Older houses in Abqaiq often have a kitchen built around a fixed concrete counter cast into the wall, a handful of sockets on one circuit and a single door to the living room. Today’s owner wants modern units, more appliances and a direct way out to the yard. Our kitchen renovation in Abqaiq starts there. Aemar Al-Maryam General Contracting breaks out the old counter, re-plans the points and runs new wiring with every socket checked on a tester, and cuts a service door to the yard through a non-load-bearing wall under a lintel that carries the blockwork above. Then we re-plumb, waterproof and tile. Prices open at SAR 2,300 for a compact kitchen we carry through every trade, plus a travel charge we set once we have seen the house. Ring or message 0547879578.
Abqaiq is a governorate of the Eastern Province on the Dhahran road, with single-storey traditional houses on generous yards alongside newer villas. The kitchen in an older house was designed for another era: a concrete worktop clad in tiles, a water heater on the wall, two or three sockets. That layout has no room for a dishwasher, a built-in oven or standard-size ready-made units, so renovating it is more a re-plan than a re-tile.
Your Abqaiq kitchen in brief
- Demolition: the old concrete counter and the tiles with their bedding, with buried services protected.
- Wiring: separate feeds for cooker, dishwasher, washing machine and air conditioner, counter-height sockets, and a tester run over each outlet.
- Yard door: an opening in a non-load-bearing wall under a concrete lintel; a load-bearing wall waits for an engineer.
- Prices: complete small kitchen SAR 2,300, power point 75, breaker 90, socket 18, plumbing rough-in 135; counter, door and travel at inspection.
- Not our trade: timber and aluminium cabinets; we prepare the room for the kitchen carpenter.
Kitchen Renovation in Abqaiq: Re-Planning the Old Kitchen
Kitchen renovation in Abqaiq, in an older house, begins with how you want to use the room rather than the colour of the tiles. Where will the sink go? Is there a dishwasher? Is the oven built in under the counter or in a tall housing? Where does the fridge stand? Do you want to reach the yard without crossing the living room? Those answers draw the plan, and the plan decides what comes out, what stays and where pipes and cables will run.
■ Coming out
the concrete counter, old tiles with their bedding, and any sockets or pipes with no place in the new plan.
■ Going in
appliance circuits, an AC point, dishwasher plumbing, a hood exit and a door to the yard.
■ Ready for the carpenter
straight walls, a level floor, and points at heights written on his drawing.
A kitchen renovation company in Abqaiq, or a builder plus tradesmen?
In a kitchen being re-planned the trades overlap. Whoever breaks out the counter must know where the old pipe runs, the electrician must know where the new door will be, and the tiler must not start before the services are tested. When one kitchen renovation contractor in Abqaiq runs it all, that sequence becomes his responsibility instead of yours. A short outline of the service is on our kitchen and bathroom renovation page.
When does an old Abqaiq kitchen need re-planning?
- ✓No space for a dishwasher: the concrete counter fills the wall and nothing can be opened beneath it.
- ✓Ready-made units will not fit: their standard sizes do not match the height or depth of the built counter.
- ✓One socket feeding several appliances: extension leads on the worktop and a breaker that trips.
- ✓An old heater over the sink: it takes the space for wall units and puts the counter at risk of leaks.
- ✓A long way to the yard: every rubbish bag and laundry basket goes through the living room.
- ✓Broken tiles round the counter: with black grout that will not come clean.
If three of these sound familiar, a cosmetic refresh will change little; it is better to re-plan the kitchen once and do it properly.
What We Do Not Do in Abqaiq Kitchens
Cabinets, timber or aluminium, are entirely outside our work: no selling, no building, no fitting and no repairs to doors, hinges or drawers. If you want to keep your present units to move them to an annex or sell them, the carpenter takes them down before demolition starts. That is not a gap in our service but a clear division: the kitchen carpenter knows his craft, we know ours, and a good kitchen needs both in the right order.
What we give the carpenter is a room ready for him: the old counter gone and the wall behind it repaired, a level floor, outlets placed to match his plan in both position and height, and the hood duct hole cored right over the hob. His plan reaches us before any pipe or cable is laid; with no carpenter yet, we draft an arrangement for you to approve.
