Skip to content

Dammam and every Eastern Province city

العربية
Bathrooms and kitchens

Kitchen Renovation in Al Khobar – Open-Plan Walls, Sink Waterproofing & Re-Piping

Kitchen Renovation in Al Khobar

Kitchen renovation in Al Khobar: opening the kitchen to the living room where the wall is non-load-bearing, stripping old tiles and replacing the rusted pipes beneath, kitchen plumbing and electrics, sink-zone waterproofing, floor levelling and tiling, an extract outlet to the outside and granite worktop setting on request, without cabinets. A complete small kitchen starts from an estimated SAR 2,300; send photos and measurements on WhatsApp to 0547879578.

Kitchen renovation in Al Khobar at Aemar Al-Maryam General Contracting starts with the bones of the room, not its fronts. Old tiles come up so we can see what lies beneath; any pipe that rust has reached is swapped out; each heavy appliance gets a circuit of its own; the sink area is sealed with a membrane; the floor is brought to one level; and only then do the tiles go down and the hood outlet is cored through to open air. Where the wall shutting the kitchen off from the living space turns out to be a simple partition, we take it out and join the two rooms. The lowest figure for a small kitchen with every core item is SAR 2,300; plumbing first fix begins at SAR 135, sealing at SAR 26 a square metre, and taking out a partition wall at SAR 185. All of these are estimates, fixed only once we have visited and agreed. Phone or WhatsApp us on 0547879578.

Two requests dominate in Al Khobar. Villa owners want the wall between kitchen and dining or living room gone, so the home becomes one bright space. Flat residents live with a hollow-sounding floor, a drain smell that never leaves and blistering paint behind the sink. Either way, the real size of the job only shows once the tiles are up: a galvanised pipe eaten by rust, bedding that has soaked for years, or a floor drifting out of level enough to trouble the carpenter and the washing machine alike.

Coastal humidity speeds all of this up: sink leaks stay wet, salts climb the lower walls, old steel back-boxes rust. So each job starts by asking what lies under the finishes, and the plan follows the answer.

Below you will find our scope and its limits, the rules for knocking through to the living room, the usual surprises under old tiles, first fix and testing, sealing and screeding, then worktops, extraction, ceilings, a priced list and a worked villa example.

Your Al Khobar kitchen renovation at a glance

  • Our work in the kitchen: knocking through partition walls, lifting old tiles, swapping rusted pipework, new points for the sink, dishwasher and filter, separate circuits for the oven, washer and heater, a membrane under the sink area, a levelling screed, floor and wall tiles, a cored hood outlet, a green-board ceiling, render and paint, and a granite top for anyone who wants one.
  • Outside our scope: cupboards of every kind, timber or aluminium, whether buying, building, fitting or mending them. Our part is handing the carpenter a ready room.
  • The kitchen-to-lounge wall: a partition comes out from SAR 185; anything holding up a beam or slab waits for an engineer and a permit.
  • Starting figures: small kitchen, all core items, SAR 2,300. Per square metre: lifting tiles 14, screed 14, membrane 26, floor ceramic 23. Per item: plumbing 135, damaged pipe length 165, power point 75, hood core 140. Granite tops are quoted on site.
  • Tests: a gauge on the supply, a column of water in the drains, a full day of flooding on the membrane and a meter on the cables, all before any tile goes down.
  • Coverage: Al Thuqbah, Al Olaya, Al Khobar Al Janubiyah, Al Hada, Al Aqrabiyah, Madinat Al Ummal, the Green Belt and every other part of the city, plus Dhahran and Dammam.
  • To book: photograph the kitchen and WhatsApp the pictures, sizes and appliance list to 0547879578.

Kitchen Renovation in Al Khobar: What the Work Actually Covers

Kitchen renovation in Al Khobar covers everything between the concrete and the finished surface: the tiles and their bedding, the supply pipes and drains, the cables and breakers, the waterproofing layer, the floor level, the extract outlet, and the ceiling, plaster and paint. These are the parts of a kitchen that fail first, and they are the parts a homeowner never sees when the cabinet doors are resprayed or a new worktop goes in. As long as they are sound, a kitchen will last for many years however often its fronts change. When they are not, no amount of new doors will stop the problems coming back.

We order the work so that nothing has to be broken twice. Demolition and strip-out come first, then the first-fix plumbing and electrics that go into the walls and floor, then the tests, then waterproofing and levelling, then tiling, then the ceiling and paint. At that point the cabinet maker comes in to fit the units, and after that we, or the appliance fitters, come back for the mixer, the sink connection and the final sockets. Each stage has to be finished and checked before the next one covers it.

■ Opening the kitchen

Removing the non-load-bearing block wall between kitchen and living area, finishing the cut ends and completing the floor where it stood.

■ Strip-out and discovery

Taking tiles and old bedding back to the slab, and finding out the real condition of the pipes and floor underneath.

■ New plumbing

Valved hot and cold feeds, a waste outlet serving sink and dishwasher, a filter tap point, all proven before tiling.

■ Appliance electrics

Dedicated circuits for the oven, washer and water heater, sockets above the worktop, and a point for the hood.

■ Waterproofing and levelling

A flexible membrane over the sink zone carried up the wall, and a screed that sets one consistent floor level.

