Swimming Pool Construction in Jubail

Swimming pool construction in Jubail often means something other than a plain rectangle. Many villa owners there want a pool that follows the garden: curved edges, sparkling blue glass mosaic, and a shallow end that slopes in gently like a beach so children and adults can walk into the water without steps. Aemar Al-Maryam General Contracting builds these pools in reinforced concrete on both sides of the city, renovate older seaside pools whose coping has been eaten by salt, and lay and pressure-test the buried pipework before any trench is backfilled. In Jubail our price ladder opens at SAR 12,900 for the smallest shell (roughly 2.5 by 4.5 metres), then SAR 19,400 for the three-by-six family size, then SAR 29,500 for the four-by-nine class that fits most Industrial City gardens. We confirm every figure after seeing the garden, and the crew’s trip up from Dammam is added at that point. Phone or message us on 0547879578.

Jubail is really two places sharing a name. The Industrial City side is laid out in planned neighbourhoods with generous gardens; the Royal Commission regulates building there, and Marafiq supplies water and power. Al-Balad, the original town, has older houses, tighter courtyards and permits that run through the municipality and the Balady platform. What both halves share is the sea: salt in the air, groundwater close to the surface in many plots, and a strong sun that bleaches stone and cracks weak grout. This guide is built around those facts: how we build a freeform pool that copes with them, how we test what gets buried, when new coping is enough and when a deeper renovation is needed, and what each part costs in actual figures.

Swimming pools in Jubail at a glance

  • What we build: reinforced-concrete pools, freeform or straight-sided, with a graded beach entry or steps, finished in glass mosaic or pool ceramic tiles.
  • Before backfilling: pool pipes bedded on clean sand, pressure-tested and photographed. No trench is closed until its test has passed.
  • Renovation: replacing salt-worn coping stones, re-waterproofing and re-tiling, and treating shell cracks after they have been assessed.
  • Opening prices in Jubail: SAR 12,900 for the smallest shell, 19,400 for a mid-size garden pool, 29,500 for the four-by-nine class and 60,000 when you want an overflow edge with its tank.
  • Permits: the Royal Commission inside Jubail Industrial City; an engineering office on Balady in Jubail Al-Balad.
  • For an estimate: WhatsApp 0547879578 with garden photos, rough sizes and which side of Jubail you live on.

Swimming pool construction in Jubail: Industrial City or Al-Balad?

The first thing we need to know about your pool in Jubail is where the house is, because the permitting body, the utility provider and the kind of plot all change between the two halves of the city. That difference shapes the plan from the first visit:

■ Jubail Industrial City

Larger gardens in districts such as Al-Fanateer, and more requests for freeform pools with beach entries. Permits come from the Royal Commission and connections from Marafiq; a residential compound may also set rules on working hours and equipment access.

■ Jubail Al-Balad

Older homes around Al-Dabab, Ghirnatah and Al-Hamra, tighter yards, and more tired pools to renovate than new ones to build. Permits go through an engineering office on Balady, and the main thing we check is where existing pipes and services run.

■ Houses close to the sea

In both halves: salt in the air and soil, and groundwater that may sit near the surface. Here we tank the walls on the outside, choose a salt-resistant coping stone, and never drain a pool without checking first.

Pool construction company in Jubail: what our crews build and what specialists supply

A pool construction company in Jubail should separate the structural part of a pool from the equipment part in front of you. Everything poured, buried or tiled is our crews’ work: digging and carting away spoil, pumping out groundwater if it shows, the reinforced shell, waterproofing, mosaic, the pipes cast into the walls or laid in trenches, the room that will house the machinery, and the cable and earthing that feed it. The machinery itself, meaning circulation pumps, filters, salt cells, heaters, chillers, low-voltage pool lights and app-based controllers, is sized and sold by a firm that specialises in pool equipment; we connect and commission it with their technician once you have picked a level, and it is priced then.

Why does that split matter? Because a pump can be swapped in an hour, while a leaking joint under the pool deck or a crack in the floor can only be reached by breaking things open. So we put our effort into what gets buried and cast, and leave to the supplier what can be unbolted and replaced. We do not offer routine cleaning, chemical dosing or monthly maintenance contracts; our work is building and renovating.

