is worth changing: a partition to remove, a gypsum ceiling with lighting, the living-room tiles, the paint. That costs far less than a full package, and we price it item by item from the table below.

Before plastering: pressure tests and photographed routes in the flat

The most important hour in finishing a flat is the hour before the walls are closed. Once the supply pipes are laid in the chases cut into the blockwork, we connect them to a pressure gauge, hold them at no less than working pressure and watch the needle. The drains and vents are tested with water, using a column at least 3 metres high that must hold for at least fifteen minutes, as the Saudi plumbing code requires. After the tests the engineer photographs every route from two angles and records which room it belongs to.

Apartment Finishing in Al Khobar
A shell-flat bathroom in Al Thuqbah: the new supply pipes connected to a pressure gauge while the engineer photographs the routes before plastering.

Why the photos? Because in a couple of years the flat will need a screen hung, a cabinet fixed or a mixer changed, and whoever does not know where the pipe runs may drill straight into it. The photos are also your reference for any technician who comes after us, so nobody breaks open a whole wall hunting for a pipe. You receive them in a folder sorted by room, together with the test record. Plumbing detail and item prices are in plumber in Al Khobar, and electrics in electrician in Al Khobar.

Refreshing the finish of an occupied flat in Al Khobar

In a lived-in flat we plan three things before starting: where the family lives while we work, how debris leaves the building without damaging the lift and corridors, and when the noisy jobs happen. Floors that are staying are covered with cardboard sheets, the rooms we are working in are sealed off with plastic curtains, and debris goes down in closed bags at times agreed with the building caretaker. If the block has an owners’ association, we go through its rules for interior works with you before we begin.

If the refresh is more about defects than looks, such as old damp, cracks or a leak, head first to renovation contractor in Al Khobar, because renovation fixes the cause before covering it up.

Finishing stages in order in Al Khobar

Finishing stages in Al Khobar follow a simple logic: whatever will disappear inside a wall is installed first, then tested and photographed; then come the wet trades with water and mortar; then the surfaces you see; and last of all, the pieces that scratch easily. Trades may overlap between different rooms, but never inside the same room. This is the sequence we work to:

  1. 1
    Inspection and planning
    We measure, review the drawings and settle where furniture and appliances go, because that decides where sockets, water outlets and lights must be.
  2. 2
    Structural decisions
    Walls to be removed and new openings are decided here, and any doubtful wall is seen by an engineer before anyone touches it.
  3. 3
    Removal and breaking out
    Non-load-bearing partitions come out and the debris goes to licensed disposal sites.
  4. 4
    Electrical first-fix
    Conduit and boxes for every point, low-current cabling on its own route, then photos.
  5. 5
    Plumbing first-fix
    Supply, drainage and venting, then pressure and water tests before anything is covered.
  6. 6
    AC provisions
    Drain routes, refrigerant pipe paths and core holes through concrete, all before the gypsum goes up.
  7. 7
    Membranes and insulation
    Wet rooms sealed and flood-tested; in new buildings, the walls and roof get their thermal layer too.
  8. 8
    Render
    Level dots and screeds, angle beads, a strip of mesh at every block-to-concrete joint, then days of damping down.
  9. 9
    Board ceilings
    Only once the wiring and AC routes are fixed; wet rooms get moisture-resistant board.
  10. 10
    Tiles and marble
    Floors plus bathroom and kitchen walls, with falls towards the drains.
  11. 11
    Skim and undercoats
    On dry render only, with interior doors and windows hung afterwards.
  12. 12
    Fittings and final coat
    Sockets, switches, lights, mixers, basins and heaters, then the last coat of paint, cleaning and handover.

The hold points we never skip in Al Khobar

StageWhat we check before moving onWhy
Plumbing first-fixSupply held at no less than working pressure; drains tested with a water column of 3 m or more for at least 15 minutesA leak after tiling means breaking out
Electrical first-fixCircuit continuity and separation of low-current cabling, then testing before energisingA fault inside a wall cannot be seen
Bathroom waterproofingFloor flooded to 2.5–10 cm and left 24–72 hoursBathrooms are where water most often reaches the neighbours
PlasterLine and plumb checked with a straightedge and level; tapping for hollow spotsPaint cannot hide a wall that leans
Large-format tilesWithin 3 mm under a 3 m straightedge; in bathrooms and kitchens at least 95% of each tile back bedded in adhesiveA hollow tile cracks
Final electricsThe 30 mA residual-current device trips on test, and insulation resistance is at least 1 MΩ at 500 V DCThe safety of whoever lives there

A rule that matters more in Al Khobar

The humidity here slows the drying of plaster and filler. We do not judge a wall by touch; we wait the proper time, because cement plaster can need around 28 days to dry fully before ordinary paint, and much of the paint peeling seen in coastal homes comes from rushing this step.