Removing Built-In Concrete Counters in Older Abqaiq Kitchens
Removing the built-in concrete counter is day one in most older Abqaiq kitchens. These counters were cast or built in place, some with light reinforcement, clad in tiles or marble, and quite often the sink waste and a cable run underneath or right through them. So we do not start with the breaker; we first work out what is inside.
- 1Isolate water and power
the kitchen valve is shut and its circuits switched off, and we confirm with a tester that nearby points are dead. - 2Trace the services
the sink and mixer come off and we follow the pipe and cable into the counter so nothing is cut blind. - 3Cut it free of the wall
a saw line along the joint so breaking the counter does not pull the wall plaster with it. - 4Break it in stages
top down with an electric breaker, cutting any steel as we reach it. - 5Clear the rubble
in bags or a wheelbarrow to an agreed spot, with the corridor and doors protected. - 6Make good
level the floor and repair the wall ready for the new services.
Removing a concrete counter is priced at inspection, since length, thickness, any steel inside and how hard it is to get the rubble out all change it. Lifting old tiles with their bedding elsewhere in the kitchen starts from SAR 14 per m². For larger demolition in the house, see demolition contractor in Abqaiq.
A heater on the wall or under the counter
In some older kitchens the water heater sits above or inside the counter. We disconnect and drain it before demolition and agree its new position in the plan; if it stays in the kitchen it gets its own circuit, valves and safety valve.
A Door from the Kitchen to the Yard in Abqaiq
Among owners of Abqaiq houses with a courtyard, few requests come up as often as a back door straight from the kitchen, because it shortens the trip to the laundry, an outdoor kitchen or the bins without passing through the living room. It is simple work when the wall is non-load-bearing block and dangerous when it is not. So we always check first: we look for columns and beams, see which way the roof spans, and ask for the house drawings if they exist. Any doubt that the wall carries load means an engineer comes before us, and changing structural elements needs a municipal permit through an engineering office.

How we open a doorway in a block wall
- 1Set out
draw the doorway at your door size plus room for its frame, once a scan confirms no service crosses the area. - 2Saw the outline
with a cutting disc on both faces so the edges come out straight and the blocks around them do not crumble. - 3Lintel first
we open a pocket at the head and seat a precast concrete lintel, or cast one in place, with enough bearing on each side, and let cast concrete gain strength. - 4Remove the blockwork
below the lintel once it is set, working from the top down. - 5Finish the reveals
build up and plaster the jambs and leave the opening ready for the door frame.
A concrete wall changes the method to diamond sawing, priced from SAR 140 per door or window opening; details on concrete cutting in Abqaiq. A doorway in block with its lintel is priced at inspection. The door and frame are your choice; we hand over the opening ready.
Threshold and yard level
The yard is often lower or higher than the kitchen floor. We set the threshold so wash-down water and rain from the yard stay out, and slope the outside paving away from the door.
Kitchen Electrics in Abqaiq for Modern Appliances
Kitchen electrics in an older Abqaiq house usually mean rebuilding the kitchen’s circuits, because a single circuit that once coped with a kettle and a fridge cannot carry an electric oven, a dishwasher, a microwave and an AC unit. We split the kitchen into circuits: each heavy appliance has its own, with a breaker sized to the rating on its data plate; counter sockets are grouped behind a 30 mA residual-current breaker; and the lights run on a circuit of their own.
| Point | Usual position | Note |
|---|---|---|
| Counter sockets | roughly 1.0–1.1 m up the wall, over the worktop | spaced out, away from the sink rim, none above the cooktop |
| Dishwasher and washer | about 60 cm, in a neighbouring cupboard | a separate circuit each |
| Oven or electric hob | by type: under the counter or in a tall housing | a full circuit priced at inspection |
| Air conditioner | high on the wall to suit the unit | own circuit and breaker |
| Hood | high above the hob | as the hood manual specifies |
| Fridge | behind it at a height its body does not block | its own socket, not a shared one |
Some older houses still have points, or some of them, on the old 127 V supply that predates the 230/400 V standard for homes. If we find that we tell you before starting, because converting involves reviewing the panel and meter with the electricity company, priced at inspection. For electrical work elsewhere in the house, see electrician in Abqaiq.