Freeform pools with a beach entry in Jubail

A freeform pool in Jubail is an ordinary concrete pool in its structure, but its walls follow curves instead of right angles, so it reads as a small lagoon inside the garden. The hard part is not the shape itself. It is three things: forming curved walls, spacing return inlets and skimmers around an irregular perimeter, and a finish that has to wrap the curve with no voids behind it.

Formwork and reinforcement for a curved pool

We set out the curve on the ground from the drawing with closely spaced pegs and excavate to it. The wall formwork is made from flexible panels or short consecutive sections that hold the bend, and the wall bars are bent to the same line rather than cut and lapped every metre. The designer at the engineering office sets the wall and floor thickness and the bar sizes; we build to the drawing and keep at least 75 mm of concrete cover on faces cast against soil.

Glass mosaic for curves in Jubail

Large tiles cannot bend. Fixed to a curved wall, their edges stand proud and leave hollows behind. For freeform pools we therefore use glass mosaic in small pieces that follow the curve, fixed with an adhesive rated for immersion in a full bed that leaves no voids behind the pieces, and grouted with a grout suited to treated pool water. Tile or mosaic absorption should be low, ideally under 0.5 per cent.

A graded beach entry: what it needs

A beach entry is a gentle slope where the water starts very shallow and deepens gradually, so children can walk in and adults can sit in the shallows. To keep it safe we plan for:

  • ✓A calm, even gradient: one steady slope with no sudden breaks, set with the designer according to the pool’s length.
  • ✓A slip-resistant surface: mosaic or tiles made for wet areas across the whole shallow zone.
  • ✓A clear depth change: a colour change or line in the mosaic where deeper water begins, plus depth markings on the edge.
  • ✓Drainage on the surrounding deck: so garden water and soil do not wash onto the beach with irrigation.

Before you finalise the design

A long beach takes length away from the swimmable part of the pool. If your garden only fits about 9 m, consider a short beach or broad corner steps instead of a long slope.

Types of swimming pools in Jubail

Four pool types come up in Jubail, and each suits a different situation:

Reinforced-concrete pools in Jubail

This is what we build. A cast shell can follow a curve or a straight line equally well, and an engineered one holds the water in while keeping the surrounding earth and groundwater out. Near the sea the designer specifies a sulfate-resisting cement, and we waterproof both faces of the shell.

Block-built pools in Jubail: are they a good idea?

A wall of hollow blocks is far weaker than steel-reinforced concrete against the push of water inside and earth outside, and its mortar joints are where cracks and leaks begin. It may look cheaper on day one, but we never use block for a pool shell; it is fine for the plant room or a garden planter.

Fibreglass pools in Jubail

A factory-made shell lowered into the excavation: quick to install, but limited in shapes and sizes. We do not make them, but if you choose one we can handle the excavation, the concrete base, the backfill and the tiling around it.

Indoor pools in Jubail

A pool inside a closed building needs ventilation and humidity control before anything else, or vapour condenses on the walls and ceilings. It is designed with a mechanical engineer and priced at inspection.

Skimmer or overflow pool in Jubail?

Skimmer and overflow describe how the top layer of water is pulled off for filtering. With skimmers, the water line sits a few centimetres under the coping and wall-mounted mouths draw in floating debris. With overflow, water brims over the edge into a gutter that runs round the pool, drains to a concrete balance tank, and is pumped from there through the filter. On a freeform pool skimmers are normally the easier route, because a gutter that has to follow long curves is hard to build dead level.

PointSkimmerOverflow
Water levelA few centimetres under the stoneBrimming level with the rim
CostLower; a 3×6 m skimmer pool opens at SAR 19,400Higher; overflow opens at SAR 60,000
Curved freeform poolVery suitablePossible, but the channel is harder
Dust and leavesCollected in skimmer basketsCarried with the overflow to the tank
Extra spaceNo tank neededNeeds a buried balance tank

Codes that cover skimmer-only pools ask for at least one skimmer per 800 sq ft of water, about 74 m². On a freeform pool we add one on the downwind side, where leaves and dust collect, even when the area is smaller than that.