Villa finishing company in Al Khobar: interiors, facades and roof

A villa finishing company in Al Khobar deals with three quite different parts of the same house: the interior with its many bathrooms, majlis and halls; the facades that face the sun and the salt air; and the roof and courtyard, which need waterproofing, falls and outdoor floors. The interior is priced with the per-m² packages, while facades, roof and courtyard are priced at inspection because they differ so much from one villa to the next.

Villas are where mixed levels are most often requested: the majlis, main hall and entrance at premium level, bedrooms at standard, and the service room and store at economy. We schedule both floors together so that no crew is working upstairs over brand-new tiles downstairs. Each villa bathroom is waterproofed and tested on its own; the details are in bathroom renovation in Al Khobar.

Villa facades and cornices in Al Khobar

Cornices on Al Khobar villa facades are usually precast pieces fixed along the parapet line and around the windows once the external plaster is complete and true. We fix them from a properly erected steel scaffold, fill the joints between pieces, and then the exterior paint goes on in one or two colours.

Villa Finishing in Al Khobar
A two-storey villa facade in Al Khobar Al Janubiyah: a white precast cornice being fixed along the parapet above a facade painted in a light stone colour.
  • ✓External plaster: in coats, with mesh where concrete meets blockwork, then cured with water. More in plastering contractor in Al Khobar.
  • ✓Exterior paint: a suitable primer, then a paint made for exteriors that copes with sun and humidity; see painting contractor in Al Khobar.
  • ✓Natural stone: in humid coastal areas it needs a protective treatment so it does not stain or erode.
  • ✓External metalwork: railings, clamps and outdoor electrical boxes in rust-resistant materials, because salty air speeds up corrosion.

Roof and courtyard in Al Khobar villas

The roof is part of the finishing and should not be left to the end. Its waterproofing and thermal insulation go in before AC units and water tanks are set on it, and the falls to the rainwater outlets are checked before tiling. In the courtyard the finished level is set so rain and hose water drain away from the front door, not towards it. For membrane systems and rates read roof waterproofing and insulation in Al Khobar; for interlock courtyard paving in interlock paving in Al Khobar.

⚠ Damp at the base of walls before finishing the ground floor

Groundwater lies close to the surface in many parts of the Eastern Province, and capillary rise can carry salts some 75 cm up a wall. White crystals or blistering low on ground-floor walls mean you should cure the source first; otherwise fresh render and paint will fail the same way.

Economy, standard and premium finishing in Al Khobar: the difference item by item

The difference between economy, standard and premium finishing in Al Khobar is not the number of stages. The stages and the tests are the same at all three levels. What changes are the materials you see: the type and size of the tiles, the shape of the ceilings, the kind of paint and the doors. This table shows what changes:

What changesEconomyStandardPremium
Rate per m² starts atSAR 650SAR 830SAR 1,100
FlooringLocally made ceramicPorcelain of roughly 60×60Big-format porcelain or marble
CeilingsDamp-proof board only over bathroomsPlain level ceilings over halls and majlisStepped ceilings with hidden light coves
Wall paintBudget gradeBetter gradeTop grade or decorative finish
Internal doorsBasicUpgradedSolid-core
Services and testingIn fullIn fullIn full
Wet-room sealingFlood-testedFlood-testedFlood-tested

Economy suits a flat being prepared for rent, an annex or service rooms. Standard is the level most often chosen for owner-occupied flats in Al Khobar. Premium is usually requested for the majlis and main halls of villas. Anything beyond premium, such as imported stone or bespoke detailing, is priced after we have seen the design.

Put the money where you spend your time

The flat does not have to be one level throughout. Every guest sees the living room and entrance; nobody sees the laundry room. We price each part by its area and level, so you know where every riyal goes.

Finishing price per square metre in Al Khobar

Expect our finishing price per square metre in Al Khobar to open at SAR 650 (economy), SAR 830 (standard) and SAR 1,100 (premium). We apply it to the floor plan area of the flat or villa; it covers labour plus materials of the named grade; and it moves with the state of the shell, how many bathrooms there are, the design and your material choices. Nothing is final before the site visit. Left outside it: kitchen cabinets, appliances, furniture and AC units.

