Skip to content

Dammam and every Eastern Province city

العربية
Construction

Building Contractor in Dhahran – Villa Shells, Turnkey Builds & Tested MEP Rough-in

Building Contractor in Dhahran

Stand in front of a Dhahran villa whose ground floor is finished and whose first-floor column cages are already up, and the job looks half done. In truth the decisions that matter most for daily life in the house are still ahead: where the water pipes run, at what height the switch boxes sit, and when the walls get closed. As a building contractor in Dhahran, Aemar Al-Maryam General Contracting takes family villas from the first excavation to the handover walk, and it is common for us to be running two or three neighbouring villas for one family, each moving at its own pace. For orientation only: labour-only shell work (you buy the materials) is billed from SAR 74 a metre of floor area; our shell with concrete, steel and block supplied from SAR 325; a keys-in-hand villa from SAR 1,110 with standard finishes or SAR 1,480 with the excellent specification; and a modest rest house from around SAR 185,000. Dhahran villa quotes remain estimates until inspection and agreement, so ring or message 0547879578 to book the visit.

Dhahran is part of the Dammam, Al Khobar and Dhahran metro, and our crews reach it from Dammam in about the time they take to reach Dammam’s outer districts, so Dhahran projects carry no separate travel line. What sets our Dhahran work apart is the type of project: modern two-storey villas in quiet districts, and owners who care about what is behind the wall as much as about the facade. That is why this page spends real space on the services stage and its tests, then the rates with a worked example for a two-storey villa, then how we manage several villas at once.

Dhahran building at a glance

  • Typical Dhahran work: family villas of one or two storeys plus roof annex, a storey added once an engineer approves it, and rest houses or small blocks of flats built to approved drawings.
  • How you can contract us: we supply labour only, or labour plus materials for the frame, or the whole house finished at a standard, excellent or luxury level.
  • Opening figures: labour-only frame SAR 74 a metre; frame with our materials SAR 325; standard keys-in-hand SAR 1,110; excellent-grade handover SAR 1,480; rest house about SAR 185,000.
  • Billing area: every roofed floor added up, so a 400 m² plot can easily carry 520 m² of villa.
  • Before plaster: water lines pressure-tested, drainage water-tested, electrical boxes set to one line and level, routes photographed.
  • Several villas: a separate schedule, stage payments and weekly report for each villa.
  • Licence: lodged by your design office on Balady; Balady then asks us to confirm as builder.
  • Opening message: a photo of the drawings, or the plot size, storeys and Dhahran district, sent to 0547879578 on WhatsApp.

Building contractor in Dhahran: villas from shell to move-in

A building contractor in Dhahran is the party that builds the villa on the ground to the approved drawings and permit, and answers for the structure and walls, then for the services and finishes when the contract is turnkey. We do that work for the owner directly, under the engineering office that supervises the project and signs off each stage.

Most of what we are asked to build in Dhahran is a single-family villa: a ground floor with the majlis, family living room and kitchen, a first floor for bedrooms, and a small roof annex. We also get fewer but regular requests of other kinds: an owner who wants an extra floor on an existing villa, an investor building a small apartment block, or a family putting up a rest house outside the district. We take all of these, but this page describes what we know best in Dhahran, which is the villa.

■ Villa shell

Concrete frame, block walls and the sleeves cast into the concrete, handed over to whoever finishes the house, or finished by us under a separate contract.

■ Turnkey villa

The shell followed by electrical, plumbing, insulation, plaster, tiles, paint, doors and windows until the family can move in.

■ Neighbouring villas

Two or three villas for one family or one investor, each with its own schedule and report.

■ Extra floor or roof annex

After an engineer checks the columns and footings and the permit is amended on Balady.

Shell contractor in Dhahran: where a villa shell contract starts and stops

A villa shell is the house without finishes: digging and a blinding layer, pad footings with their neck columns and the ground beams that tie them, then the ground-floor slab, the columns and beams, the suspended slabs and the stair, then the block walls with their lintels. A shell contractor in Dhahran builds all of that with materials or as labour only, and hands the frame over ready for services and plaster.