Building a concrete pool in Jubail, step by step

Building a concrete pool in Jubail follows an order that cannot be skipped, because each stage is covered by the next:

  1. 1
    Survey and design
    We measure the garden, keep the pool away from the wall footing and both tanks, and go through the drawing with the engineering office.
  2. 2
    Permit
    Royal Commission approval on the industrial side; an engineering office filing on Balady in the old town.
  3. 3
    Excavation and dewatering
    Machine excavation and removal of spoil, with groundwater pumped out if it appears above the formation level.
  4. 4
    Blinding and steel
    A level blinding layer, then floor and wall reinforcement on chairs that hold the concrete cover.
  5. 5
    Pipe sleeves before the pour
    Sleeves for main drains, return inlets, skimmers and lights fixed in place before casting, never broken into the concrete afterwards.
  6. 6
    Pouring and curing
    Floor slab first and walls second, a waterstop in every cold joint, then a week or more of keeping the concrete wet.
  7. 7
    Water-tightness test
    Filling the bare shell and measuring the loss before any waterproofing or tiles.
  8. 8
    Pipework and testing
    Running pipes to the plant room and pressure-testing them before backfill.
  9. 9
    Waterproofing and tiling
    Internal waterproofing, then mosaic, coping and deck.
  10. 10
    Commissioning
    Installing equipment with the supplier, filling gradually, and handover.

How long does pool construction take in Jubail?

Expect one to two months for a typical family pool in Jubail, a little more for freeform work because of the curved formwork and the mosaic. Roughly half of that is deliberate waiting: a week of wet curing, the days the shell spends full of water while we measure it, and close to three weeks for the mosaic to harden before the pool is flooded.

Pressure-testing buried pool pipes in Jubail Al-Balad

Pressure-testing pool pipework matters most in the older houses of Jubail Al-Balad, because the run between the pool and the plant room usually passes under a path or a tiled courtyard. Any leak found after backfilling means lifting tiles and hunting for a point nobody can see. So no trench is closed before its test has passed.

Pool Pipework in Jubail
An open trench between a new pool and the plant room at a house in Jubail Al-Balad: pressure pipes on a bed of clean sand, ends capped, and a technician reading the gauge before backfilling.

Our test runs in clear steps that you are welcome to watch:

  • ✓Clean sand bedding: pipes rest on sand free of stones and building debris that would scuff them over time.
  • ✓Capped ends: every open end is sealed and a pressure gauge is fixed to the pipe manifold.
  • ✓Pressurising in stages: pressure is raised gradually following the pipe manufacturer’s instructions, typically to about 1.5 times the working pressure, with air bled out at the high points.
  • ✓Settle, then watch: the line is left to stabilise, then the gauge is watched for a set period; any drop means checking the joints before backfilling.
  • ✓A photo of every run: we photograph the routes and their measurements before backfilling, so you know where the pipes are if anyone needs to dig later.

In Al-Balad especially

Before digging a trench we ask about the old drainage, power and water routes in the yard, because older houses often carry undocumented services. One strike of an excavator bucket on an old drain costs more than a day spent checking.

Pool pipework and the plant room in Jubail

Pool pipework covers the main drains in the floor, the return inlets in the walls, the skimmer bodies, the balance tank on overflow pools, and the lines to the plant room. We keep the plant room as close to the pool as practical to shorten the runs, with ventilation, a floor drain and a lockable door, since it holds chemicals and electrics. General household pipework is covered in Plumber in Jubail.

Pool waterproofing in Jubail and the water-tightness test

Pool waterproofing in Jubail starts only after the bare shell has proved itself. We flood it, give the concrete three days to soak up what it will, and then log the level for a further three days. The concrete institute’s test for water-holding structures accepts a loss of one-twentieth of one per cent of the volume per day at most, once evaporation, read from a pan of water on the deck, has been subtracted.

Waterproofing the pool from inside in Jubail

After cleaning and damping the concrete we brush on a flexible cement-based coating made to stay under water, in two crossing coats, and bed a reinforcing band into every floor-to-wall angle and around each pipe sleeve. Where the shell calls for it we switch to a PVC liner or an epoxy finish. Remember that tiles and grout are not the barrier; the sound shell and the coating behind them are.