■ Tiles and worktop

Floor and wall tiling in porcelain or ceramic, plus setting whichever granite slab you pick.

A Kitchen Renovation Company in Al Khobar, or Separate Tradesmen?

A kitchen renovation company in Al Khobar earns its place when problems are linked, as they usually are. The plumber needs the cabinet positions, the electrician the worktop height, the tiler a tested pipe and a dry membrane, and the wall-breaker leaves an untiled strip and a cut cable. Hire them separately and you become the coordinator, paying for rework whenever one runs ahead of another.

Taking the whole room, we list every item against one plan, keep the order so nothing gets buried untested, and photograph pipe and cable runs before tiling. A single item, say one pipe length or an oven circuit, is still welcome and priced alone.

Part of the jobDone by a lone tradesmanDone as part of our renovation
Removing the dividing wallThe wall comes down, leaving a bare strip of floor and an exposed cableWe finish the ends, complete the floor and reroute the electrics that ran in the wall
PlumbingRun before the cabinet layout is known, so points land in the wrong placeRun to the cabinet maker’s drawing and tested before closing
ElectricsExtra sockets added to the same old circuitDedicated circuits for heavy appliances and new breakers in the panel
TilingLaid on an unlevelled floor or over an untested membraneLevelling, then a tested membrane, then tiles on the right adhesive

The comparison illustrates how coordination works; it is not a judgement on any particular tradesman.

Cabinets Are Not Our Work: What We Prepare for Your Cabinet Maker

To save you time: kitchen cabinets are simply not something we offer. We do not sell them, build them in a workshop, fit them or repair them, and timber and aluminium units are treated the same. Doors, drawers, hinges and appliances fall outside our work as well. That trade belongs to kitchen carpenters and cabinet shops, and our quotes only ever list what our own crew does. We make the point early because plenty of people in Al Khobar type “kitchen renovation” when what they want is a sagging cupboard fixed, and they deserve to reach the right trade on the first call.

What the carpenter gets from us is a room he can fit without trimming and packing: straight walls meeting at right angles, a floor that holds its level from doorway to back wall, water, waste and power exactly where his drawing puts them and at the heights he wrote, and the hood outlet centred on the hob. Send his drawing before first fix and it becomes our reference; if nobody is chosen yet, we set a provisional layout with room for him to adjust.

If there are old cabinets in the kitchen

The cabinet maker or the homeowner removes them before we start, especially if you want to keep or sell them. We take over an empty room, or work around whatever stays after it has been wrapped and protected properly.

Dimensions we agree with the cabinet maker before first fix

We borrow a few guideline figures from an international kitchen-planning guide. Saudi regulations do not impose them, but they head off common layout mistakes:

What we setGuideline figureWhat it means for the renovation
Walkway between two runs, or between a run and an islandRoughly 107 cm if one person cooks, 122 cm for twoHow far a run can move forward once the kitchen opens to the living area
Height of whatever hangs over the hob76 cm if it can burn, dropping to 61 cm with an approved hoodLevel of the hood outlet and its socket
Where the dishwasher goesNo further than about 91 cm from the edge of the sinkIts feed and drain come out close to the sink
Counter either side of the sinkRoughly 61 cm one way and 46 cm the otherThe waste outlet on the expected sink centreline

Reference: an international kitchen-planning guide; the carpenter’s drawing and each appliance booklet have the final word.

Kitchen Maintenance in Al Khobar: What We Fix and What the Carpenter Fixes

Kitchen maintenance in Al Khobar, as we offer it, is upkeep of the room and the services running through it: water under the sink, a slow drain, a socket that runs warm, tiles that have lifted, a stain in the ceiling, or a hood that blows its air nowhere in particular. Maintaining the cabinets themselves, a door that has dropped, a drawer that sticks, a broken hinge or a swollen laminate, is carpentry. The table below separates the two so you know whom to call:

What you noticeWho should fix itWhat we do when it is ours
Water under the sink, or a swollen cabinet baseAemar Al-Maryam, then the carpenterWe find the source, replace the failed section (from SAR 165) and test; the carpenter then renews the base
A dripping mixer, or a sink you want changedAemar Al-MaryamFitting or replacing the mixer or sink from SAR 75
Power cuts out whenever the oven runsAemar Al-MaryamWe split the oven onto its own line and breaker (breaker from SAR 90) and swap the burnt socket (from SAR 18)
Hollow or lifted tilesAemar Al-MaryamWe open the area, deal with the water that caused it, then retile
Steam hangs in the room even with the hood onAemar Al-MaryamWe core the duct a way out of the building (from SAR 140) and wire the hood (from SAR 65)
A dropped door, a stuck drawer or peeling laminateKitchen carpenterNot our work
An aluminium kitchen that needs welding or new partsAluminium kitchen technicianNot our work

Prices shown are starting prices and remain estimates until inspection and agreement.

Often the two overlap: a slow leak under the sink has rotted the cupboard floor. We go first, stop the water and let it dry; then the carpenter renews the base. Reverse the order and the new base rots too.

Opening the Kitchen to the Living Room in Al Khobar: When It Is Allowed and When It Is Not

Opening the kitchen to the living room in Al Khobar is allowed when the dividing wall is a non-load-bearing block wall, that is, a wall that divides space but carries no beam or slab. A wall like this usually comes out in a working day, and the price starts from SAR 185 per wall. If the wall is load-bearing, or a beam runs over it, or a slab rests on it, it is not touched until a structural engineer has studied it and the necessary permit has been issued.