The question Dhahran owners ask us most is “does the shell include such-and-such?” The honest answer is that it depends on what is written in the contract. So every shell contract we sign carries two lists, what is included and what is not, and the owner signs both before we dig. These are examples from both lists as we usually write them:

ItemUsually inside our shell contractAgreed separately
Excavation, backfill and compactionYes, to the drawings and soil reportReplacing weak soil or dewatering the report did not mention
Footings, neck columns and tie beamsYes—
Ground slab, columns, roof slabs and stairsYes—
Block walls and lintelsYes, insulated block outside to the specification—
Sleeves and conduits cast into concreteYes, before every pour—
Bitumen coating on buried concreteTo the written specificationAnything beyond it
Tanks, septic tank and boundary wall—Yes, a separate line
Services beyond the sleeves, plaster and finishes—Within turnkey or a separate contract
Fees, insurance and design and supervision offices—The owner’s, under the regulations

Shell contractor with materials in Dhahran, or labour only?

When we supply the materials, buying concrete, rebar and block to the specification, timing every delivery to the stage and absorbing the offcuts and waste are our problem. When you choose labour only, purchasing is yours and our crews handle formwork, rebar fixing, casting and block laying. Dhahran owners pick both routes; the deciding factors are how much time you have and whether you already know reliable suppliers.

An owner who buys materials needs to follow the site daily: how many tonnes of steel have arrived, how many blocks are left, and when the concrete for the first-floor slab must be ordered. We help with a bill of quantities taken from the structural drawings and a weekly stock count of what is on site, so the crew never stands idle waiting for a material and the yard does not fill up with things nobody needs. If you would rather have one party carry the whole responsibility, a shell with materials is easier, provided the specification is written down: concrete grade, the cement type the designer asks for, bar sizes, and block type and thickness.

Name materials by their technical description, not by adjectives

“High-quality materials” means nothing in a dispute. Write the concrete grade as shown on the drawings, the block type and thickness, and the cement type if the soil report calls for one. Those are things anyone can check on site and on delivery notes.

MEP rough-in in Dhahran villas: tested before the plaster goes on

Electrical and plumbing rough-in is installed after the blockwork and before plaster, and the walls are never closed over it untested: water supply lines under pressure, drainage with a column of water, and electrical circuits for insulation and continuity, with every box set to one level. The stage is short in the programme, but it decides whether you will live in the villa without breaking walls after you move in.

The reasoning is practical. Anything we bury at this stage becomes expensive to reach. A hot-water joint that is slightly loose stays silent on installation day unless it is tested that day; months later it appears as a damp patch on the paint of the room next door. A switch box set a centimetre too deep leaves a crooked switch no matter how careful the finishing electrician is. So in Dhahran we treat this as a hold point: plaster waits until the supervising engineer signs and the test sheet is in the file.

MEP Rough-in in Dhahran
Water pipes in the wall chases of a Dhahran villa connected to a hand test pump and pressure gauge, with electrical boxes set along one level line before plastering.

Pressure testing water pipes in Dhahran

Water supply pipes are tested once the whole run is installed and before any chase is filled. We fill the network, bleed the air out at the highest outlets, then hand-pump it to the test pressure the pipe maker specifies, which is higher than the pressure the house will run at, and watch the gauge for the hold period. A falling needle means a joint must be remade; we find it, fix it and restart the test from zero.

Saudi plumbing rules require supply pipework to hold tight at not less than its working pressure, and drainage and vent stacks to pass a standing-water test with a head of three metres or more kept for no less than fifteen minutes. We do both, invite the supervising engineer or his delegate to read the gauge, and photograph the needle and every pipe route before the chases close, so the owner has a map for future repairs. Materials, falls and fittings for the rough-in itself are explained on our plumber in Dhahran page.