Waterproofing the outside of the walls near the sea

Close to the coast, where groundwater is near and salty, we tank the outside of the walls with a bituminous coating before backfilling, so salts do not reach the concrete and steel. For the villa’s roof and water tanks, see Roof Waterproofing and Insulation in Jubail.

Pool tiling in Jubail: mosaic, coping and deck

Pool tiling in Jubail is not floor tiling, because these tiles live under water all the time. The rules we keep to:

  • ✓Wait before tiling: technical guidance recommends letting the concrete mature for about six weeks, and render for about three weeks, before tiles go on.
  • ✓Grout after three days: we do not grout until the adhesive has set for at least three days.
  • ✓Movement joints: where the floor meets the walls and wherever the designer specifies.
  • ✓Coping stone: a slip-resistant, salt-resistant coping laid with a slight fall away from the pool.
  • ✓The pool surround: outdoor tiles falling to drains, or interlock paving as described in Interlock Paving in Jubail.

When do we fill the pool after tiling in Jubail?

About three weeks after the last grout, filling at no more than roughly 75 cm a day. Filling fast loads fresh tiles and adhesive and makes debonding more likely. In Jubail Industrial City the water comes from the Marafiq network, so we agree the filling time with the owner.

Pool renovation in Jubail: replacing salt-worn coping

Pool renovation in Jubail, in houses close to the sea, usually starts at the edge. Coping stone takes sun, salty spray and treated pool water all at once, so its surface wears, its mortar crumbles, and hollows open beneath it that let water into the top of the wall. The right fix is not to paint the old stone but to lift it and check what lies underneath.

Pool Renovation in Jubail
Renovating the edge of an old pool near the sea in Jubail: salt-worn coping lifted out and new pale anti-slip stones bedded on mortar, with the water lowered below the work.
  1. 1
    Lower the water partly
    We bring the level below the working height only, and never drain the pool fully before checking the groundwater around it.
  2. 2
    Lift the old stone
    Stones and mortar come off carefully so the top row of mosaic is not broken.
  3. 3
    Inspect the wall head
    We look for crumbling concrete, exposed steel or cracks, and treat them before any new stone.
  4. 4
    Renew waterproofing at the edge
    Waterproofing is redone along the top of the wall, where water had been getting in.
  5. 5
    New stone on a mortar bed
    A pale, slip-resistant, salt-resistant coping set in a straight line with a slight outward fall, with a movement joint between coping and deck.

Signs your pool in Jubail needs renovating

  • ✓Coping that rocks underfoot, or mortar crumbling between stones.
  • ✓Loose mosaic pieces or eroded grout along the waterline.
  • ✓Cracks in the floor or walls that show once the water is lowered.
  • ✓Water dropping faster than normal evaporation.
  • ✓Damp patches or salt deposits on the plant room walls or in the ground around the pool.

Renovate or rebuild a pool in Jubail?

When the shell is structurally sound and holds water once hairline cracks are sealed, new waterproofing, tiles and coping are the economical route. Cracks that go right through, or settlement, call for an engineer’s report, and demolition and a new pool may be the better answer. General crack repair is covered in Crack Repair in Jubail, and whole-house work in Renovation Contractor in Jubail.

Is your pool leaking? The bucket test

A simple check you can do yourself: stand a bucket on the first step, fill it to the pool’s water line, mark both with a pen, and let a full day pass with the pump on its usual timer. Sun and wind lower both by the same amount; if the pool falls noticeably further, water is escaping somewhere, and we find where before breaking anything. A visit to examine an existing pool in Jubail starts at SAR 140.

Pool lighting and electrical safety in Jubail

Underwater lights in Jubail pools are fed from a transformer placed away from the wet zones that steps the supply down to 12 volts. Ladders, rails and any metal near the water share one bonding conductor, and the whole circuit sits behind a 30 mA residual-current breaker. No ordinary socket goes within the two-metre zone around the edge. Outdoor garden circuits and lighting are covered in Electrician in Jubail; in the Industrial City any change at the meter goes through Marafiq itself.