PackageRate per m² of floor fromMain contents
EconomySAR 650Wiring and plumbing from first fix to fittings, sealed wet rooms, cement render, locally made ceramic, budget paint, basic doors, damp-proof board over bathrooms, fixtures fitted
StandardSAR 830The economy content, upgraded to roughly 60×60 porcelain, plain board ceilings over the living spaces, and better paint and doors
PremiumSAR 1,100Marble or big-format porcelain, stepped ceilings with hidden lighting, top-grade or decorative paint, solid-core doors
Beyond premium / one-off designPriced on siteImported stone and detailing drawn for your home
Labour onlyPriced on siteCharged by item while you buy the materials
Villa facades, cornices, roof and courtyardPriced on siteDriven by area and detail
Shops and officesPriced on siteDriven by the trade and the frontage

You may see offers in Al Khobar that start from much higher figures under the same name. Usually that is because they are calculated on a different basis: some measure the square metre on wall area rather than floor area, some include facades or cabinets, and some never say what is included at all. Always ask: which area is the rate applied to, and what does it include? All our service prices are gathered on the prices page.

Item prices for finishing and room merging in Al Khobar

If your flat has been finished by the developer and you want specific changes, or you have a plastered shell and need only some items, here are the item rates, unchanged from our individual trade articles:

Work itemFromCharged perRead more
Wiring first fix, villa or building (labour)SAR 28m² of planElectrician article
Each electrical point in a first-fix jobSAR 37pointElectrician article
Pipework first fix, new building (labour)SAR 23m² of planPlumber article
Pipework first fix: one bathroom / one kitchen (labour)SAR 460 / 135roomPlumber article
Wet-room membrane, flood-testedSAR 26m²Insulation article
Internal render with materialsSAR 13m²Plastering article
Internal render, labour only, dotted and screededSAR 11m²Plastering article
Board ceiling: plain / damp-proofSAR 46 / 74m²Gypsum article
Board ceiling: stepped / with hidden lightingSAR 110 / 138m²Gypsum article
Budget ceramic with adhesive, supply and laySAR 37m²Tiling article
Tiling labour: ceramic / porcelain to 60×60 / 60×120SAR 23 / 32 / 37m²Tiling article
Laying marble or granite floorsSAR 92m²Tiling article
Screed levelling / skirtingSAR 14 / 14m² / metre runTiling article
Interior emulsion with materials: budget / top gradeSAR 14 / 32m²Painting article
Skimming and sanding walls before paintSAR 14m²Painting article
Fitting: socket or switch / downlight / LED stripSAR 18 / 9 / 45each / each / metreElectrician article
Fitting: mixer / basin / water heater with relief valveSAR 75 / 90 / 140eachPlumber article
Taking out a block partition that carries no loadSAR 185wallDemolition article
Breaking up existing tiles with their beddingSAR 14m²Tiling article
Debris truckload inside Al KhobarSAR 90loadDemolition article
New door or window gap in concreteSAR 140openingCutting article
Sawing a concrete wallSAR 280 / 75job / metre runCutting article
Gypsum stud wall, boarded both sides, rock-wool filledSAR 165m²Gypsum article
Cement board stud wall, boarded both sides, insulatedSAR 185m²Cement board article
New blockwork partition, renderedPriced on site——
Aluminium and glass doors and windowsPriced on site——
Structural wall, beam or proppingPriced on site once the engineer has reported——

How to work out your finishing cost in Al Khobar

  1. 1
    Start with the floor area
    Read it off the deed or plan, or measure every room, multiply length by width and total them, corridors and bathrooms included.
  2. 2
    Split the area by level
    What you want at premium, what standard is enough for, and what can be economy.
  3. 3
    Multiply each part by its rate
    SAR 650, 830 or 1,100 per square metre.
  4. 4
    Add the alteration items
    Removing a wall, building a new partition or cutting an opening in a concrete wall, from the item table.
  5. 5
    Keep a margin for surprises
    Hidden damp or a shell that needs repair. Many contractors advise keeping around 10% of the budget aside.
  6. 6
    Leave out what is not finishing
    The kitchen, appliances, furniture and AC units have their own budget.

Worked example: a 140 m² shell flat in Al Hada with two rooms merged

Treat the following as an illustration only. Picture a 140 m² flat in Al Hada, received from the developer as a bare shell. The owner wants the living room, majlis and entrance (55 m²) at premium level and the rest of the flat (85 m²) at standard level, and wants two small bedrooms merged into one. According to the drawings, the block wall dividing them supports nothing above.