The request is common in Al Khobar villas and upper floors, because many were designed with a closed kitchen set well away from the sitting areas. Family life has changed, and people now want the kitchen close to where they eat and sit. Done properly, the result is a larger space with more daylight, but the decision starts with the structure, not the look.

How do we know the wall is not load-bearing?

  • ✓The house drawings: the first thing we ask for if they exist; load-bearing walls and beams show on them.
  • ✓What sits above the wall: we check the ceiling over it; a downstand beam, or a wall on the floor above standing directly on it, means the engineer is needed.
  • ✓Material and thickness: ordinary unreinforced concrete block in a framed concrete villa is usually a partition, but “usually” is not a rule.
  • ✓An exploratory opening: when in doubt, we open a small hole near the ceiling to see what is above the wall before any decision is made.

A load-bearing wall: the engineer comes first

Taking out a wall that carries load, or cutting into a beam or slab, alters the structure itself, which an ordinary renovation licence (for repairs that leave the structure untouched) does not cover. An engineering office must report on it and a permit must be issued through Balady; we then build exactly what the engineer designs, priced on site once his report is in.

After the wall comes down: floor, electrics and ceiling

Demolition is half the job. Left behind are an untiled strip at a different level, cables that fed a switch in the wall, and sometimes a scar in an old gypsum ceiling. We render and true the cut ends, reroute the cables and move the switch to a wall that stays, screed the strip flush before tiling, and repair or re-board the ceiling. If the job needs concrete cutting for an opening or a doorway, that goes through our concrete cutting service in Al Khobar, and larger demolition through our demolition contractor page for Al Khobar.

Choosing tiles once the kitchen is open

When the kitchen and living area become one space, many owners prefer one tile across both so that no line shows where the old wall stood. If that is what you want, decide before the strip-out, because it means part of the living-room floor joins the job.

Renovating an Old Kitchen in Al Khobar: When a Refresh Is Enough and When It Has to Be Stripped

Refreshing an old kitchen in Al Khobar is enough when what lies under the finishes is sound: tiles that are fully bonded and do not ring hollow, pipes that do not weep, electrics that do not run hot, and dry walls. In that case you can repaint, tile over the existing tiles under certain conditions, and change the mixer, sink and lighting. If any of the signs below appear, though, the kitchen needs a renovation that reaches the pipes and the waterproofing, and any refresh laid over the top will have to be broken out later:

  • ✓Tiles that ring hollow: the bedding underneath has let go, most often because water has been getting in for years.
  • ✓Blistered paint or white salts at the skirting: damp rising in the wall, or a leak behind it.
  • ✓A drain smell that will not go: a broken waste pipe, a pipe with no fall, or a badly fitted trap.
  • ✓Weak or rust-tinted water first thing in the morning: a sign of old galvanised pipes corroding from the inside.
  • ✓Hot sockets or repeated trips: kettle, oven and microwave sharing one cable.
  • ✓Steam and grease on the ceiling: the hood is not venting to the outside.

Al Khobar’s coastal humidity and what it does to kitchens

Al Khobar is a coastal city and humid for most of the year, and that changes some of our decisions in a kitchen. Water that leaks under the tiles stays there longer before it dries, so it breaks down the bedding and feeds mould behind the base units. Across the Eastern Province, saline groundwater also sits close to the surface in many locations, which is why salts appear at the skirting of ground-floor kitchens. So we give the sink-zone waterproofing priority, prefer electrical boxes and accessories that stand up better to corrosion where the room is damp, and deal with the source of any water before laying new tiles.

Kitchen Tile Replacement in Al Khobar: What We Find Under Old Tiles

Kitchen tile replacement in Al Khobar begins by lifting the old covering and its bed down to firm ground, priced from SAR 14 a square metre. It is careful work, not blind smashing: a broad chisel, slow near the water points, because whatever turns up underneath shapes everything that follows.

Old Kitchen Tile Removal in Al Khobar
A technician strips the old wall tiles in the kitchen of an older flat in Al Thuqbah, Al Khobar, exposing a rusted galvanised supply pipe due for replacement.

Rusted galvanised pipes in older flats

Older flats and houses often have galvanised steel supply pipes, which rust inside until the bore narrows, pressure falls, the water discolours and the joints weep. Once one is exposed, as in the photo, tiling over it makes no sense. We replace the exposed section with heat-fused plastic pipe rated for hot and cold water, from SAR 165 per failed section, or re-plumb the whole kitchen if the rest of the system is in the same condition.

We find other things under the tiles that change the plan, too: thick bedding that has soaked up water, a sink waste with no fall where grease builds up, or a floor with a step in it left by earlier patch repairs. We photograph what we find and send it to you before going further, and any extra item is written down with its price before it is carried out.

Floor, walls, or both?

Floor faults alone can mean floor work alone, if the walls are sound. Pipes buried in a wall mean opening that wall along their run at least. In a full renovation, doing both usually costs less overall, since set-up, protection and rubble removal are paid once.

Tiling over old kitchen tiles: when does it work?