Home pool safety in Jubail

A pool in a garden that opens onto the house needs a barrier between small children and the water, even with a shallow beach. International home-pool safety guidance sets out:

  • ✓A fence of 1.2 m or more: with no gap wide enough for a 10 cm ball to pass.
  • ✓A gate that shuts and latches by itself: swinging out from the pool side, with the catch high enough to be out of small hands’ reach.
  • ✓Two suction outlets in the floor, not one: spaced roughly a metre apart on each pump and fitted with certified anti-entrapment grilles, so hair or a hand cannot be held.
  • ✓Depth markings: on the edge, plus a colour line where deeper water begins in a beach-entry pool.
  • ✓Supervision: covers, barriers and alarms are aids; none replaces an adult watching.

Pool permits in Jubail: Royal Commission or Balady?

Because a pool is a new structural element on the plot, get the authority’s position before any digging starts. On the Industrial City side that authority is the Royal Commission, which sets its own rules for drawings and site work. In Al-Balad, a licensed engineering office files the request on Balady as an addition to an existing building if one is needed; the house must already hold a valid permit, the platform quotes a turnaround of up to ten days, and its calculator shows the fee. For a villa still on the drawing board, put the pool in the original plans.

Pool construction prices in Jubail

We charge the same opening prices in Jubail as in Dammam; the only addition is the crew’s trip north, which we cost after the visit. The pool figure covers everything poured, buried or tiled: digging and carting spoil, the steel and concrete, the inner waterproofing, a pool-grade ceramic lining, the cast-in pipes and their test, and a ready plant room. Machinery is added once you choose it.

What you want in JubailWhere we usually see itOpening price
Smallest concrete shell, roughly 2.5 by 4.5 metres, a metre deepA tight Al-Balad yardSAR 12,900
Three-by-six family pool, sloping to 1.4 mA villa on either side of the citySAR 19,400
Four-by-nine class, down to 1.8 mThe wide gardens of Al-FanateerSAR 29,500
Five-and-a-half by ten-and-a-half class, down to 2 mA house with a big gardenSAR 38,800
Overflow gutter feeding a concrete balance tankOwners who want water level with the edgeSAR 60,000
Glass mosaic for curved walls (supply only)Freeform poolsSAR 110 per square metre
Labour to tile the inside of the poolNew pools and refitsSAR 92 per square metre
Flexible immersion-grade coating when re-waterproofingOlder Al-Balad poolsSAR 74 per square metre
PVC liner or epoxy finish insteadDepending on the shellSAR 92 or 138 per square metre
Chipping off old tiles and their bedBefore a refitSAR 14 per square metre
Laying the surround with falls (labour)Walkway and seatingSAR 37 per square metre
Fitted stainless ladderThe deep endSAR 460
Visit to examine an existing poolBefore any renovationSAR 140
New coping, a beach entry, pool machinery, groundwater pumping, the trip to Jubail—At inspection

These are opening figures, not final quotes; curves, depth, ground conditions and the water table push them up or down, and we put the confirmed number in writing after walking the garden. For anything marked “at inspection”, a photo and a rough measurement on 0547879578 are enough for us to give you a ballpark. See the price list for our other trades.

Worked example: a freeform glass-mosaic pool in a Jubail Industrial City garden

An illustration for a freeform pool roughly in the 4×9 m class, 0.9 to 1.8 m deep, finished in glass mosaic instead of ceramic tiles:

ItemCalculationEstimate
Pool shell and package (4×9 m class)Starting priceSAR 29,500
Upgrade to glass mosaic66 m² internal surface × 110SAR 7,260
Deck tiling, varying width32 m² × 37SAR 1,184
Stainless ladder at the deep end1 × 460SAR 460
Estimated totalBefore equipment and travelSAR 38,404

We have counted the mosaic at its full supply price to be safe; the real figure comes down once the ceramic included in the pool price is deducted. The example leaves out shaping the beach entry, the equipment and travel, which are all set at inspection.

What pushes a Jubail pool budget up or down?

  • ✓Shape: curves and a graded beach need more formwork, mosaic and time than a rectangle.
  • ✓Groundwater: the nearer the water table, the more pumping and external tanking.
  • ✓Access: a garden the excavator can reach costs less than a tight yard dug partly by hand.
  • ✓System: overflow with a balance tank costs more than skimmer.
  • ✓Equipment: variable-speed pumps, salt chlorination and chillers raise the first cost and may lower running costs.

