Skip to content

Dammam and every Eastern Province city

العربية
Bathrooms and kitchens

Kitchen Renovation in Al-Ahsa – Rest-House, Farm & Events Kitchens

Kitchen Renovation in Al-Ahsa

Kitchen renovation in Al-Ahsa for rest houses, farms and homes in Hofuf and Mubarraz: outdoor kitchens under a canopy with anti-slip porcelain and a linear channel drain, farmhouse annex kitchens with a proper floor drain and falls, and large events kitchens tiled to the ceiling with extract openings, plus plumbing, electrics and waterproofing, with the room handed over ready for your cabinet maker. A complete small kitchen starts from SAR 2,300, estimates until inspection, with travel to Al-Ahsa priced at the inspection; send photos of your kitchen on WhatsApp 0547879578.

Kitchen renovation in Al-Ahsa, as we do it, means rebuilding what sits under the finishes: stripping old tiles, re-running the plumbing, drainage and electrics, waterproofing the wet parts, and then laying floor and wall tiles that stand up to washing and heat. We work in houses in Hofuf and Mubarraz and, very often, at rest houses and farms, where the outdoor kitchen under a canopy, the annex kitchen and the events kitchen are part of everyday life. A small kitchen that we rebuild in full is priced from SAR 2,300, porcelain labour up to 60×60 from SAR 32 per square metre and kitchen plumbing rough-in from SAR 135. Treat each number as an estimate: it is firmed up after our inspection and your agreement, and the drive to Al-Ahsa is costed during that inspection too. Phone and WhatsApp: 0547879578.

A rest-house kitchen in Al-Ahsa has little in common with a kitchen in a flat. Big pots are scrubbed in it, whole lambs are washed, the floor is hosed down after every gathering, the sun comes in under the sides of the canopy and dust blows in from the surrounding farms. That produces a recognisable set of problems: a glossy tile that turns into a skating rink the moment it is wet, water that collects in the one corner furthest from the drain, a blockwork counter whose render has cracked, and a wall blackened by smoke because the extract opening is too small or missing altogether.

Aemar Al-Maryam General Contracting drives from Dammam to Al-Ahsa to carry out this work in a clear order: we read your photos first, then inspect and measure, and then group the items into one trip wherever possible. This guide explains what we do and what we do not do, how we handle each type of Al-Ahsa kitchen, and then sets out prices, a worked example and a handover checklist.

Your Al-Ahsa kitchen at a glance

  • What we do: tile and screed strip-out, sink, dishwasher and washing-machine plumbing, dedicated appliance circuits, floor and sink-zone waterproofing, porcelain and ceramic, channel drains and floor gullies, extract openings and hood core holes, moisture-resistant gypsum ceilings.
  • Outside our scope: cabinets in any material, timber or aluminium; our part ends with a room the carpenter can work in.
  • Kitchen types: rest-house outdoor kitchens, farmhouse annex kitchens, large events kitchens, and villa and flat kitchens in Hofuf and Mubarraz.
  • Starting prices: small kitchen, every item included, SAR 2,300; per square metre 14 strip-out, 32 porcelain, 27 wall ceramic, 26 waterproofing; SAR 75 per new electrical point.
  • Distance: roughly 160 km by road from Dammam; travel is priced at the inspection and its share of the bill shrinks when several jobs share the trip.
  • To order: photos, sizes and location on WhatsApp 0547879578.

Kitchen renovation in Al-Ahsa: what we do for rest houses, farms and homes

In an Al-Ahsa kitchen we take care of every layer from the bare slab and blockwork up to the face you see, so the room is handed over with level floors and walls, every point where it should be, and everything tested before it is covered. The work is the same at heart whether the kitchen is inside a villa in Hofuf or under a canopy at a rest house, but the details change: the tile, the way water leaves the floor, the size of the air openings and the number of circuits.

■ Strip-out and preparation

Lifting tired tiles and bedding, bagging the rubble, and exposing the wall so we can see the state of the render and the pipes behind it.

■ Plumbing and drainage

Hot and cold feeds with angle valves, wastes for sinks and the dishwasher, and a floor gully or channel drain wherever the room is washed down.