Only if every old tile is firmly stuck, degreased and scuffed, and the new layer goes on a polymer-modified adhesive. Expect the floor to rise a centimetre or so, which matters for the door, skirting and under-counter appliances. Over hollow tiles or an unfixed leak, never. More detail sits with our Al Khobar tiling team.

Kitchen Plumbing and Electrical Rough-In in Al Khobar

A kitchen plumbing and electrical rough-in in Al Khobar re-routes every feed, drain and power point to the layout agreed with your carpenter, then proves each one before it disappears behind tiles. Plumbing first fix for sink, filter and one washer point is from SAR 135; an extra power point in a working kitchen from SAR 75; a fresh breaker for its own circuit from SAR 90.

Plumbing for the sink, dishwasher and filter

  • ✓Feeds: fusion-welded plastic for hot and cold, a quarter-turn valve under the sink for each, and a single kitchen stop valve so this room can be shut off on its own.
  • ✓The sink drain: usually 40 mm, trapped, and run downhill at around 2% to the stack so fat cannot collect.
  • ✓Dishwasher: supply and waste points beside the sink, because its short hoses do not tolerate distance.
  • ✓Filter or water cooler: a separate supply point with its own valve if you plan to fit an under-sink filter.
  • ✓As few buried joints as possible: we keep joints inside the wall to a minimum and photograph the routes before tiling.

Testing the pipes before they are closed in

Saudi plumbing rules ask for drains to hold a 3-metre column of water for fifteen minutes with no fall in level, and for supply pipes to stay tight at working pressure or above. We tend to hold the pressure longer and invite you to read the gauge before the membrane goes on. For a full-house plumbing installation, see our plumber in Al Khobar page.

Dedicated circuits for the oven and heavy appliances

Ovens, electric hobs, dishwashers, washers and water heaters are heavy loads, so each is wired back to the panel on a breaker matched to its nameplate. Oven and hob cable sizes depend on the model, hence an on-site price. Older kitchens typically run all of them off one line, which is why sockets warm up and the power trips.

Sockets above the worktop and earth-leakage protection

Counter sockets are spread out so extension leads are never needed, set just above the carpenter’s worktop line, and kept clear of the hob and the area straight behind the sink. Saudi wiring rules follow the international standard calling for 30 mA earth-leakage protection on socket circuits, and a kitchen is an obvious place for it. Insulation is meter-tested before anything is switched on.

Kitchen Floor Levelling in Al Khobar
Screeding a villa kitchen floor in Al Aqrabiyah, Al Khobar, with an aluminium straightedge to a laser line, the capped plumbing points ready for testing.

Kitchens still on 110 V

A few older Al Khobar homes still carry points on the former 127/220 V supply, although homes in the Kingdom now run on 230/400 V. Converting a kitchen means checking the panel and coordinating with the power company, so it is quoted on site, and no new appliance is plugged in until the voltage is confirmed. For all other electrical work, see our electrician in Al Khobar page.

Sink-Zone Waterproofing in Al Khobar Before Tiling

Sink-zone waterproofing in Al Khobar means brushing a flexible coat over the floor under the sink and dishwasher, turning it up the wall, taping the corner and sealing round every pipe, then proving it with water before a single tile goes down. From SAR 26 a square metre. Kitchens are not bathrooms and rarely need the whole floor done, but leaks keep returning to this corner, and in a humid coastal city they linger.

Sink-Zone Waterproofing in Al Khobar
A technician brushes a flexible cementitious waterproofing coat across the sink-zone floor of a flat kitchen in Al Khobar Al Janubiyah and up the wall, with sealing tape in the corner and around the drain.
  • ✓On the wall behind the sink: international wet-area provisions call for a water-resistant surface at least 150 mm above a basin that sits close to the wall; we take the membrane higher than that behind the tiles.
  • ✓Around penetrations: every pipe that comes out of the wall or floor is sealed with tape or a purpose-made collar.
  • ✓The whole floor: we waterproof it in ground-floor kitchens with damp or salts, and in a kitchen that sits over an occupied room below.

A flood test before tiling

Once the membrane is dry we dam off the sink zone, fill it and let it stand a full day or longer, then check the wall and, where we can, the ceiling below. We never tile over an untested membrane, because a fault in it only shows after the new tiles have to be broken out again.

Kitchen leaks: we find them before we break anything

A damp patch on the kitchen wall, or on the ceiling of the flat below, with no clear cause? Detection equipment goes in first, and we only break out where it points rather than opening the whole wall. Leak detection is covered on our waterproofing and leak detection page for Al Khobar. Once the source is found we repair it and make good the finish. When a ceiling stain traces back to an upstairs bathroom, the repair happens in that bathroom; see bathroom renovation in Al Khobar.

Kitchen Floor Levelling in Al Khobar

Kitchen floor levelling in Al Khobar is a sand-cement screed or levelling compound we lay after strip-out and first fix, setting the level to a laser line from the door to the far wall. It starts from SAR 14 per square metre. Many older kitchens in Al Khobar have a visible step or drift in level after years of patch repairs, and once the kitchen opens to the living area, the difference between the two floors becomes even more obvious.

Why the level matters to the cabinet maker and the appliances

Base units stand on adjustable legs, but their range is limited. If the floor falls two centimetres along a wall, the cabinet maker has to cut and pack, and a gap opens between the worktop and the wall. Washing machines and dishwashers vibrate on an uneven floor, and large-format porcelain can only go down on a flat substrate: the common reference for tiles with any edge over 38 cm is no more than 3 mm deviation over 3 metres.