Waterfalls and fountains in Jubail

The waterfalls and fountains we build in Jubail gardens are small structures in their own right: a waterproofed concrete or block basin, a small pump lifting the water round a closed loop, stone or tile cladding, and low-voltage lighting under the water. With a wall waterfall, the first job is sealing the block wall that will stand behind it, because years of running water will otherwise find their way in.

What suits a Jubail gardenOpening price
Waterfall on the boundary wall, about a metre squareSAR 3,700
Wider wall waterfall, about two metres by one and a halfSAR 6,450
Contemporary waterfall filling a garden cornerSAR 5,500
Natural rocks stacked on the groundSAR 7,400
Pond with waterfall and lights for a big gardenSAR 13,900
Fountain at the centre of the seating areaSAR 3,200
Low-voltage lights under the falling waterSAR 460

Jubail’s salty humidity leaves a white crust on the water outlets, so wipe them every few weeks, and top up the basin whenever it drops so the pump always stays submerged.

Built planters around the pool in Jubail

Built planters around a pool make the garden but put irrigation water right next to tiles and walls. We build them on a base, render the walls as in Plastering Contractor in Jubail, waterproof the inside, and add a drainage layer, outlets for water and a root barrier before cladding the outside. A planter wall is never the house wall. They are priced at inspection by length, height and cladding.

Pool care in Jubail’s climate

  • ✓Evaporation: the long summer drives evaporation up; a cover cuts it and keeps dust out.
  • ✓Chemistry: US public-health guidance for home pools keeps pH within the seven-to-seven-point-eight band and free chlorine no lower than one part per million, two if your chlorine is stabilised.
  • ✓Salt does not replace testing: a salt chlorinator makes chlorine, but pH, filtration and cleaning still need regular attention.
  • ✓Coping: a fresh-water rinse of the edge stones every few weeks stops the salt crust forming.
  • ✓Draining: never empty a pool near the sea without checking the groundwater; an empty shell can lift with water pressure from below.

How to order a pool in Jubail

Put these five things in one WhatsApp to 0547879578 and we reply with a ballpark before fixing a visit:

  1. 1
    Location
    Industrial City or Al-Balad, and the district.
  2. 2
    Garden or yard photos
    From several angles, with the proposed pool position.
  3. 3
    Measurements
    The space you have, plus how far it is from the boundary wall and the water tank.
  4. 4
    Shape and system
    Straight or freeform, beach entry or steps, skimmer or overflow.
  5. 5
    For an existing pool
    Photos of the coping, mosaic and plant room, and roughly how many centimetres the level drops in a day.

Reasons Jubail owners hand their pool to Aemar Al-Maryam

Because we spell out what we build and what specialists supply, publish starting prices for almost every item, water-test the shell before waterproofing and pressure-test the pipes before backfilling, and deal with coastal salt in the choice of cement, waterproofing and coping from day one. Our own people pour, seal, tile, pipe and wire, so one site lead answers for the job from setting out to handover. Finished jobs are shown on our projects, and a short summary of what we offer is on Pools and Waterfalls.

Which parts of Jubail we serve

Our crews reach Al-Fanateer and the neighbouring Industrial City districts, and the Al-Balad streets of Al-Dabab, Ghirnatah and Al-Hamra, driving up from Dammam on a day fixed in advance. City page: our services in Jubail. Sister guides: Swimming Pool Construction in Ras Tanura and Swimming Pool Construction in Abqaiq; the full guide is Swimming Pool Construction in Dammam.

Your Jubail garden pool starts with a photo

Send garden photos, rough measurements and the house location, and we suggest a shape, a system and an estimated cost before agreeing a visit date.