■ Electrics

Dedicated lines for the oven, washer, water heater and hood, sockets above the worktop, and RCD protection for sockets near water.

■ Waterproofing and tiles

A flexible membrane on the floor and around the sink, then porcelain or ceramic laid to considered falls, with wall tiling to the height you choose.

■ Air and ceiling

Extract openings in the wall, a core hole for the hood duct, and a moisture-resistant gypsum ceiling in indoor kitchens.

■ Ready for the cabinet maker

Flat walls, one floor level and points set out on the cabinet layout, so the carpenter can fit without breaking anything.

Each of these trades has its own detailed page if you need more than the kitchen: plumber in Al-Ahsa for wider plumbing in the house or rest house, electrician in Al-Ahsa for panels and circuits, and tile installer in Al-Ahsa for floors beyond the kitchen.

What we do not offer in Al-Ahsa: wooden and aluminium cabinets

We would rather say this before you call: cabinets are not something we sell, make, fit, or mend, and that covers their doors, hinges or drawers, whether they are wood or aluminium. That is the job of a kitchen carpenter or cabinet workshop, each with its own tools and measurements. Plenty of people searching for “kitchen renovation” actually mean the cabinets; if that is what you need, we are not the right contractor for it.

What we provide is everything the carpenter needs before he starts: a flat wall to hang the wall units on with no gap behind them, a floor at one level so the base units stand straight, and water, waste and power points exactly where his layout puts them. We are happy to go through the layout with him before the rough-in, because moving a waste point after tiling means breaking out again.

Before the cabinet maker arrives

Ask him for a dimensioned layout: sink position, dishwasher width, worktop height, and where the oven and hood go. We set the points out from that drawing and mark pipe and cable runs clearly on the wall, so he does not drill through them when fixing the units.

Rest-house outdoor kitchens in Al-Ahsa: anti-slip porcelain and a channel drain

The outdoor kitchen at a rest house is usually built under a concrete canopy or in a corner of the courtyard, with a blockwork counter carrying a burner and a large sink, and it is used for gatherings and cooking in quantity. Renovating it starts with the floor, because it is washed constantly and several people stand on it carrying hot pots. The classic mistake is a glossy tile chosen for its looks that becomes dangerous the moment it gets wet.

The right tile for an outdoor kitchen floor

Our recommendation is a porcelain whose face is matt or slightly gritty for grip, light or sand-coloured so it does not soak up too much sun, and with low water absorption. We fix it on a C2 improved cement adhesive with the back of every tile fully covered, because voids under outdoor tiles fill with water and the tiles then come loose. We leave movement joints at the edges of the floor and between large bays, since sun moves tiles and concrete by different amounts.

The linear channel drain and the falls

Instead of a small gully in the middle, an outdoor kitchen usually gets a linear channel drain with a stainless grate, running along the counter or at the edge of the canopy. We build the floor with a fall in one direction toward the channel, so all of the wash water reaches it rather than pooling in a corner. The channel connects to a waste line running to an inspection chamber, and we water-test that line before tiling. The stainless grate lifts out for cleaning, which matters here because outdoor kitchen water carries sand and leftovers.

The blockwork counter

A counter built in blockwork is sturdy and does not mind water the way timber does, but it needs a flat cement render before tiling and waterproofing at the sink, where water splashes. We tile the front and the top, or prepare the top for a granite slab you choose, which we then fit after inspection. Under the counter we leave ventilation openings and a clearly defined space for the gas cylinder, positioned by the licensed gas technician; we do not run any gas line ourselves.

Watch the water coming from the courtyard

If the whole courtyard falls toward the kitchen, wash water and rain will run onto its floor. We check the yard falls around the kitchen at inspection and suggest a raised threshold or a channel at the boundary if needed.

Farmhouse annex kitchens in Al-Ahsa

Farmhouses around Al-Ahsa often have a small annex with its own kitchen, used by the worker who looks after the farm or for preparing coffee and food for guests. It is small, but it usually sits on a ground-floor slab close to damp soil, and its waste line is long before it reaches the septic tank or an inspection chamber. So we start with the drainage and the damp before thinking about tiles.

Annex kitchen at a farmhouse in Al-Ahsa with a new floor drain
Setting a new floor drain in a farmhouse annex kitchen in Al-Ahsa, with the tiles around it laid to a clear fall.