ItemCalculationStarts from
Living room, majlis and entrance (premium)55 m² × 1,100SAR 60,500
Rest of the flat (standard)85 m² × 830SAR 70,550
Removing the partition between the bedroomsone wallSAR 185
Debris removalone load within Al KhobarSAR 90
Estimated totalSAR 131,325

For comparison: the whole flat at standard level would start from SAR 116,200 (140 × 830), at economy from SAR 91,000 (140 × 650) and at premium from SAR 154,000 (140 × 1,100). Because the merge happens before tiling, there is no untiled strip where the wall stood: the new floor is laid across the merged room in one go. The figure excludes kitchen cabinets, appliances and AC units.

How a finishing budget is split across items

An Eastern Province contractor has published an approximate split that is useful for comparison. It varies from home to home, but it gives you an idea of where the money goes:

Budget lineRough shareWhere savings make sense
Flooringaround 25%Big formats in the halls only, smaller tiles in bedrooms
Board ceilings and paintaround 20%Plain ceilings in bedrooms rather than stepped ones
Wiring and pipework first fixaround 15%Nowhere: it ends up buried and costly to put right
Doors, windows, aluminiumaround 15%Basic doors for service rooms
Fixtures and fittingsaround 15%A simpler range in the guest bathroom
Reservearound 10%Released only when something unexpected appears

Merging rooms in Al Khobar: removing non-load-bearing partitions safely

Merging rooms in Al Khobar works when the dividing wall holds nothing up, as is normally true in concrete-frame buildings where columns and beams carry the slabs and the block walls simply divide the space. But “usual” is not enough. Some walls sit under a beam that was designed to bear on them, some are shear walls, and in older houses the walls themselves may carry the load. So we never remove a wall before we know what it is from the drawings, and if the drawings are unclear, from an engineer on site.

Merging Two Rooms in Al Khobar
A flat in Al Hizam Al Akhdar after a non-load-bearing block partition was removed: the tiler sets a matching tile in the old wall strip while the electrician moves the switch box.

Merging two rooms in Al Khobar, step by step

  1. 1
    Confirm what the wall is
    From the structural drawings, and from an engineer when needed. We do not rely on thickness or on the sound of tapping.
  2. 2
    Find what is inside it
    We locate electrical conduits, water pipes and any AC routes in the wall, and isolate the circuit.
  3. 3
    Protect
    We cover nearby floors, doors and windows and seal off the rest of the flat with dust curtains.
  4. 4
    Remove from the top down
    Course by course, without striking columns or beams, then debris goes to licensed disposal sites.
  5. 5
    Make good around the wall
    The floor strip, the ceiling junction and the side walls where the partition was tied in.
  6. 6
    Electrics and lighting
    Relocating any switch or socket the old wall carried and laying out fresh lighting for the bigger room.
  7. 7
    Paint
    Painting the whole merged room so the colour is uniform.

What about the floor tiles where the wall stood?

This is the point that worries owners of developer-finished flats the most. After removal, a strip roughly the width of the wall is left without tiles. If you have spare tiles from the same batch the developer used, we lay them and the strip all but disappears. If not, tiles from another batch may differ slightly in shade, and we suggest one of two solutions: a marble or porcelain threshold in a contrasting colour that looks intentional, or retiling the whole merged room. Lifting old tiles and their bed costs from SAR 14/m²; for laying methods see tile installer in Al Khobar.

Turning the kitchen into an open-plan space in Al Khobar

An open kitchen is a common request in new flats, but it needs two decisions before the wall comes down: where the cooker hood and its outlet go so that smells do not spread through the flat, and whether part of the wall stays as an island or a half-height divider. We re-plan the kitchen’s electrical and plumbing points before the cabinet maker arrives. The same applies to any kitchen being re-planned; see kitchen renovation in Al Khobar.

Cutting a door or opening in a concrete wall in Al Khobar

A concrete wall is not broken with a hammer. It is cut cleanly with a diamond saw after an engineer has reported on the lintel and any strengthening. Each new door or window gap in concrete is from SAR 140, a wall-sawing job from SAR 280 or SAR 75 for every metre of cut, while lintels and propping are priced on site. Details are in concrete cutting in Al Khobar and our Al Khobar wall openings guide.

Building a new partition after merging

Sometimes merging is half the answer and the other half is a new partition in a better place, for example enlarging the living room and then closing off a corner as a small study. A dry partition is faster and cleaner in an occupied flat: a gypsum stud wall boarded on both faces and packed with rock wool against noise from SAR 165/m², or a cement-board version with insulation from SAR 185/m², which copes better beside bathrooms and kitchens. Blockwork with render is priced once we have seen the space.