Testing new sockets with an instrument before handover
Instrument testing is what lets us call the wiring finished rather than simply say the light came on. After tiling and fitting the sockets, we go round them one by one with a multifunction tester and record the results.

- ✓Insulation resistance: measured on the new cables before they are energised; the international testing standard uses 500 V DC and looks for at least 1 MΩ on ordinary circuits.
- ✓Earth continuity: confirming the earth terminal of every socket is actually connected back to the panel earth.
- ✓Polarity: live and neutral in their proper places, a fault that does not show in normal use but is dangerous.
- ✓RCD: tested with the instrument and then with its own button, and it must trip both times.
- ✓Load: heavy appliances run together while we watch the breakers.
On price: each added point from SAR 75; an appliance breaker from SAR 90; the hood or heater supply from SAR 65; sockets and switches from SAR 18 apiece when the finishes go on; ceiling spots from SAR 9 including the hole; LED strip under wall cabinets from SAR 45 a metre.
Kitchen Plumbing in Abqaiq After Moving the Sink
When the new plan moves the sink, we re-plumb the whole kitchen rather than joining old to new. Hot and cold supplies run in heat-fused PPR to two angle valves under the sink, with a dishwasher point and a filter point added; the sink waste runs in uPVC, normally 40 mm, falling at about 2% to the nearest inspection chamber or stack. In houses with a yard the waste run outside can be short, but we check the chamber invert before deciding the route.
Then we test: supplies under pressure with the gauge watched before tiling, wastes with water. The plumbing set for sink, filter and one washer begins at SAR 135; a bad stretch of pipe is renewed from SAR 165; mixers and bowls go in from SAR 75. For house and roof plumbing, see plumber in Abqaiq.
Sink-Zone Waterproofing and Kitchen Tile Replacement in Abqaiq
With the old counter gone and services in, the wet corner around sink and dishwasher gets a brushed-on flexible membrane that climbs the wall, a tape bandage in the internal angle, and then standing water for a day or more to prove it before any tile is laid. Flexible waterproofing starts from SAR 26 per m². On a ground floor with salts at the skirting we treat the whole floor.
Kitchen tile replacement in Abqaiq comes once the walls are closed over tested services. Fixing floor ceramic runs from SAR 23/m² in labour, wall ceramic from SAR 27/m², porcelain up to 60×60 from 32, economy tiles supplied with adhesive from 37, and levelling before tiling from 14. Where a concrete counter has been removed we level its footprint carefully, because that strip rarely sits at the same height as the surrounding slab. For other tiling, see tile installer in Abqaiq.
How high the wall tiles go
We agree the worktop and wall-unit heights with the carpenter before tiling the walls so the tiles stop where they should. Owners who want easier cleaning tile all the way to the ceiling.
Kitchen Extractor and Ceiling in Abqaiq
Kitchens in houses with yards have one advantage: the outer wall is close, so the hood duct run is short. A 5–6 inch core through that wall, priced from SAR 140, takes the duct, and the outer end gets a grille with a back-draft flap at the outside end to keep out dust and insects, since the area’s dust gets in through any open hole. The hood is wired from SAR 65, and it never discharges into the ceiling void. For other core holes, see core drilling in Abqaiq.
Overhead, green gypsum board that tolerates steam (from SAR 74/m²) with a hatch by the duct. Untiled walls are rendered in cement plaster (from SAR 18/m²) and finished in wipeable paint, SAR 14/m² for budget grade with materials and SAR 32/m² for the better grade. For plastering, see plastering contractor in Abqaiq.
After the Old Counter: Granite, Gas and Opening Up
Granite worktop installation in Abqaiq
A granite top is the usual replacement for the old concrete counter. It goes on once the carpenter has finished installing and levelling the carcasses, and we measure from them as built. The slab is yours to pick; cutting, setting and the holes for bowl and hob are ours. In outdoor yard kitchens it can sit on a built base. Priced at inspection.
Gas
If the hob moves, the new gas route and its cylinder or tank are handled by a licensed gas fitter following Civil Defence requirements; our part is opening the wall where he wants it.