Falls towards a floor drain, if there is one

With a floor gully, the surrounding floor gets a slight slope of about 0.5–1% towards it. Without one, the floor is kept flat; a pointless slope only troubles the carpenter.

Kitchen Floor and Wall Tiles in Al Khobar

Tiling waits until the pipes have passed, the membrane is dry and the screed has set. Fixing rates per square metre start at SAR 23 for floor ceramic, 27 for kitchen wall ceramic and 32 for porcelain no larger than 60×60; budget tiles supplied, stuck and fixed start at SAR 37.

  • ✓For the floor: porcelain or good-quality ceramic with a non-slip surface, since the kitchen is a room of water and grease.
  • ✓Adhesive: an improved C2-class adhesive in the kitchen, with full coverage behind each tile rather than dabs, especially near the sink.
  • ✓For the walls: glazed ceramic or porcelain that is easy to clean, at least between the worktop and the wall units, and a non-combustible surface behind the hob.
  • ✓Coordination with the cabinet maker: worktop and wall-unit heights are fixed before the wall is tiled, so we neither tile what will be hidden nor leave a gap that shows.

Full-height wall tiling cleans easily but costs more; most kitchens do well with a splashback strip and washable paint above.

Kitchen Extractor in Al Khobar: Venting Outside, Not Into the Ceiling

A kitchen extractor in Al Khobar needs, above all, an outlet to the outside of the building, through an external wall or a light well, with a cowl that stops air blowing back. We form that outlet with a 5 to 6 inch core hole from SAR 140, and connect the hood’s power from SAR 65. A hood that empties into the void above a gypsum ceiling simply moves the steam and grease into the house, and after a few months it leaves stains and smells in the ceiling.

How big should the hood opening be?

Domestic kitchen hood ducts are mostly 150 mm in diameter, which means a 5 to 6 inch core depending on the duct and the appliance manual. International guidance recommends a hood ducted to the outside with an extract rate of no less than about 170 m³ per hour. A recirculating hood with filters catches some of the grease, but it removes neither heat nor moisture, and in Al Khobar’s humid air the difference soon shows on the ceiling and the wall units.

In flats: where does the hood vent?

In apartment buildings the kitchen may not have an external wall near the hob. In that case we plan the duct route above the wall units or inside the gypsum ceiling to the nearest external wall or light well, with as few bends as possible. We also ask you to check with the building management in case openings in the façade are restricted. Core sizes and openings are covered in detail in our Al Khobar core drilling guide.

Kitchen Ceiling, Plaster and Paint in Al Khobar

Steam calls for green, moisture-resistant plasterboard overhead, from SAR 74 a square metre with spotlight holes, plus a hatch close to the hood duct and any valve above. Walls get sand-cement render (gypsum plasters dislike damp), from SAR 18 a square metre, then a scrubbable paint once the render has cured: budget paint with materials from SAR 14, premium from SAR 32.

See also: gypsum board installation in Al Khobar, plastering contractor in Al Khobar and painting contractor in Al Khobar.

Granite Worktop Setting in Al Khobar

Granite worktops in Al Khobar are set once you have picked the slab, either on carcasses the carpenter has already fixed or on rendered block piers. Because length, sink and hob cut-outs, edge profile and the climb to your floor all vary, setting is quoted on site, and the stone is bought separately.

Granite Worktop Setting in Al Khobar
Two technicians lower a dark granite slab with a cut sink opening onto rendered blockwork bases in a flat kitchen in Al Olaya, Al Khobar, a spirit level resting on the stone.
  • ✓Supports before stone: we check the carcasses or bases with a level first, because granite will not bend to follow a slope.
  • ✓Sink and hob cut-outs: cut to the actual appliance, so have the sink and hob, or their exact dimensions, ready before cutting.
  • ✓Granite or marble? granite shrugs off hot pans and knives, whereas marble dulls where lemon juice or vinegar touch it, sealed or not.
  • ✓The joint with the wall: sealed with a flexible, water-resistant sealant, or covered with an upstand of the same stone.

Gas in the Kitchen: We Leave the Installation to a Licensed Technician

Gas pipework, bottles and tanks are never ours to touch; a licensed fitter handles them under Civil Defence rules. We simply form the hole or sleeve on the route he marks and make good around it. Swapping a gas hob for an electric one needs its own sized circuit, quoted on site.

Kitchen Renovation Steps in Al Khobar, From First Message to Handover

  1. 1
    Photos in
    Your photos, room sizes and appliance list arrive on WhatsApp, with the carpenter’s plan if one exists.
  2. 2
    An estimate
    We send the items with their starting prices, and note what needs confirming on site.
  3. 3
    Inspection
    We measure, check the tiles, walls and ceiling, and establish whether the dividing wall is load-bearing.
  4. 4
    Protection and demolition
    We cover the hallways and living area, then remove the non-load-bearing wall and strip the tiles.
  5. 5
    First fix
    Plumbing and electrics to the cabinet maker’s drawing, replacing whatever we found to be failing.
  6. 6
    Testing
    Pressure on the supplies, water on the drains, and an insulation test on the wiring.
  7. 7
    Waterproofing and levelling
    The sink-zone membrane and its flood test, then the levelling screed.
  8. 8
    Tiles and ceiling
    Floor and wall tiling, then ceiling, plaster and paint.
  9. 9
    The cabinet maker’s turn
    He fits the units; we then set the granite worktop if you ordered it, and the mixers and final sockets go in.
  10. 10
    Handover
    You check the kitchen against the checklist and receive the photos of the pipe and cable routes.