Permits: when do you need one?

JobPaperworkHandled by
Taking out a partition that carries nothing; new tiles or paintNormally none, as it counts as interior maintenanceUs directly
Repairs returning the building to its original state with no structural changeA restoration permit on the Balady platformAn engineering consultancy
Structural wall, beam, cut in a concrete wall, extra roomEngineer’s report plus the Balady service for altering building componentsEngineering consultancy first, then us

⚠ A load-bearing wall is not the contractor’s call

Should a wall prove to be structural or to carry a beam, work halts until an engineer has reported. Removing a load-bearing wall without propping and strengthening can crack the slab and walls above it, and in an apartment block the damage can reach the neighbours’ flats.

Shop finishing in Al Khobar: from an empty unit to a glass frontage

Shop finishing in Al Khobar differs from home finishing in one basic way: time. The tenant pays rent from the day of handover, so every week of delay is money lost. That is why we start with the layout and the materials list before we set foot in the unit, and we order the long-lead items, such as thick glass and the door, on day one so they are not the last thing the opening is waiting for.

Shop Finishing in Al Khobar
A shop in Madinat Al Ummal at its last stage: a glass door in an aluminium frame being fitted on a floor spring, with matt grey porcelain underfoot and a gypsum ceiling with round light cut-outs.
  • ✓Floor: matt porcelain that stands up to foot traffic and is not slippery, laid accurately level because the shop is seen from the frontage.
  • ✓Ceiling: gypsum board with neatly set round light cut-outs and access panels for AC and electrics.
  • ✓Electrics: separate circuits for lighting, sockets, AC and the sign, according to the activity.
  • ✓Frontage and door: thick glass in an aluminium frame with a door on a floor spring, sourced through a specialist supplier, then fitted and adjusted by us, and priced at inspection.
  • ✓Washroom and basin: where there is one, waterproofed and tested like any bathroom.

Before fitting out, ask the landlord what is allowed on the frontage and the sign, and ask the relevant authority for the requirements of your activity, because some activities have rules on ventilation, floors or emergency exits. We carry out the fit-out to whatever requirements you receive; we do not issue activity licences.

Office fit-out in Al Khobar

An office usually needs dry partitions to separate rooms and reduce noise, gypsum ceilings with access panels, and plenty of low-current cabling for networks and cameras. Gypsum board and cement board partitions are priced at the rates in the item table.

Majlis, annex and building entrance finishing in Al Khobar

The majlis is the room a house is judged by, which is why it is often finished at premium level even in mid-range homes: gypsum with levels and concealed lighting, large-format porcelain or marble, and the best paint. When the majlis stands as its own annex in the courtyard, see annex and majlis builder in Al Khobar for building and finishing it in one go, because an annex is an open room with few bathrooms and its cost is worked out differently.

Entrances and stairwells of apartment blocks in Al Khobar need a different kind of finish because they are shared circulation space: a floor that takes heavy traffic and cleans easily, lighting that runs all night, and paint that stands up to scuffing. If the building is occupied, we phase the work so the entrance stays passable at all times. Entrances are priced at inspection.

The trades inside finishing in Al Khobar: first-fix, insulation and surfaces

Many trades work within one finishing job, and each has its own Al Khobar article. Here is what matters to you from each of them, in order, and what to ask about:

■ Electrics

First-fix from SAR 28 per m² of plan area (labour), with a panel that has residual-current protection for bathrooms and sockets. Details

■ Plumbing

Bathroom first-fix from SAR 460 and kitchen from SAR 135, tested before closing. Details

■ Air conditioning

Drain routes, pipe paths and core holes before the gypsum. Core drilling

■ Insulation

Bathroom waterproofing from SAR 26/m² with a flood test, and thermal insulation in new buildings. Details

■ Plaster and gypsum

Plaster from SAR 13/m² including materials, flat gypsum from SAR 46/m². Gypsum

■ Tiles and paint

Economy tiles from SAR 37/m² supplied and laid, paint from SAR 14/m². Paint

Thermal insulation and the electricity connection for new buildings in Al Khobar

For a newly built home, insulating walls, roof and glazing is no optional extra. It is a regulatory requirement, and the electricity company asks for a coordination certificate covering site checks of the walls, roof and windows before connection, alongside earthing and the meter position. So we settle the type of insulated block or wall insulation, the roof insulation and the window glazing before plastering and before the windows go in, not afterwards.