A floor drain and falls proved with water

In an annex kitchen we set a floor drain where the room is washed and build the floor with a gentle fall toward it, enough for water to run without anyone noticing underfoot, in the region of half to one per cent. Before tiling we pour water and watch where it goes, and after tiling we check with a spirit level that the fall has survived. If the annex is part of a bigger project, the annex and majlis building in Al-Ahsa page deals with building the structure.

Damp and salts on the ground floor

Around much of the Eastern Province, salty groundwater sits only a short way below ground, and that moisture travels by capillary action into old walls and floors, leaving white bloom at the skirting and tiles that ring hollow. In that situation we do not tile over the problem. First we pin down the source, soil moisture climbing the wall or a pipe that weeps, deal with the source, then waterproof the whole floor with a flexible membrane turned up the walls and flood-test it before tiling. If the cause is a leaking roof, roof waterproofing in Al-Ahsa should come before the kitchen.

Events kitchens in Al-Ahsa: walls tiled to the ceiling

Larger rest houses keep a kitchen just for events, where cooks prepare food for dozens of guests with big pots and powerful burners. It needs a different finish from a home kitchen: walls tiled from floor to ceiling because steam and grease reach the top, a grey or darker anti-slip floor that copes with daily washing, and generous extract openings close to the ceiling.

Events kitchen at a rest house in Al Muhammadiyah, Al-Ahsa, tiled to the ceiling
Tiling the walls of an events kitchen at a rest house in Al Muhammadiyah, Al-Ahsa, up to the ceiling from a mobile scaffold, with extract openings formed high on the wall.

Sequencing a tall wall

We start with the extract openings, cutting or enlarging them before any tiling, because cutting a hole through finished tiles chips the edges. Then we check the wall is flat; if the render is wavy we correct it first. We tile from a mobile scaffold rather than a ladder, so the top course is laid as accurately as the bottom one. For the walls we use white or light glazed ceramic that wipes clean, and keep the anti-slip tile for the floor.

Power for a large kitchen

An events kitchen runs many appliances at once: fridges, large water heaters, extract fans and sometimes electric ovens. So we calculate the loads and split them across dedicated circuits with suitable breakers, rather than leaving one circuit to carry everything and trip halfway through the cooking. Sockets sit above the worktop and away from the sinks, protected by a 30 mA RCD. If the panel itself needs replacing, that is a job for our electrician in Al-Ahsa during the same visit.

Gas in an events kitchen

Large burners usually run on gas. Gas pipework, cylinders and tanks belong to a licensed gas fitter working to Civil Defence rules, not to us. We prepare the opening, route and space he asks for and time our work so he can come in after the tiling without breaking anything.

Kitchen plumbing in Al-Ahsa

Kitchen plumbing in Al-Ahsa starts with the water source: does it come from a roof tank or a pump, where is the heater, and how far is the drainage stack or inspection chamber? At rest houses and farms the waste runs are longer than in town houses, so the fall is planned from the first metre of pipe, because a kitchen waste needs roughly a 2% fall to stop grease settling in it.

  • ✓Supply: hot and cold to the sink with an angle valve on each, a point for the dishwasher or washing machine, and space for a filter if you want one.
  • ✓Waste: 40 mm pipe with a trap for a domestic sink, and larger sizes for big sinks in events kitchens depending on how many there are.
  • ✓Materials: heat-fused PPR for the supply and uPVC for the drainage, never the other way round.
  • ✓Testing: the supply is held under pressure at or above the pressure it will run at, and the waste is filled with water, while everything is still exposed.
  • ✓Records: we photograph every pipe route before tiling, so you know later where it is safe to drill.

If you only need the sink or mixer changed rather than a full renovation, that is a separate item from SAR 75. Any visible leak or damp patch under the sink is traced to its source before we suggest breaking anything out.

Kitchen electrics in Al-Ahsa

Electrics are the item nobody thinks about until the breaker trips. Our rule is simple: every high-load appliance gets its own circuit with a breaker sized to its rating, lighting and sockets are on separate circuits, and the worktop sockets are protected by a 30 mA RCD. The Saudi electrical code is based on IEC 60364, which calls for this additional protection on socket outlets in areas close to water.