Knocking the kitchen through to the majlis or hall
The same rule as the yard door applies to an open-plan scheme: it works when the wall is non-load-bearing block, and taking the whole wall out starts from SAR 185. A load-bearing wall is not touched without an engineer and a permit. Bigger house-wide projects are described under Abqaiq renovation contractor.
An outdoor kitchen in the yard
Many Abqaiq families prefer an outdoor kitchen in the yard for heavy cooking, slaughtering and gatherings, which keeps the house kitchen clean. Where that room already has walls and a roof, we fit it out as we would indoors: plumbing and a sink draining to the inspection chamber, power with sockets protected from water and dust, a core for the air outlet, and easy-wash tiles falling to a floor drain. Building a new room from the ground up is annex work, covered on annex and majlis builder in Abqaiq.
Kitchen Renovation Cost in Abqaiq
In Abqaiq, a kitchen renovation cost begins at SAR 2,300 when the room is compact and we do the demolition, pipework, wet-zone membrane and budget tiling as one package; cabinets are never part of it. A re-plan adds items, some priced from the table and some at inspection:
| Item | Starting price (SAR) | Unit |
|---|---|---|
| Small kitchen with every trade included, no cabinets | 2,300 | kitchen |
| Breaking out a built-in concrete counter | at inspection | by length, thickness and steel |
| Old tiles lifted with bedding | 14 | m² |
| Floor levelling before tiling | 14 | m² |
| Ceramic laid on the floor, labour | 23 | m² |
| Ceramic fixed to walls, labour | 27 | m² |
| Porcelain no bigger than 60×60 (labour) | 32 | m² |
| Economy tiles including adhesive | 37 | m² |
| Flexible membrane to floor or sink zone | 26 | m² |
| Kitchen plumbing: sink, filter, washer outlet | 135 | kitchen |
| A length of pipe replaced | 165 | section or point |
| Mixer or sink bowl | 75 | mixer |
| A power point we add | 75 | point |
| Breaker for an appliance circuit | 90 | breaker |
| Supply to hood or water heater | 65 | point |
| Socket or switch | 18 | piece |
| Spotlight with cut-out | 9 | each |
| Under-cabinet strip light | 45 | linear metre |
| Oven or electric hob circuit | at inspection | by rating |
| 5–6 inch hood core | 140 | opening |
| Moisture-resistant gypsum ceiling | 74 | m² |
| Cement render to walls | 18 | m² |
| Wipeable paint incl. materials, budget / better | 14 / 32 | m² |
| Whole non-load-bearing block wall removed | 185 | wall |
| Door or window sawn through concrete | 140 | opening |
| Doorway in a block wall with its lintel | at inspection | opening |
| Granite top in your chosen stone | at inspection | by length and cut-outs |
| Structural element such as a bearing wall | after an engineer’s opinion | — |
| Crew travel from Dammam to Abqaiq | at inspection | visit |
| Cabinets of any kind | not our work | kitchen carpenter |
Figures in SAR are starting estimates until inspection and agreement, and are labour unless a line includes materials. They vary with kitchen size, wall and floor condition, tile type and access, and exclude cabinets and appliances.
Lines marked “at inspection” get their number once we have seen them. Photograph the counter and the wall you want opened and send the pictures to 0547879578 for an early estimate. The rest of our services and their opening prices are collected in our price overview.
Worked example: re-planning an older Abqaiq kitchen
Illustrative example: a kitchen 3.6 × 3 m with 2.9 m walls, a 0.9 × 2.1 m door to the living room and a 1 × 1 m window, plus a new 0.9 × 2.1 m door to the yard. The owner wants ceramic on the floor and on the walls to the ceiling, seven new power points, three dedicated circuits for the dishwasher, washer and AC, and ten sockets and switches at second fix:
| Item | Calculation | Amount (SAR) |
|---|---|---|
| Floor area | 3.6 × 3 | 10.8 m² |
| Wall area less the three openings | (3.6 + 3) × 2 × 2.9 = 38.28 − 1.89 − 1 − 1.89 | 33.5 m² |
| Tiles lifted with bedding | 44.3 × 14 | 620.2 |
| Floor ceramic | 10.8 × 23 | 248.4 |
| Wall ceramic | 33.5 × 27 | 904.5 |
| Sink-zone membrane | 4 × 26 | 104 |
| Sink and outlets plumbing | kitchen | 135 |
| Seven power points | 7 × 75 | 525 |
| Breakers for three circuits | 3 × 90 | 270 |
| Sockets and switches at second fix | 10 × 18 | 180 |
| Hood power | point | 65 |
| Hood core | opening | 140 |
| Total of priced lines | about 3,192.10 |
Added after inspection: breaking out the concrete counter, the yard doorway with its lintel, and travel from Dammam. The figure excludes the tiles themselves, cabinets, appliances, the granite top and gas.