How long does a kitchen renovation take?

Scope decides. Wall removal and strip-out run to a day or two, first fix and testing a few more, the flood test a full day at minimum, and fresh tiles need curing time before foot traffic. Then the carpenter works to his own diary. After inspection you get a written timeline with the date the room is ready for him, so you can book ahead.

Kitchen Renovation Cost in Al Khobar

Kitchen renovation cost in Al Khobar begins at SAR 2,300 for a small room where every core item is done: lifting tiles, plumbing, sealing the sink floor and budget tiling, with no cupboards in the sum. Anyone wanting just one or two items pays for those alone. Al Khobar clients pay no call-out on top; rates match Dammam and Dhahran. The list below is grouped by stage:

StageItem as it appears on our estimateStarting price, SAR
Full packageSmall kitchen: lifting tiles + plumbing + sink-floor membrane + budget tiles, no cupboards2,300 per kitchen
DemolitionTaking out a block partition that carries nothing185 per wall
DemolitionLifting old tiles with their bed14 per m²
DemolitionA wall, beam or slab that carries load and must changeOn site, after the engineer’s report
OpeningsCutting a door or window into a concrete wall140 per opening
OpeningsHood-duct core of 5 to 6 inches140 per opening
PlumbingKitchen first fix: sink, filter point and one washer point135 per kitchen
PlumbingSwapping a rusted or broken pipe length165 per length
PlumbingFitting a new mixer or sink in place of the old75 per mixer
ElectricsExtra panel breaker for an appliance on its own line90 per breaker
ElectricsA power point added to a working kitchen75 per point
ElectricsWiring up the hood or water heater65 per point
ElectricsOven or electric hob line, cable and breaker matched to its loadOn site
ElectricsSocket or switch fitted at second fix18 each
ElectricsSpotlight including the gypsum hole / LED tape beneath wall units9 each / 45 per linear metre
Sealing and screedFlexible membrane over the kitchen floor and around the sink26 per m²
Sealing and screedLevelling screed ahead of tiling14 per m²
TilingFloor ceramic, fixing only23 per m²
TilingKitchen wall ceramic, fixing only27 per m²
TilingPorcelain at 60×60 or smaller, fixing only32 per m²
TilingBudget tiles with adhesive and fixing37 per m²
FinishesCeiling in green moisture-resistant plasterboard74 per m²
FinishesSand-cement render on kitchen walls18 per m²
FinishesInterior paint with materials: budget / premium14 / 32 per m²
FinishesGranite worktop setting (slab chosen by you)On site
Not offeredKitchen cupboards, timber or aluminiumWe do not supply these

Every figure above is an estimated starting price until we have inspected and agreed, and is for labour unless materials are mentioned. Room size, the state of floor and walls, tile choice, how far the points run, which floor the flat is on and access all move the number. Cupboards and appliances sit outside every line. SAR 2,300 is the minimum for a small kitchen with its core items done together; a lone item is priced by itself.

Lines marked “on site” get their price after the visit. Photograph the kitchen, WhatsApp the pictures and sizes to 0547879578, and a first estimate comes back; for other trades, see our price guide.

Worked example: a villa kitchen opened to its dining room

An illustrative example for a villa kitchen with a 3.2 × 4 m floor, separated from the dining room by a non-load-bearing block wall, with two rusted sections of galvanised supply pipe, and a 5 m long, 60 cm high band of wall tiles behind the worktop. The sums use starting prices and labour only; the porcelain is the client’s choice:

ItemCalculationAmount (SAR)
Removing the non-load-bearing dividing wallOne wall185
Floor area3.2 × 412.8 m²
Wall band behind the worktop5 × 0.63 m²
Stripping the old floor tiles and the old band(12.8 + 3) × 14 = 15.8 × 14221.2
Floor levelling12.8 × 14179.2
Sink-zone waterproofing (floor and wall)4 m² × 26104
Floor porcelain up to 60×6012.8 × 32409.6
Ceramic band behind the worktop3 × 2781
Kitchen plumbing rough-inKitchen135
Replacing two rusted pipe sections2 × 165330
New electrical points5 × 75375
New breaker for a dedicated circuitBreaker90
Hood connectionPoint65
Core hole for the hood ductOpening140
Rendering the cut ends of the removed wall2 m² × 1836
Total, labourAbout 2,351

If a moisture-resistant gypsum ceiling is added over the whole kitchen, that is 12.8 × 74 = SAR 947.2, bringing the total to about SAR 3,298.2. The example does not include the porcelain and ceramic themselves, the cabinets, the appliances, the granite and its setting, the gas, or the living-room tiles if you decide to run one floor through both spaces.

What pushes the cost up or down?