Setting electrical boxes straight and to level

Before plaster, every switch and socket box is fixed at a height taken from the future tile surface rather than from the raw slab, and recessed to suit the thickness of the plaster coat. A taut levelled string across the wall keeps all the boxes in one room on the same line, and each box is left with enough cable tail for the second-fix electrician.

Then comes the electrical check itself: insulation resistance, continuity of conductors and correct polarity, before the conduits are closed in. Where a furniture layout exists we agree socket positions from it with the electrician, because moving a socket after plaster means opening the wall again. Circuits and the electrical rough-in in detail are on our electrician in Dhahran page.

  • ✓Before plaster: a water test record, a drainage test record, the electrical checks and photos of every wall.
  • ✓Responsibility: we coordinate the timing and prepare the site; the supervising office approves before closing.
  • ✓Records: photos of the routes with measurements are handed to the owner with the villa file.
  • ✓After closing: no wall is opened to move a route without a written instruction, because the cost falls on whoever asks for it.

Never close a wall over services that have not been tested

A tight programme can tempt a crew to plaster a room before its network is fully tested. We refuse, because a single leak found after the tiles are down costs many times the day you waited.

Construction price per m² in Dhahran: shell and turnkey

Here is the Dhahran rate card in one sentence: the frame costs from SAR 74 a metre if you buy the materials and from SAR 325 if we do, and a fully finished villa starts at SAR 1,110 a metre for standard finishes or SAR 1,480 for the excellent grade. Each figure is applied to the combined floor area of all storeys and, in Dhahran as everywhere we work, stays an estimate until inspection and agreement.

The final number comes from the drawings and the soil report. A simple villa with roofs on one level sits close to the starting rate; a villa with many projections, cantilevers and stepped roofs needs more formwork and steel. In finishing, the choice of materials makes the biggest difference.

What you are buying in DhahranOpening rateHow it is countedWhat to keep in mind
Frame by our crews, materials bought by youSAR 74per metre of every floorYou also book the concrete pump
Frame with our concrete, rebar and insulated outer blockSAR 325per metre of every floorFollows the structural sheets
Villa finished to a standard or mid gradeSAR 1,110per metre of every floorIncludes tested services
Villa finished to the excellent gradeSAR 1,480per metre of every floorLarger formats, better joinery
Villa finished to a luxury briefquoted per projectafter you choose materialsNo list price
Weekend rest house, roughly 150–250 m², without poolfrom SAR 185,000 for the compoundgood finish levelPool and garden priced on top
Block of flatsquoted per projectfrom its drawing setLift and parking extra
Upper storey on a lived-in villaquoted per projectafter the structural checkLicence amended first
Block walls onlyquoted per projectby wall area and block widthOwner-managed sites
Perimeter wall, water tanks, septic tank, utility hook-upsquoted per projectmeasured separatelyNever inside the metre rate

Two things decide where your Dhahran quote lands relative to these openings: the drawing set with the soil investigation, and the finish you pick. More storeys, deeper foundations or richer materials move it up; a compact, regular villa stays close to the first figure.

How the built-up area of a Dhahran villa is measured

We add up the ground floor, the first floor and the roof annex as shown on the approved drawings, then agree in writing how balconies, the stairwell and projections are counted. The plot area plays no part: a 500 m² plot can carry a villa of 450 m² or 650 m² of floor area depending on the design and the building regulations.

A stand-alone annex costs more per metre than a villa

If you are only building an annex or a separate majlis, the rate per metre is higher, because its footings, roof and site set-up are spread over a small area. See annex and majlis building in Dhahran.

Cost of building a two-storey villa in Dhahran: a worked example

Our worked example is a two-storey Dhahran villa totalling 520 m² of floor area: 250 m² downstairs, 230 m² upstairs and a 40 m² annex on the roof. At opening rates its frame with our materials comes to about SAR 169,000 (520 × 325), and a standard-finish handover to about SAR 577,200 (520 × 1,110). It is an illustration, not a quote.

