Waterproof before cladding
And flood-test it.
Building and renovating concrete pools with waterproofing and tiling, plus waterfalls, fountains and basins for gardens and entrances; pumps and filters come through a specialist supplier.
A water feature needs sound concrete and tight waterproofing before any cladding, then a circulation loop with pump and filter. We dig, pour, waterproof and clad in stone or tiles, and prepare the services and lighting.
Building pools, ponds, waterfalls and fountains
Methods and equipment
And flood-test it.
Pump and filter sized to the volume.
Earthed electrics and water-rated lighting.
How it is done
We visit the site, look at the location and design first-hand, take measurements and photos, and hear exactly what you need.
We set out the items, materials and expected duration clearly, with the price set after inspection and agreement.
The crew starts on the agreed date with the right equipment, protecting the surroundings and cleaning as the work goes.
We go through the work with you item by item, remove the debris and hand the site back clean.
Estimated prices
The price depends on measurements, site condition and access; we set it out item by item after the inspection.
Estimated prices — final price after site inspection and agreement
Fill in the details and WhatsApp opens with your request so we can arrange the inspection.
Your request is saved.
Open WhatsApp to send the requestArticles
Swimming pool construction in Al Khobar for villas and rest houses: skimmer and overflow concrete pools with…
Read articleSwimming pool construction in Dhahran villa gardens: long concrete lap pools with an even depth and lane…
Read articleSwimming pool construction in Qatif for farms and homes: concrete pools among the palm groves, clear of…
Read articleSwimming pool construction in Saihat homes: compact concrete family pools in the side setback with a…
Read articleSwimming pool construction in Jubail Industrial City and Jubail Al-Balad: freeform reinforced-concrete pools…
Read articleSwimming pool construction in Al-Ahsa for rest houses and farms among the palms and for villa yards in Hofuf…
Read articleFAQ
We suggest ideas for the space and sketch it with you before building.
Good concrete, waterproofing and a water test before cladding.
Yes, we trace the leak and redo waterproofing and cladding.
We use water-rated lights on an earthed circuit.
By size, cladding and equipment; price follows inspection and measurements.
Other services