  • ✓What is under the tiles: more rusted pipework than expected, or a floor that needs a thick screed.
  • ✓The type of dividing wall: a partition is a small item; a load-bearing wall means an engineer, a permit and structural work.
  • ✓Tile type and size: large porcelain needs more precise levelling, more adhesive and more time.
  • ✓Wall tiling height: a band behind the worktop, or all the way to the ceiling.
  • ✓Where the flat sits: hauling sacks of rubble down several flights eats into labour days.
  • ✓Number of appliances: every heavy appliance means another circuit and breaker.

Flat and Villa Kitchens in Al Khobar: What Changes on Site

A flat kitchen in Al Khobar is usually smaller, shares walls with neighbours, drains into the building stack and is limited by the façade for its hood outlet. So sealing matters doubly, since a leak lands on the flat below; noisy work keeps to sensible hours; and rubble leaves in sacks. In a tight room, where the dishwasher and fridge go decides everything.

Villa kitchens allow bigger moves: knocking through, shifting the sink under a window, adding an island. Moving a sink drags its waste and fall to the nearest chamber; an island needs power and maybe a buried waste. An outdoor or annex kitchen is new building, handled by our annex and majlis builder in Al Khobar.

Mistakes That Keep Repeating in Kitchen Renovations

  • ✓Tiling over an untested pipe: the first leak means breaking out the new tiles.
  • ✓Fitting cabinets before the points are settled: so the new units get drilled to pass a pipe or cable.
  • ✓Removing a wall without checking what sits on it: it may be carrying a beam or a slab.
  • ✓A hood that vents into the ceiling: stains, grease and smells in the gypsum after a few months.
  • ✓One circuit for every appliance: a warm socket and a breaker that keeps tripping.
  • ✓Gypsum plaster on the sink wall: it does not tolerate moisture.
  • ✓Ignoring damp at the skirting: the paint blisters again however often it is renewed.

Handing Over the Kitchen: a Checklist

  • ✓The pressure gauge on the supply lines holds steady, and the drain water test was done in front of you.
  • ✓No drips under the sink or around the dishwasher point after the water has run.
  • ✓Tap the tiles with a screwdriver handle and you hear no hollow sound.
  • ✓A 3 m straightedge on large porcelain shows no gap over 3 mm.
  • ✓Grout joints are full, and the joint between worktop and wall is sealed.
  • ✓Sockets sit at the agreed heights, and the test button on the earth-leakage breaker works.
  • ✓The hood duct leaves the building, and there is an access hatch in the ceiling close to it.
  • ✓The pre-tiling photos showing where pipes and cables run are in your hands.

Pairing the Kitchen With a Bathroom or a Full Home Renovation in Al Khobar

If the bathroom next to or above the kitchen also needs renovating, doing both together saves a second mobilisation and lets the plumbing be run on one route and tested once. Bathroom details are on our bathroom renovation in Al Khobar page, and if the whole house needs work, see renovation contractor in Al Khobar. For the fullest reference on how we renovate kitchens, see kitchen renovation in Dammam, and the service page bathroom and kitchen renovation.

Why Al Khobar Homeowners Choose Aemar Al-Maryam for Kitchens

■ Clear limits

Cabinets are ruled out in writing from day one, so nothing about the agreement surprises you later.

■ Tested before closed

Pressure, water, flood and insulation tests, and no tiles over anything untested.

■ Priced by item

Every item has a published starting price, and any extra is written down before it is done.

■ Careful structural calls

A wall we have doubts about does not come down before an engineer has seen it.

■ In step with your carpenter

His plan sets our points, and you know in advance the day the room is his.

■ Close to Al Khobar

We are based in Dammam, and Al Khobar and Dhahran are part of our everyday area.

Photos of finished work are on our projects page.

Al Khobar Districts Where We Renovate Kitchens

From older flats in Al Thuqbah and Al Khobar Al Janubiyah to villas in Al Aqrabiyah and Al Hada, apartment blocks in Al Olaya and Madinat Al Ummal and homes along the Green Belt, we reach every district for kitchen work, whether villa, upper floor or flat. Dhahran and Dammam are served at the same rates, and the wider Eastern Province once a visit is agreed. Our Al Khobar services page gathers everything we do in the city, alongside our services in Dhahran and our services in Dammam.

How to Order a Kitchen Renovation in Al Khobar

The more complete the information we get before the visit, the faster your estimate arrives. Send the following on WhatsApp to 0547879578:

  • ✓Kitchen photos: the floor, the walls, under the sink and any stain in the ceiling.
  • ✓Photos of the dividing wall: from both sides and of the ceiling above it, if you want the kitchen opened.
  • ✓Measurements: length, width and height, or a rough hand sketch.
  • ✓Type of home and floor: villa or flat, and whether there is a lift.
  • ✓Appliances: which of oven, hob, dishwasher, washer, heater and filter you plan to have.
  • ✓The cabinet maker’s drawing: if you have chosen one, or tell us you have not yet.
  • ✓District and a convenient time: so we can arrange the inspection.

A leak-free kitchen, ready for the carpenter

One photo of the floor, one under the sink and one of the dividing wall are enough to start; we reply with the items and their likely cost before we visit.