ItemCalculationApproximate result
Villa built-up area250 + 230 + 40520 m²
Labour-only shell520 × 74SAR 38,480
Shell including materials520 × 325SAR 169,000
Turnkey, standard finish520 × 1,110SAR 577,200
Turnkey, excellent finish520 × 1,480SAR 769,600
10% contingency on standard turnkey577,200 × 0.10SAR 57,720
Planning budget, standard finish577,200 + 57,720SAR 634,920

These figures leave out the boundary wall and gate, the tanks and septic tank, the electricity and water connections, the permit fees, the latent defects insurance and the design and supervision fees. That is why there is a contingency line: it is not contractor profit but a margin for what the excavation may reveal or what you may ask for during the build. If you choose labour only, add to the SAR 38,480 the materials at the price you pay for them, plus pump hire and cube tests.

Two-storey villas in Dhahran: drawing decisions that move the cost

Some decisions are made once in the design office and then stay inside the price of every square metre. The first is the number of roof levels: a double-height living room or a majlis set lower than the rest of the floor means props and columns of different lengths and more formwork time. The second is projections and cantilevers on the facade, since each one needs its own steel and its own form. The third is the stair position, because it sets how the stairwell rises above the roof and whether the roof annex connects to it easily.

Other choices concern comfort more than money, until they come late and become money: keeping the upstairs bedroom wing apart from the guest side, turning windows for daylight and cross-breezes, and giving the maid’s and driver’s rooms their own bathroom. We settle these at a sit-down with the family and the designer ahead of approval, because changing them after the slabs are cast means demolition, not adjustment.

Villa construction in Dhahran: several villas at different stages

Villa construction in Dhahran often comes to us as a group: two brothers building neighbouring villas, or an owner building three matching villas to live in or to let. We run them as separate projects in the schedule and the payments, and as one operation in crews and equipment, so each villa is at a different stage at the same time.

Villa Construction in Dhahran
Three matching villas under construction in a Dhahran district: the first at footings and ground beams, the second a complete shell, the third rendered with its scaffolding coming down.

The idea is straightforward. When the carpenters finish the roof forms on the first villa they move to the footings of the second, and when the masons finish the blockwork on the second they start on the third. No crew stands idle, and different trades do not crowd one plot. It needs discipline on two points, though: a villa must not fall behind because its crew moved next door, and one owner’s materials must never be mixed with another’s.

Villa shell construction in Dhahran

When the contract is shell only, each villa is handed over once the blockwork and sleeves are complete, with a handover record listing the main dimensions and photos of the slabs and walls, so it can pass to whoever does the finishing. In a group we recommend one specification for all the villas, which keeps purchasing and stock counts simple.

Complete villa construction in Dhahran

In a complete villa our work continues after the shell into the services, plaster, insulation, tiles and paint, then doors, windows, sanitary ware and lighting. The advantage in a group is that the finishes in the first villa become a show unit the owner sees before we start finishing the second, so anything he does not like can be changed without paying for it twice.

What we organise in a groupHow
ProgrammeA schedule per villa with its stages, plus one board showing where each crew works this week
PaymentsTied to each villa’s own stages, not to the project as a whole
MaterialsA separate stock count per villa when the owners differ, or one count under a shared specification
ApprovalsThe supervising office signs off each villa’s stages; an approval never transfers from one villa to another
ReportsA weekly photo report per villa sent to the owner on WhatsApp

Turnkey construction in Dhahran: what each finish level means

A turnkey villa in Dhahran is one you walk into ready to live in. Our opening figure is SAR 1,110 a metre if you go for standard or mid-grade finishes, rising to SAR 1,480 at the excellent grade; luxury has no list price and is set once the materials are chosen. What separates the grades is the materials and the detailing, never the care in the work.

On the standard and mid grades we fit sensible ranges of tiles, doors and sanitary ware, interior paint from an agreed palette and simple lighting. The excellent grade brings larger porcelain or marble in the reception and stair, designed gypsum ceilings, and better windows, doors and facade materials. Every item is listed in a specification schedule attached to the contract, and the owner signs off each choice before we order. Already have a shell that only needs finishing? See finishing contractor in Dhahran.