Tags

#swimming_pool_construction_in_Jubail#swimming_pool_construction_Jubail#pool_construction_company_Jubail#pool_contractor_Jubail#pool_builder_Jubail#Jubail_Industrial_City_pools#Jubail_Al-Balad_pools#concrete_pool_Jubail#freeform_pool#beach_entry_pool#glass_pool_mosaic#pool_pipework_Jubail#pool_pipe_pressure_test#pool_waterproofing_Jubail#pool_tiling_Jubail#pool_renovation_Jubail#pool_coping_replacement#salt-worn_coping#pool_cost_Jubail#4x9_pool_cost#skimmer_pool#overflow_pool#pool_safety_barrier#waterfalls_and_fountains_Jubail#built_planters_Jubail#Royal_Commission_Jubail#Al-Fanateer_pools#villa_pools_Jubail

Request an inspection: Pools and fountains

Fill in the details and WhatsApp opens with your request so we can arrange the inspection.

Prices are estimates until inspection and agreement; the final price is set after the site visit.

Your request is saved first, then WhatsApp opens with a ready message. Nothing is sent until you press send in WhatsApp.

FAQ

What does a swimming pool cost in Jubail?

Our ladder opens at SAR 12,900 for the tiniest shell we build, SAR 19,400 for a 3×6 m family pool, SAR 29,500 for the four-by-nine size common in Industrial City gardens, SAR 38,800 for the large class and SAR 60,000 for an overflow edge with its tank. Machinery and the trip north are added after the visit.

Do you build curved freeform pools in Jubail?

Yes. We build them in reinforced concrete to the engineering office's drawing, with formwork that holds the curve and bars bent to shape, and finish them in small-piece glass mosaic that wraps the walls. A freeform shape costs a little more than a rectangle because of the formwork and mosaic.

What is a beach entry and is it safe for children?

A beach entry is a gentle slope that starts very shallow and deepens gradually. We give it a slip-resistant surface and a colour line where deeper water begins, but it does not replace a barrier with a self-closing gate or an adult watching.

Which authority approves a pool on the Industrial City side of Jubail?

On the Industrial City side the Royal Commission regulates building and issues approvals. In Al-Balad a licensed engineering office files on Balady if a permit is needed. We do not bring in the excavator until it is clear which route applies to your house.

How do you test buried pool pipes?

We bed them on clean sand, cap the ends and raise the pressure in stages following the manufacturer's instructions, typically to about 1.5 times the working pressure, then watch the gauge before backfilling. We photograph the routes so you know where the pipes run later.

My pool coping has been worn by salt. Is painting it enough?

No. We lift the old stone and mortar, inspect and treat the wall head beneath, renew the waterproofing along the top of the wall, then bed a slip-resistant, salt-resistant coping on mortar. New coping is priced at inspection.

Can a pool in Jubail be fully drained for renovation?

We do not advise it before checking the groundwater around the pool, especially near the sea; an empty shell can lift if the water outside is higher than its floor. Usually we lower the water only below the working level.

Skimmer or overflow for a freeform pool?

A skimmer system is usually simpler and more economical on a curved pool, because an overflow channel along long curves is hard to level. Overflow gives water flush with the edge but needs a balance tank and starts from SAR 60,000.

What is a realistic build time for a Jubail pool?

One to two months for an average family pool, a little longer for a freeform shape. About half of that is intentional waiting: wet curing, the days the shell stands full while we log its level, and the mosaic hardening before it goes under water.

Do you offer pool cleaning and monthly maintenance in Jubail?

No, our work is construction, renovation, waterproofing, tiling and pipework. We build the pool so any maintenance company can look after it easily, and we explain the basics of water balance at handover.

What does a wall waterfall cost in Jubail?

A small waterfall on the boundary wall opens at SAR 3,700 and a wider one at SAR 6,450; stacked natural rock on the ground opens at SAR 7,400 and a fountain at SAR 3,200. We firm up the figure once we have seen the wall and where power can be brought.

Where does the water to fill a pool come from in Jubail Industrial City?

From the Marafiq network, which supplies water and power in Jubail Industrial City. Once the tiles have had their three weeks, we agree a slow fill, no faster than 75 centimetres of depth per day.

Which details help you price a Jubail pool quickly?

Garden photos, rough sizes and where you would like the pool, sent to 0547879578, plus which side of Jubail the house is on and the shape and system you have in mind. For an existing pool, add photos of the coping and mosaic and the daily drop in level.

Related services

We work in Jubail and every Eastern Province city:

ع