Tags

#kitchen_renovation_in_Al_Khobar#kitchen_renovation_Khobar#kitchen_renovation_company_Al_Khobar#kitchen_renovation_contractor_Khobar#kitchen_maintenance_Al_Khobar#old_kitchen_renovation_Khobar#kitchen_refurbishment_Al_Khobar#kitchen_tile_replacement_Al_Khobar#kitchen_strip-out#kitchen_plumbing_and_electrical_rough-in#kitchen_plumbing_Khobar#kitchen_electrics_Khobar#galvanised_pipe_replacement#rusted_kitchen_pipes#sink-zone_waterproofing#kitchen_floor_waterproofing#kitchen_floor_levelling#kitchen_floor_tiles#kitchen_wall_tiles#kitchen_extractor_Al_Khobar#kitchen_hood_core_hole#open-plan_kitchen_Khobar#kitchen_wall_removal#non-load-bearing_wall_removal#granite_worktop_setting_Khobar#moisture-resistant_gypsum_ceiling#kitchen_renovation_cost_Al_Khobar#kitchen_renovation_prices_Khobar#flat_kitchen_renovation_Khobar#villa_kitchen_renovation_Khobar#kitchen_renovation_Al_Aqrabiyah#kitchen_renovation_Al_Thuqbah#kitchen_renovation_Al_Hada

Request an inspection: Bathrooms and kitchens

Fill in the details and WhatsApp opens with your request so we can arrange the inspection.

Prices are estimates until inspection and agreement; the final price is set after the site visit.

Your request is saved first, then WhatsApp opens with a ready message. Nothing is sent until you press send in WhatsApp.

FAQ

What does it cost to renovate a kitchen in Al Khobar?

For a small Al Khobar kitchen with every core item done (lifting tiles, plumbing, a sealed sink floor and budget tiles) the figure starts at SAR 2,300, cupboards excluded. Single items are charged on their own, such as plumbing first fix from SAR 135 or one damaged pipe length from SAR 165. Treat every number as an estimate until we have visited and agreed.

Do you install or repair kitchen cabinets?

No. Cupboards, timber or aluminium, are not something we sell, build, fit or mend; a kitchen carpenter does that. Our job is the room around them: walls, floor, plumbing and power points and the hood outlet, set out to his plan.

Can my kitchen be opened to the living room?

It can, once the wall between them is confirmed as a block partition that nothing rests on; removal starts at SAR 185. If it turns out to support a beam or slab, a structural engineer decides, and work begins only after his report and a Balady permit.

How do you know whether a kitchen wall is load-bearing?

We check the house drawings if they exist and look at the ceiling over the wall for a beam or a wall on the floor above. When in doubt we make a small exploratory opening near the ceiling, and if doubt remains, an engineer decides before anything is removed.

Who fixes what in a kitchen: you or a carpenter?

Our side covers the room and what runs through it: leaks, slow drains, wiring faults, loose tiles, ceiling stains and a hood with no way out. Sticking drawers, dropped doors, worn hinges, peeling laminate and aluminium units go to a carpenter or aluminium fitter.

What do you do if you find rusted pipes under the tiles?

We photograph them and send you the pictures, then replace the failed section with heat-fused pipe from SAR 165 per section, or re-plumb the whole kitchen if the system is in the same state. We never cover a rusted pipe with new tiles.

Can an old kitchen be refreshed without stripping it?

Yes, if the tiles are fully bonded, the pipes are sound and the walls are dry; then paint, tiling over the old tiles under the right conditions and new fittings can be enough. Hollow tiles, leaks or corroded pipes need breaking out where they are.

Does a kitchen floor need waterproofing?

The floor under the sink and dishwasher is sealed in every kitchen, with the coat turned up the wall, from SAR 26 a square metre. The whole floor is done when the kitchen is a damp ground-floor room or sits over someone's bedroom, and the membrane is flooded for a full day before tiling.

Why does a kitchen floor need levelling?

Cabinets, appliances and large porcelain all need one consistent level; any slope forces the cabinet maker to cut and pack and leaves a gap behind the worktop. Levelling starts from SAR 14 per square metre.

How high should kitchen sockets be?

Above the worktop height the cabinet maker sets, spread along the counter and kept away from the hob and directly behind the sink. Washer and dishwasher points sit lower, under the worktop, with final heights taken from the cabinet drawing.

Does an oven need its own circuit?

It does, and so do an electric hob, a dishwasher, a washer and a water heater: each has a cable and breaker sized to its nameplate. An extra breaker is from SAR 90; the oven or hob line is quoted on site once we know the model.

What size should the hood opening be?

Most domestic hood ducts are about 15 cm across, so we core 5 to 6 inches depending on the booklet, from SAR 140. What matters most is that the duct ends outside the building, never above a suspended ceiling.

Do you set granite worktops?

Yes, we set the granite the client chooses on the cabinet carcasses or on rendered blockwork bases. Setting is priced at inspection because it depends on length, cut-outs and edge finish, and it does not include the stone.

Do you install gas in the kitchen?

Never. Gas pipes, bottles and tanks belong to a licensed fitter working under Civil Defence rules. All we do is form the hole and route he asks for and make good the wall around it.

How long does a kitchen renovation in Al Khobar take?

It depends on scope: demolition and strip-out take about two days, first fix and testing a few days, the flood test at least 24 hours, then tiles and ceiling. We give you a schedule after inspection, including when the room is ready for the cabinet maker.

Is there a travel charge inside Al Khobar?

No. We work in Al Khobar daily, as in Dammam and Dhahran, at identical rates. Send photos and measurements of your kitchen on WhatsApp to 0547879578 for an estimate.