Building a second floor or roof annex on a Dhahran villa

Building upward on a Dhahran villa only works when the original structural design allowed for an extra load on its columns and footings, or when a structural engineer specifies how to strengthen them. We therefore begin with an engineering assessment against the original drawings; the engineering office then updates the licence on Balady, and only then do we price the work.

Many modern villas were designed to take a roof annex rather than a full floor. In that case the annex is the lighter solution and our annex page covers it. If the new floor needs openings through an existing slab for its pipes, we use core drilling in Dhahran after the engineer approves, instead of breaking the slab.

Apartment building or rest house construction in Dhahran

Apartment building construction in Dhahran

Blocks of flats in Dhahran are quoted from their drawings after a site visit. Our metre rates give the starting point across all floors, and on top come the items only a building has: the lift, the parking the design requires, fire safety provisions and individual meters for each flat. Design and supervision for a multi-family building are also stricter than for a single villa.

Rest house construction in Dhahran

For a weekend rest house of roughly 150 to 250 m², finished well and without a pool, budget from SAR 185,000. A bigger majlis, a pool, shaded seating and landscaping are priced on top from the drawings, and pool construction has its own page on our site.

Building permit and engineering supervision in Dhahran

Who pulls the licence for a Dhahran villa? Not the builder. The design engineering office lodges the request electronically on Balady and lists the supervising office and the executing contractor; Balady then asks us to confirm, which we do. Our crews mobilise only after the licence is live and the official latent defects insurance (تأمين العيوب الخفية) policy is active.

  1. 1
    Appoint the design office
    You sign an authorisation for an engineering office, which draws the architectural and structural sets and uploads them on Balady.
  2. 2
    Technical review
    The drawings are checked against the Saudi Building Code and comments go back to the office until approval.
  3. 3
    Supervisor and contractor named
    The supervising office is selected and accepts; the executing contractor is named and accepts.
  4. 4
    Defects cover and fees
    The owner arranges the official hidden-defects policy and settles the municipal charges.
  5. 5
    Permit issued
    Only then do we set out and start digging.

Expect the file to contain the electronic deed, a current survey report, the design office’s contract, the supervising office’s and builder’s contracts, the insurance policy, the soil investigation and the signed undertakings. When the villa is finished, a completion certificate is issued on the strength of the supervising engineer’s report and the thermal insulation certificate, and the utilities are connected only after it.

Soil report for a Dhahran villa plot

The soil report is a mandatory document in the permit file, and it tells the designer the foundation type and depth and whether dewatering, a resistant cement or special protection for buried concrete is needed. We do not start digging in Dhahran before reading it, and we never rely on a neighbouring plot’s report.

Parts of the Eastern Province have shallow, salty groundwater and soil salts that attack concrete and rebar. That does not make every Dhahran plot the same; it means your plot gets its own report and the foundation design follows it. Tanking below ground and sealing the roof are explained in roof waterproofing and insulation in Dhahran.

Villa construction stages in Dhahran, in order

Villa construction in Dhahran starts with setting out the plot from the permit drawings, then excavation and footings, then the frame floor by floor, then blockwork with services and their tests, then insulation, plaster and finishes, and it ends with the completion certificate and handover. Each stage has a check point the supervising office signs before the next begins.

  1. 1
    Setting out and excavation
    The villa’s boundaries and levels are marked from the drawings, and excavation goes to the depth set by the soil report.
  2. 2
    Blinding, footings and tie beams
    Steel and concrete cover are checked before each pour; pouring details are on concrete pouring in Dhahran.
  3. 3
    Protection and backfill
    Buried concrete coated, backfill placed in compacted layers, and termite treatment to the specification.
  4. 4
    Ground slab, columns and roof slabs
    Floor by floor, with forms, steel and sleeves checked before each pour and curing after it.
  5. 5
    Blockwork and lintels
    Insulated block on the outer walls, every wall checked plumb, openings built to drawing size.
  6. 6
    Services and tests
    Water, drainage and electrical, then pressure and insulation tests and photos before closing.
  7. 7
    Insulation, plaster and finishes
    Roof insulation, then plastering in Dhahran, then tiles, paint and fittings.
  8. 8
    Completion and handover
    Supervisor’s report and completion certificate, then a walk-round snag list that is closed before the keys change hands.