The Saudi Building Code in finishing

We carry out finishing items in line with the Saudi Building Code that applies to residential buildings, and we apply the test values listed in the hold-point table: water testing of drains, pressure on the supply, checking the electrics before energising, and flood testing of bathrooms.

How long finishing takes in Al Khobar

A flat usually takes weeks to months, a villa takes months, and a shop is often quicker because it has less area and fewer trades. We do not give you a number before the scope is fixed, because the duration depends on four things:

  • ✓How quickly you approve materials: tiles, paint and doors. Every week of delay in choosing is a week on the schedule.
  • ✓Drying times: plaster and filler in Al Khobar’s humid air need time that cannot be cut short.
  • ✓The size of the alterations: merged rooms or concrete openings add days for removal and making good.
  • ✓Building constraints: permitted working hours in the block, the lift, and where debris can go.

After agreement you receive the stage plan with target dates, and early warning, with reasons, if any stage runs late.

What raises or lowers finishing cost in Al Khobar?

FactorRaises the cost whenLowers it when
Condition of the shellWalls lean or the floor is out of levelThe shell is true and its levels are correct
Number of bathroomsAn en-suite for every roomFewer bathrooms placed close together
Changes of mindChanges after first-fix mean breaking wallsDecisions are made before first-fix
LevelPremium in every roomLevels mixed according to use
Damp and saltsThey appear on the ground floor and need treatmentThe building is dry and its insulation sound
AccessA high floor with no lift, or a lift with restricted hoursEasy access and debris collection close by

The site inspection before pricing finishing in Al Khobar

From the inspection we come away with a written list, not an impression. This is what we check:

  • ✓Area and drawings: we measure and compare with the drawings, and note the bathrooms, kitchen and walls to be removed.
  • ✓The shell: straightness of walls, levels, cracks, and any exposed steel or damaged concrete.
  • ✓Damp: the bottom of ground-floor walls, and ceilings under bathrooms and the roof.
  • ✓Existing services: their routes and condition, and whether they can be tested and reused or must be replaced.
  • ✓Access: the floor, the lift, where the debris truck can stand, and working hours.

We then send you an estimate by package or by item, with what is out of scope stated clearly. If something needs an engineer’s opinion, such as a wall that may be load-bearing, we raise it before anything is agreed.

Receiving finishing work in Al Khobar: an owner’s checklist

On handover day, do not settle for a look around. Bring a straightedge (a long aluminium rule) and a cup of water, and walk through these items with us:

CheckMethodPass mark
Floor flatnessRest the straightedge in several directionsNo visible gap; 3 mm in 3 m for big tiles
Drummy tilesTap lightly with a screwdriver handleA solid, not hollow, note
Shower and bathroom fallsTip a cup of water onto the floorIt heads for the drain with no puddles
Walls and ceilingsSight along them with light from the sideSmooth, with nothing worse than hairline cracks
ElectricsSwitch every point and press the RCD test buttonAll points live; the RCD cuts out
PlumbingRun each tap and check under every basinDry joints
Doors and windowsWork each one through its full swingNothing rubs; all hardware fitted
PaperworkRequest the fileService-route photos, test sheets, materials list, signed snag list

Every point goes on a list and is closed item by item before final handover. If you need ongoing building maintenance later, see building maintenance in Al Khobar.

One contractor or several? And what goes into a finishing contract in Al Khobar?

You can hire each trade separately and save a little on paper, but you then become the coordinator: who comes first, who waits for whom, and who answers for a stage that spoiled the next one. A single contractor carries the sequencing and coordination and is answerable for the whole result. Either way, write the contract clearly. The unified contracting agreement on the «Muqawil» platform of the Saudi Contractors Authority can be enforced like a court instrument once both sides have accepted it.

  • ✓Scope: every room, what is done in it and the agreed level.
  • ✓Materials: type, size and specification, or approved samples.
  • ✓Exclusions: kitchen, appliances, furniture and AC units, plus anything else left out.
  • ✓Schedule: the stages and their estimated dates.
  • ✓Payments: tied to stages that are completed and inspected, not to dates alone.
  • ✓Changes: how they are requested and how they are priced before they are carried out.
  • ✓Handover: the inspection list and how each snag gets signed off.