■ Oven and electric hob

A dedicated line with cable and breaker to the rating in the appliance manual, priced at inspection.

■ Dishwasher and washing machine

A low-level socket next to the sink and a separate circuit for each machine.

■ Hood and water heater

A power connection for each, from SAR 65.

■ Worktop sockets

Above worktop level, clear of the sink and hob, and enough of them for small appliances without an extension lead.

Older houses in Hofuf and Mubarraz may still have points on the old 127 V supply, from before residential supply in the Kingdom moved to 230/400 V. We convert those in coordination with the electricity company as part of the job, because plugging a modern appliance into an unchecked old point can damage it.

Kitchen extract and ventilation in Al-Ahsa

A hood that does not send its air outside simply raises the heat and humidity in the kitchen and leaves grease on the ceiling. So we core an opening for the hood duct through an external wall or out to a light well. A typical domestic hood duct is about 150 mm, which means a 5 or 6 inch core priced from SAR 140. We fit a cowl with a back-draught flap at the outlet to stop air and dust blowing back in, which matters in Al-Ahsa where the wind carries a lot of dust.

In events and annex kitchens we add square extract openings high on the wall for extract fans, sized with whoever is supplying the fans. We never point the hood duct into a false-ceiling void, because grease and steam would collect above the gypsum. For hole sizes and methods see core drilling in Al-Ahsa.

Renovate or refresh? A decision that saves money in Al-Ahsa

A refresh is cosmetic: fresh paint, tiles laid over a sound old layer, perhaps a new mixer. A renovation goes beneath that, to the pipes, drains, wiring and waterproofing. If the kitchen is dry, the tiles are firm and the sockets never get warm, a refresh may be all you need. If you see any of the following, the kitchen needs renovating:

  • ✓Hollow-sounding tiles when tapped with a screwdriver handle, or tiles whose edges have lifted.
  • ✓A drain smell that cleaning does not shift, from a dry trap or a pipe laid without fall.
  • ✓White salt bloom at the base of the wall or behind the counter, especially in ground-floor annexes.
  • ✓Standing water in one corner of the outdoor kitchen floor after washing.
  • ✓Warm sockets or a breaker that trips whenever the oven runs alongside another appliance.

In Al-Ahsa in particular we see many outdoor kitchens tiled straight onto concrete with no falls at all, and the answer there is to break the floor out and rebuild it falling toward a channel drain. The walls, on the other hand, can sometimes be tiled over if the old tiles are firmly bonded, after scuffing and with an improved adhesive, allowing for the extra thickness at the counter edges and doors.

Ceiling, render and paint in Al-Ahsa homes

In indoor kitchens in Hofuf and Mubarraz villas we fit a moisture-resistant gypsum board ceiling, the green board intended for wet rooms, with an access hatch to the hood duct and any valves running above it. Kitchen walls get cement render, because gypsum plaster does not belong where there is water. We use a washable, moisture-resistant paint and give new render its drying time before normal paint so it does not blister. For ceiling work in more depth, see our Al-Ahsa gypsum board page.

Common mistakes in rest-house and farm kitchens

  • ✓A glossy tile in a kitchen that gets hosed down: lovely on handover day and slippery at the first gathering.
  • ✓One gully in the middle of a long floor: water sits at the ends and creeps under the counter.
  • ✓Tiling before the waste is tested: and finding the pipe has no fall once the tiles are on it.
  • ✓A hood duct that ends above the false ceiling: grease builds up over the gypsum and stains appear months later.
  • ✓One circuit for the whole kitchen: the breaker trips whenever the heater, fridge and oven coincide.
  • ✓Forgetting where the gas goes: the gas fitter arrives after tiling and breaks the wall to get his line through.

Looking after the kitchen afterwards

Clean the channel grate after every gathering so it does not fill with sand and scraps, and pour water into gullies that are rarely used so the trap does not dry out and let smells through. Keep an eye on the grout around the sink; if it cracks, refill it early before water gets under the tiles. Press the test button on the RCD now and then to make sure it still trips.