No honest builder quotes one duration for every villa. Ours depends on the floor area, the number of slabs and how quickly the owner settles the finishing selections, so the contract carries a stage programme with target dates and the weekly report keeps it current.

Stage payments and contract terms in Dhahran

In Dhahran our invoices follow work you can walk around and inspect, not the calendar: foundations and tie beams first, then the ground slab, every suspended slab after it, the block walls, the services once their tests pass, the finishes, and a closing instalment at handover. The weight of each instalment is a matter for the contract.

Building with a bank loan or a housing programme? Line our payment stages up with the lender’s release points before signing, so no instalment falls due before the money is released. The contract also lists drawing and licence numbers, specifications, how floor area is measured, exclusions, the programme and the delay terms, how variations are approved, and who carts away the waste.

How to choose a building contractor in Dhahran

Choose a building contractor in Dhahran by what you can verify: will he accept being named in the permit file? Will he give you a list of what the price includes and excludes? Are payments tied to stages? Will he let the supervising office stop a pour if it finds a problem? Practical answers matter more than promises.

  • ✓Ask to visit a villa he built at shell stage if possible, because the shell shows what the finishes hide.
  • ✓Lay every quote against one identical drawing set and spec sheet; otherwise the cheapest number tells you nothing.
  • ✓Ask about the services tests: who runs them, when, and whether the records and photos are handed over.
  • ✓Avoid a contract that asks for a large payment before any work, or measures floor area after the build with no reference.
  • ✓A gang of day labourers can manage a boundary wall; a villa needs a builder whose name is on the licence and who answers for all of the execution.

How to order a building contractor in Dhahran

  1. 1
    Share what you have
    Approved drawings if they exist, otherwise plot size, storeys and Dhahran district, on WhatsApp 0547879578.
  2. 2
    Pick a contract route
    Labour only, frame with materials, or keys in hand, plus the finishing grade you have in mind.
  3. 3
    Inspection
    We visit the plot or the existing villa and review the drawings and the soil report if it is out.
  4. 4
    Estimate
    You receive an itemised estimate with exclusions and a proposed schedule.
  5. 5
    Sign and mobilise
    With the licence live and the defects policy active, we set out the plot and begin digging.

Why Aemar Al-Maryam in Dhahran?

Because we look at a Dhahran villa the way the family who will live in it does. The contract spells out what the price covers before the first trench, no chase is closed over untested pipes or cable, a photo report lands every week, and each payment hangs on a stage the supervising engineer has seen. Dhahran is part of our home zone with Dammam and Al Khobar, so you will not see a separate travel line. Finished jobs are on the projects page, all our rates on the prices page, what the service covers on the construction service page, and our deepest write-up in building contractor in Dammam.

Dhahran districts where we build

We work across Dhahran’s residential districts, including those our requests most often come from:

Al QusurSouth Al DanahNorth Al DohaNorth Al DanahSouth Al Dohaother Dhahran districts

District missing? Drop the plot location on WhatsApp. Everything we do in the city sits on our Dhahran area page. Building close by? Building contractor in Qatif covers checking older houses before a storey is added, and building contractor in Saihat covers apartment blocks and the weekly site meeting.

Planning a villa in Dhahran?

Send us the drawing set, or your plot dimensions and storey count, and our engineer returns an itemised estimate once he has reviewed them.