Common finishing mistakes in Al Khobar

  • ✓Painting over damp plaster: in Al Khobar’s humid air, peeling and stains appear within months.
  • ✓Closing walls before testing: a small leak turns into breaking out a whole bathroom.
  • ✓Removing a wall without drawings: a wall that looks like a partition may be load-bearing.
  • ✓Moving furniture positions after first-fix: this means relocating sockets and outlets in plastered walls.
  • ✓Ignoring ground-floor damp: the new finish fails for the same old reason.
  • ✓Buying tiles with no spares: any later repair forces you onto another batch that may differ in shade, so keep extra tiles from the same batch.
  • ✓Ordinary external metalwork: salty air rusts it quickly.
  • ✓Hanging doors before the wet trades: they get splashed with mortar and swell with moisture.
  • ✓Comparing prices on different bases: floor-area rates against wall-area rates, or a package with no written exclusions.

Finishing or renovation in Al Khobar?

Working from a shell means laying down every layer, hence the SAR 650/m² starting point. Renovation mends a standing home and reuses any render and services still in good order, so full renovation starts at lower rates per square metre. If your home is already standing and has defects such as damp, cracks or leaks, start with renovation contractor in Al Khobar plus our Al Khobar crack repair page. If your plot is empty and you want building and finishing together, start with building contractor in Al Khobar and the construction service page.

How to order a finishing contractor in Al Khobar

The quickest route is one complete WhatsApp message. We come back with a preliminary estimate and then an inspection appointment:

  1. 1
    Send the plan or a dimensioned sketch
    and the floor area if you know it.
  2. 2
    Photograph every room
    from two angles, plus bathrooms, the kitchen and any damp or cracks.
  3. 3
    State the stage and district
    shell, developer-finished or lived-in; your district in Al Khobar and the floor.
  4. 4
    Choose the level and changes
    economy, standard, premium or a mix, and the walls you are thinking of removing.
  5. 5
    Inspection
    we come at an agreed time and check the shell, the walls and access.
  6. 6
    Items and schedule
    we send them in writing with levels, exclusions and stages, and start once agreed.

Plan your Al Khobar finish properly

Share the layout and a few room photos; we reply with a suggested grade for each area and a ballpark figure, then agree a visit date.

What sets Aemar Al-Maryam apart for Al Khobar finishing?

  • ✓Tested before closed: no pipe is covered before it is tested and no wall is closed before it is photographed, and you receive the photos and records.
  • ✓Published prices: per-m² packages and priced items, with exclusions written down.
  • ✓Responsible room merging: we do not remove a wall before we know what it is, and we stop at a load-bearing wall until an engineer decides.
  • ✓One contractor for every trade: electrics, plumbing, insulation, plaster, gypsum, tiles and paint on one schedule.
  • ✓Knowledge of Al Khobar’s climate: humidity and salt are factored into drying times, paints and external metalwork.
  • ✓Short hop from Dammam: our Dammam base is close by, so a supervisor calls at your site regularly.

See finished jobs on our projects page.

Al Khobar districts we finish in, and nearby cities

Our crews cover the whole of Al Khobar: Madinat Al Ummal, Al Olaya, Al Hada, Al Khobar Al Janubiyah, Al Thuqbah, Al Hizam Al Akhdar and Al Aqrabiyah among others. Our Al Khobar services page brings together everything we offer in the city. We also carry out finishing in the nearby cities:

Start your Al Khobar finishing in one step

A photo of each room and a simple plan are enough for a first estimate; we complete the rest at the inspection.

Tags

#finishing_contractor_in_Al_Khobar#finishing_contractor_Khobar#finishing_company_Al_Khobar#villa_finishing_company_Al_Khobar#villa_finishing_Khobar#apartment_finishing_Al_Khobar#flat_finishing_Khobar#Al_Hada_apartment_finishing#new_apartment_finishing_Al_Khobar#interior_finishing_Al_Khobar#shop_fit-out_Al_Khobar#shop_finishing_Khobar#office_fit-out_Al_Khobar#villa_facade_finishing_Khobar#facade_cornices#building_entrance_finishing#finishing_price_per_square_metre_Al_Khobar#apartment_finishing_cost_Al_Khobar#economy_finishing#standard_finishing#premium_finishing_Al_Khobar#finishing_from_shell_Al_Khobar#finishing_stages_in_order#pipe_pressure_test_before_plastering#photographing_services_before_closing_walls#merging_rooms_Al_Khobar#merging_two_rooms_Khobar#removing_a_non-load-bearing_wall#open-plan_kitchen_and_living_room#gypsum_board_partitions#finishing_handover_checklist#Al_Hizam_Al_Akhdar_finishing#Al_Thuqbah_finishing#general_contracting_and_finishing_Al_Khobar

Request an inspection: Interior finishing

Fill in the details and WhatsApp opens with your request so we can arrange the inspection.