Kitchen renovation prices in Al-Ahsa

Item rates in Al-Ahsa are no higher than our published Dammam starting prices; the only difference is travel, which we fix after the inspection. A small kitchen done as a complete job starts from SAR 2,300, and partial work is priced by item as shown here:

Work in an Al-Ahsa kitchenFrom (SAR)Charged per
Small kitchen with every structural item done together: breaking out, plumbing, waterproofing at the sink, economy tiling (cabinets excluded)2,300kitchen
Matt anti-slip porcelain up to 60×60, labour32m²
Ceramic on the floor (fixing only)23m²
Wall ceramic, half height or to the ceiling, labour27m²
Economy tiles including material, adhesive and fixing37m²
Breaking out old tiles and bedding and removing them14m²
Levelling and forming falls before tiling14m²
Flexible membrane under the tiles, floor and sinks26m²
Kitchen plumbing: sink, filter, washer point135kitchen
Cutting out and replacing a damaged pipe165section or point
New mixer or sink75mixer
Additional electrical point75point
Breaker added to the board for one appliance90breaker
Wiring the hood or the water heater65point
Fitting a socket or switch face18piece
Ceiling spotlight with its cut-out9each
Light strip beneath the wall units45linear metre
Hood duct core, 5 or 6 inch140opening
Green moisture-resistant gypsum board ceiling74m²
Cement render to a wall or counter18m²
Interior paint: economy or higher grade14 or 32m²
Taking down a non-load-bearing block wall185wall
Cutting a door or window opening in concrete140opening
Linear channel drain, dedicated oven line, granite fittingat inspection—
Any change to a load-bearing wall, slab or beamat inspection after an engineer’s report—
Getting the crew to Al-Ahsaat inspectionvisit
Wood or aluminium cabinetsnot offered—

All figures are estimates until we inspect and agree, they cover labour except where material is mentioned, and they move with the area, the state of what lies under the tiles, the tile type and access. Cabinets, appliances and gas are not included. The SAR 2,300 figure applies only where we handle the whole of a small kitchen; a single job is charged on its own line.

Worked example: a rest-house outdoor kitchen in Al-Ahsa

Illustrative example of an outdoor kitchen under a canopy with a floor of 4 × 2.5 m and a 4 m back wall to be tiled to 2.4 m high, needing a new floor laid to falls, new electrics and a hood opening. Worked at starting prices, labour only:

What we measureWorkingResult
Canopy floor4 × 2.510 m²
Back wall4 × 2.49.6 m²
Levelling and forming falls10 × 14SAR 140
Floor waterproofing10 × 26SAR 260
Anti-slip porcelain floor10 × 32SAR 320
Back-wall ceramic9.6 × 27SAR 259.20
Sink plumbing rough-inkitchenSAR 135
New electrical points4 × 75SAR 300
Dedicated breakerbreakerSAR 90
Hood duct coreone openingSAR 140
Total (labour)about SAR 1,644.20

On top of that come the linear channel drain, priced on its length and grate type, and the travel to Al-Ahsa, both fixed at the inspection. The example does not include a new counter, stone, appliances or any gas work. If the old floor tiles also have to come up, 10 m² of strip-out adds 10 × 14 = SAR 140.

Travel to Al-Ahsa and how to keep it down

The road distance between Dammam and Al-Ahsa is around 160 km, so travel is not a fixed sum; we set it after the inspection according to the number of days and the equipment needed. It pays to bundle jobs into a single visit: if the rest house also has a bathroom to renovate, a courtyard floor or a roof to waterproof, send those photos with the kitchen ones and the travel is spread over several items instead of one. For bathrooms specifically, see bathroom renovation in Al-Ahsa.

How we organise a kitchen job from Dammam to Al-Ahsa

Working away from Dammam calls for tighter planning, because one forgotten fitting can cost a day. So we follow a fixed sequence:

  1. 1
    Reading the photos
    From your pictures we identify the type of kitchen and what it needs, and ask about appliances and the carpenter.
  2. 2
    Inspection and measuring
    We measure, tap the tiles, check the drainage and electrics, and agree the items and travel.
  3. 3
    Strip-out and rough-in
    We break out and run plumbing and electrics in the first days, photographing every route.
  4. 4
    Testing
    Pressure on the supply, water in the waste, and the membrane held under water for 24 hours minimum.
  5. 5
    Tiles and openings
    Floor and wall tiling, the channel or gully, and the air openings.
  6. 6
    Handover to the carpenter
    The kitchen comes back to you with route photos, and the carpenter and gas fitter follow us.