Keeping travel costs down in Abqaiq
We plan in grouped stages: the inspection day, then consecutive days for demolition, openings and first-fix, then a visit for testing and waterproofing, then tiling and finishes. Add other jobs in the house, a bathroom, some plastering or painting, and each item carries less of the travel.
Mistakes We See When Old Abqaiq Kitchens Are Updated
- ✓Breaking the counter before tracing what is inside: a severed pipe or a live cable under the rubble.
- ✓A doorway with no lintel: cracks above the opening within weeks, and the blockwork may drop.
- ✓Assuming every internal wall is non-structural: some older houses rest their roofs on walls.
- ✓Adding appliances to the old circuit: tripping breakers and warm sockets.
- ✓Handing over wiring untested: a disconnected earth or reversed polarity that only shows when something fails.
- ✓A new door with no fall outside: yard water runs into the kitchen.
- ✓A hood outlet with no grille: dust and insects come in through the duct.
Taking Over Your Renovated Abqaiq Kitchen
- 1Electrical results
ask for the results sheet for each circuit and press the RCD test button yourself. - 2The new door
look at the wall above the lintel: no cracks, straight reveals, and a threshold that keeps water out. - 3Where the counter was
the floor flush with the rest of the kitchen and the wall made good. - 4The sink
run the water a few minutes and check the joints underneath stay dry. - 5Tiles
tap them: no hollow note, and full grout lines. - 6Records
keep the photos of pipe and cable routes we took before tiling, so you know where not to drill.
How long does an Abqaiq kitchen take?
We do not quote a duration before inspection, because in a kitchen being re-planned it depends on the size of the counter and how its rubble leaves, on the lintel concrete setting before the blocks below come out, on the test gauge holding, on at least a full day of flood testing, and then on tile curing. You get a stage plan with the days the crew will be in Abqaiq, and the day your carpenter can move in, so his slot is booked well ahead.
What to Send on WhatsApp for an Abqaiq Kitchen
- ✓Photos of the kitchen from all four corners and a close-up of the old counter.
- ✓The wall where you want the yard door, from inside and from the yard.
- ✓Rough sizes, or a hand sketch showing doors and windows.
- ✓The appliances going into the kitchen, and whether it has an AC unit.
- ✓A photo of the electrical panel if possible.
- ✓Any layout sketch from your carpenter.
We reply with an itemised first estimate and a travel figure, agree an inspection date, then work in order: demolition and openings, first-fix, testing, waterproofing and tiles, ceiling and paint, and finally the cabinet maker.
Why Aemar Al-Maryam for Your Abqaiq Kitchen
■ Controlled demolition
services traced before the counter is broken, wall and floor protected.
■ Safe openings
a lintel over every new door, and no structural wall touched without an engineer.
■ Tested wiring
every socket checked on an instrument, with the results written down for you.
■ Grouped visits
work planned from Dammam to keep travel down.
We also tell you at the outset what we do not do, such as cabinets and gas, so you can line those trades up in good time. See our projects, and the full kitchen guide in kitchen renovation in Dammam.
Abqaiq and Around: Where We Go
Kitchens in traditional houses with yards, villas and annexes across Abqaiq governorate are all within our reach on trips arranged from Dammam, sometimes combined with work running on Ras Tanura kitchens or Jubail kitchens. Everything else we offer in the governorate is listed under Abqaiq.
Re-plan your Abqaiq kitchen
Photograph the old counter and the wall you want opened and send the pictures; we agree the inspection and estimate with you before we travel.
Nearby articles and services
Article tags