Prices are estimates until inspection and agreement; the final price is set after the site visit.

Your request is saved first, then WhatsApp opens with a ready message. Nothing is sent until you press send in WhatsApp.

FAQ

What is the finishing rate per square metre in Al Khobar?

Shell-to-finish work is charged per square metre of floor: SAR 650 upwards at the economy grade, SAR 830 upwards at standard and SAR 1,100 upwards at premium, with labour and grade-matched materials included. These are provisional figures pending our visit, and bespoke schemes are quoted after we review the drawings.

I have just received a new flat in Al Hada. Do you finish it from shell or modify the developer's finish?

Both. A flat handed over as a shell is priced with the per-square-metre packages, while a flat the developer has already finished is priced item by item for whatever you want to change, such as removing a partition, replacing floor tiles or adding a gypsum ceiling with concealed lighting.

Why do you pressure-test the pipes before plastering?

Because a leak discovered after plaster and tiles means breaking out and doing it twice. Supply pipework is held under pressure no lower than it will see in service, and drainage is filled to a head of 3 metres or more and watched for at least fifteen minutes, then photograph every route before the walls are closed.

What do I gain from photos of the pipe and cable routes?

They show where pipes and cables run inside each wall, so nobody drills into a pipe when hanging a TV or a cabinet, and any technician who comes later can trace a fault without random breaking. We hand them over sorted by room together with the test records.

What would a 140 m² shell flat in Al Khobar cost to finish?

Multiply 140 m² by the rate: from SAR 91,000 for economy, SAR 116,200 for standard or SAR 154,000 for premium. Levels can be mixed inside the same flat, and the final figure is fixed after the site inspection.

Do you finish villa facades and fit cornices in Al Khobar?

Yes, as part of villa finishing: external plaster, fixing precast cornices and exterior paint. Facades are priced at inspection because their area and detailing vary widely, and in Al Khobar we recommend exterior materials and paints that cope with humidity and salt air.

Do you fit out shops in Al Khobar?

Yes: floors, gypsum ceilings with light cut-outs, paint and the shop electrics, plus the glass frontage and a door on a floor spring sourced through a specialist supplier. We price a shop after visiting it and learning its trade and the landlord's conditions.

Is it possible to join two rooms into one in Al Khobar?

It is, provided the dividing wall carries no load. Taking out such a block partition costs from SAR 185 per wall, and each truckload of debris taken away inside Al Khobar from SAR 90. Concrete or structural walls stay untouched until an engineer has reported and the proper permit is in hand.

Is there a reliable way to know whether my wall is structural?

Only the structural drawings and a site check by an engineer can tell you. The thickness of the wall and the sound it makes when tapped are not enough, because some walls sit under beams or act as shear walls and this cannot be seen by eye.

What happens to the floor tiles where the wall used to be?

A strip roughly the width of the wall is left without tiles. We fill it with matching tiles if spares from the same batch exist; otherwise we suggest a marble or porcelain threshold strip, or retiling the whole merged room so no difference shows.

Do I need a permit to take a wall out of my flat?

Taking out a partition that carries nothing counts as interior maintenance and normally requires no permit. A load-bearing wall, a new opening in a concrete wall or any work on a beam needs an engineering office and the Balady «add and modify building components» service. In apartment blocks, also check any owners' association rules.

What is the typical finishing time for a flat or villa in Al Khobar?

Expect weeks to a few months for a flat and several months for a villa; the area, the grade and the speed of your material approvals decide where you land. Once the scope is settled we issue a dated stage plan, and until then we will not commit to a timeframe.

Do the finishing packages include the kitchen and air conditioning?

The kitchen gets its pipes, wiring, tiles and paint, and the AC gets its condensate drains and pipe routes. Cabinets and worktops, appliances, the AC units themselves and furniture sit outside every package.

How soon after plastering can I paint?

Only when the cement render is properly dry. We keep it wet for about a week, and full drying can take around 28 days before ordinary paint. Painting over damp plaster leads to peeling and stains, especially in Al Khobar's humid air.

Can I supply the materials myself?

Yes, in which case we price labour only after the inspection. Agree quantities and specifications with us in advance, though, because a missing material or a different tile batch stops work and delays every stage after it.

Which details help you price my finishing over WhatsApp?

A drawing or measured sketch, a photo of each room, whether the unit is a shell, developer-finished or lived in, the level you want, the walls you are thinking of removing and your district in Al Khobar, to 0547879578.

Related services

We work in Khobar and every Eastern Province city:

ع