Expected duration for an Al-Ahsa kitchen

Duration depends on how much is broken out, the test hold times, adhesive and grout curing, and whether the materials you chose are ready. A small annex kitchen is quicker than an events kitchen tiled to the ceiling. After the inspection we send a day-by-day schedule, planned so the crew stays on site until every item that can be finished on that trip is finished.

Taking over the kitchen: what to check

  • ✓Water and falls: tip a bucket of water on the floor and watch; it should all run to the channel or gully without standing anywhere.
  • ✓Tiles: knock across them with the handle of a screwdriver and listen for one consistent note, with no hollow patches.
  • ✓Plumbing: no drips under the sink with hot and cold running, and the gauge held steady during the test.
  • ✓Electrics: every socket works, and the RCD test button cuts the power.
  • ✓Air: the hood duct exits to the outside and the flap on the outlet moves freely.
  • ✓Photos: you receive photographs of the pipe and cable routes before they were closed in.

If anything comes up at handover we note it and put it right before the carpenter starts, because fixing tiles once the cabinets are in is far harder.

Reasons to choose Aemar Al-Maryam in Al-Ahsa

■ A clear scope

We tell you at the start what we do and what we do not, so nobody is surprised that cabinets are not included.

■ Published prices

Starting prices are listed by item, and travel is fixed at the inspection rather than guessed.

■ Tested before closing

We never tile over a pipe or membrane that has not been tested.

■ Rest-house know-how

We understand what outdoor and events kitchens need in falls, drainage and ventilation.

When the kitchen is one part of renovating a whole house or rest house, read renovation contractor in Al-Ahsa. For the full step-by-step explanation of kitchen renovation see kitchen renovation in Dammam, and for completed work visit our projects page.

Kitchen renovation in Hofuf, Mubarraz and across Al-Ahsa

Our crews cover both Hofuf and Mubarraz as well as the farms and istirahas on their outskirts, including these districts:

Al KutHofufAl MuhammadiyahMubarrazAl RashidiyahAl RawdahAl MazrouiyahMahasin AramcoAl KhalidiyahAl FadiliyahAl ShuabahAl SalhiyahAl NaathilRest houses and farms

We offer the same service for kitchen renovation in Khafji and kitchen renovation in Hafr Al-Batin, and in the remaining cities of the Eastern Province. For local information see the Al-Ahsa area page, for all our rates the price guide, and for the service overview bathroom and kitchen renovation.

Ordering your Al-Ahsa kitchen renovation

WhatsApp these details to 0547879578; an approximate cost comes back to you before anyone visits:

  • ✓Photos: floor, walls, ceiling and under the sink, and where water leaves an outdoor kitchen.
  • ✓Sizes: length, width and height, or a simple hand sketch.
  • ✓Type of site: rest house, farm or house, and whether the kitchen is indoors or under a canopy.
  • ✓Appliances: oven, burners, dishwasher, water heater, fridges, extract fans.
  • ✓Location: a pin on the map, plus which days you can host us.

A rest-house kitchen ready for your next gathering

Share the pictures and measurements today, and we will plan a single trip that deals with the whole kitchen.

Tags

#kitchen_renovation_in_Al-Ahsa#kitchen_renovation_Al-Ahsa#kitchen_renovation_Hofuf#kitchen_renovation_Mubarraz#kitchen_renovation_company_Al-Ahsa#kitchen_renovation_contractor_Al-Ahsa#kitchen_refurbishment_Al-Ahsa#rest_house_outdoor_kitchen#rest_house_kitchen_Al-Ahsa#farmhouse_annex_kitchen#events_kitchen#kitchen_tiled_to_the_ceiling#anti-slip_porcelain#linear_channel_drain#kitchen_floor_drain#kitchen_floor_falls#kitchen_tile_strip-out_Al-Ahsa#kitchen_plumbing_Al-Ahsa#kitchen_electrics_Al-Ahsa#kitchen_floor_waterproofing#kitchen_hood_core_hole#kitchen_extract_opening#tiled_blockwork_counter#salt_damp_ground_floor#kitchen_renovation_cost_Al-Ahsa#kitchen_renovation_prices_Al-Ahsa#kitchen_ready_for_the_cabinet_maker#Eastern_Province_kitchen_renovation

Request an inspection: Bathrooms and kitchens

Fill in the details and WhatsApp opens with your request so we can arrange the inspection.

