Compaction
Rollers for the layers before and after asphalt.
Asphalt for car parks, yards and internal roads after preparing and compacting the base layers, with falls for drainage.
Asphalt life starts underneath: levelling the ground, a compacted base course, then a prime coat (MC) sprayed on the base and hot mix laid and rolled. A tack coat (RC) is used only on old asphalt or between asphalt layers. We design falls so water does not pool.
Asphalt for yards, car parks and internal roads
Methods and equipment
Rollers for the layers before and after asphalt.
Draining water to outlets.
Saw-cutting old asphalt at tie-ins and repairs.
How it is done
We visit the site, look at the area and ground condition first-hand, take measurements and photos, and hear exactly what you need.
We set out the items, materials and expected duration clearly, with the price set after inspection and agreement.
The crew starts on the agreed date with the right equipment, protecting the surroundings and cleaning as the work goes.
We go through the work with you item by item, remove the debris and hand the site back clean.
Estimated prices
The price depends on measurements, site condition and access; we set it out item by item after the inspection.
Estimated prices — final price after site inspection and agreement
Fill in the details and WhatsApp opens with your request so we can arrange the inspection.
Your request is saved.
Open WhatsApp to send the requestArticles
Asphalt contractor in Al Khobar for new villa yards laid by paver, house fronts inside the property line, and…
Read articleAsphalt contractor in Dhahran for internal streets in residential compounds, factory and warehouse loading…
Read articleAsphalt contractor in Qatif, Tarout and Safwa: private farm roads paved between the palms with the mix…
Read articleAsphalt contractor in Saihat for residential building car parks primed first and then paved in strips with…
Read articleAsphalt contractor in Jubail for warehouse yards and factory roads in Jubail Industrial City, paved at 7 cm…
Read articleAsphalt contractor in Al-Ahsa for rest-house yards and gateways, farm roads in millings or new hot mix, shop…
Read articleFAQ
Yes, such as yards and driveways; price depends on area and access.
It depends on the traffic (cars or trucks); we set it at inspection.
Sometimes after repairing potholes and cracks; otherwise we remove it.
Once it cools and hardens; we tell you when.
Per square metre, thickness and prep work; price follows inspection and measurements.
Other services