Tags

#building_contractor_in_Dhahran#building_contractor_Dhahran#construction_company_Dhahran#house_builder_Dhahran#shell_contractor_Dhahran#shell_construction_Dhahran#shell_with_materials_Dhahran#labour_only_building_contract#construction_cost_per_square_metre_Dhahran#turnkey_construction_Dhahran#turnkey_villa_Dhahran#villa_construction_Dhahran#two-storey_villa_cost_Dhahran#villa_shell_Dhahran#MEP_rough-in_Dhahran#plumbing_pressure_test#electrical_rough-in_before_plaster#second_floor_addition_Dhahran#apartment_building_construction_Dhahran#rest_house_construction_Dhahran#Balady_building_permit#latent_defects_insurance#villa_construction_stages#stage_payments_contractor#North_Al_Doha#South_Al_Doha#Al_Qusur#North_Al_Danah#South_Al_Danah

Request an inspection: Construction

Fill in the details and WhatsApp opens with your request so we can arrange the inspection.

Prices are estimates until inspection and agreement; the final price is set after the site visit.

Your request is saved first, then WhatsApp opens with a ready message. Nothing is sent until you press send in WhatsApp.

FAQ

What is the shell construction rate per square metre in Dhahran?

When we supply concrete, steel and block, a Dhahran villa frame begins at SAR 325 a metre of floor area; if you buy the materials, our labour starts at SAR 74 a metre. Both stay estimates until inspection and agreement, with the drawings and soil report fixing the final number.

What does a turnkey villa cost per square metre in Dhahran?

Standard or mid-grade handover begins at SAR 1,110 a metre and the excellent grade at SAR 1,480. A luxury brief is priced after the materials are chosen, and every rate is applied to the floor area of all storeys, never to the plot.

How much does a two-storey villa cost to build in Dhahran?

A villa with 520 m² of floor area starts from about SAR 169,000 as a shell with materials and about SAR 577,200 turnkey at a standard finish, as an illustrative example. The wall, tanks, fees and utility connections are extra, so we suggest a contingency of around 10%.

Do you test the water pipes before plastering?

Yes. Supply lines are tested with water at a pressure above working pressure as the manufacturer instructs, drainage with a water column as the plumbing code requires, and the gauge and routes are photographed. Plaster starts only after the supervising office approves.

Why do you care so much about the height of electrical boxes?

A box set at the wrong height or depth for the plaster thickness leaves the switch crooked or sunken after finishing. We fix all boxes in a room on one level string and measure their height from the finished tile level.

Do you build several villas at the same time in Dhahran?

Yes. We run two or three neighbouring villas with a schedule, payments and report for each, and crews move between them by stage. The supervising office signs off each villa's stages separately.

Is there a travel charge for Dhahran projects?

No. Dhahran is inside our Dammam and Al Khobar area, so there is no separate travel line. The price follows the drawings, the specification and the contract type.

Do you obtain the building permit?

Not the builder. Your design engineering office lodges it on Balady, names us as the executing contractor, and we confirm the assignment online; work starts only after the licence is live and the hidden-defects policy is active.

Shell with materials or labour only: what is the difference?

With materials, buying concrete, rebar and block to spec and absorbing the waste is our job. With labour only, you buy and chase the deliveries while we do the formwork, rebar fixing, casting and block laying, working from a bill of quantities and a weekly stock check on site.

Is it possible to add a storey to an existing villa in Dhahran?

Often, yes: a structural engineer must verify that the existing columns and footings can bear it, or design the strengthening, and the licence is then amended on Balady. Where a full storey is too heavy, a roof annex is the usual fallback.

What does the per-metre shell price leave out?

Usually the boundary wall and gate, tanks and septic tank, services beyond the sleeves, utility connections, permit and insurance fees and the engineering offices' fees. We list these exclusions in the contract before we start.

How are contractor payments arranged?

Against stages you can walk round and inspect: foundations and tie beams, the ground slab, each suspended slab, the block walls, tested services, finishes and handover. How much each instalment carries is agreed in the contract.

What do you need from me for an estimate?

Approved drawings if you have them; otherwise the plot size, storeys and district, plus the contract route and finishing grade you prefer. WhatsApp them to 0547879578 and we will book the site visit.

Related services

We work in Dhahran and every Eastern Province city:

ع