Prices are estimates until inspection and agreement; the final price is set after the site visit.

Your request is saved first, then WhatsApp opens with a ready message. Nothing is sent until you press send in WhatsApp.

FAQ

Do you carry out kitchen renovation in Al-Ahsa, or only in Dammam?

Al-Ahsa is part of our area: both cities, Hofuf and Mubarraz, and the farms and istirahas nearby. The crew drives over from Dammam on a date we fix after seeing your photos, and we try to fit all of the kitchen work into a single trip. Send pictures and a map pin on WhatsApp 0547879578.

How much does kitchen renovation cost in Al-Ahsa?

Where we renovate a small kitchen completely, with the break-out, plumbing, sink waterproofing and budget tiles, the price begins at SAR 2,300. Smaller requests go by the item: porcelain fixing begins at SAR 32 a square metre, an extra power point at SAR 75. Travel to Al-Ahsa is added and fixed at the inspection.

Are cabinets part of what you supply?

They are not. We do not supply, build, install or repair wooden or aluminium cabinets. Our work is the room itself: floor, walls, plumbing, electrics, waterproofing and the hood opening. We hand it over ready for whichever cabinet maker you choose.

Which tile suits a rest-house outdoor kitchen floor?

A matt or textured anti-slip porcelain with low water absorption, because the floor is hosed down often and sits in sun and dust. We bed it on an improved cement adhesive with full coverage, laid to falls toward the drain, with movement joints at the edges.

Why a linear channel drain rather than a small gully?

Outdoor kitchens are washed with a hose after big cooking sessions, and the water carries sand and food scraps. A channel along the counter collects it over its whole length with the floor falling one way, and its stainless grate lifts out for cleaning, and nothing is left lying in the corners.

Do you tile events-kitchen walls up to the ceiling?

Yes. It suits kitchens that cook in large quantities, because steam and grease reach the top of the wall. We work from a mobile scaffold and form the extract openings before tiling, so nothing has to be cut out of finished tiles later.

Do you install gas for an events kitchen?

No. A licensed gas fitter handles it in line with Civil Defence requirements, and our only part is preparing the route and openings he specifies.

Why is there white salt at the bottom of ground-floor kitchen walls in Al-Ahsa?

Usually rising damp from the ground or a nearby leak carrying salts to the surface. Re-tiling will not fix it. We check the drains and pipes first, then waterproof the floor and the base of the walls before tiling.

What size is a kitchen sink waste?

For a domestic sink 40 mm with a trap is common, laid at about a 2% fall. For events kitchens with several large sinks we check the number of sinks and where the inspection chamber is before choosing the size and route.

Is a dedicated circuit needed for the oven?

Yes, always. Ovens, electric hobs and dishwashers draw heavy current, so each has its own line with a breaker chosen from the rating plate, and the worktop sockets are protected by a 30 mA RCD.

How long does a rest-house kitchen renovation in Al-Ahsa take?

It depends on how much has to be broken out, the hold times for plumbing and waterproofing tests, and adhesive curing. After the site visit you get a written day plan, arranged so the crew is not driving back and forth from Dammam for nothing.

Which details help before the site visit?

Pictures of the floor, the walls, the ceiling and the cupboard under the sink, rough dimensions, the type of site (rest house, farm or house), the list of appliances, whether the kitchen is indoors or under a canopy, and a map pin.

Can a kitchen be renovated without breaking everything out?

Sometimes. Where every old tile is still stuck fast and nothing sounds hollow, a new layer can be laid on top after scuffing, using an improved adhesive, while allowing for the extra height at the door. Corroded pipes, a leaking waste or hollow tiles mean breaking out that area.

Related services

We work in Al-Ahsa and every Eastern Province city:

ع