What does kitchen renovation in Hafr Al-Batin include? With us it covers everything below the finishes: tile strip-out, plumbing and drainage, appliance circuits, sink-zone waterproofing and then the tiling. In Hafr Al-Batin villas and houses three requests come up again and again: large-format porcelain on the kitchen walls, an outdoor annex kitchen in the courtyard, and moving the sink with the floor raised in foam concrete over new drains. Prices open at SAR 2,300 for a small kitchen rebuilt in full, SAR 14 a square metre for taking up tiles and SAR 135 for the plumbing first fix, each one provisional until our visit and your go-ahead, with travel to Hafr Al-Batin priced at the inspection. Contact: 0547879578.
Large villa kitchens in Hafr Al-Batin are treated as part of the face of the house, so many owners pick big marble-look porcelain slabs that cover the wall with very few joints. It is a handsome choice but an unforgiving one: a wavy wall shows in the reflection, missing adhesive behind a slab makes it ring, and careless cutting around sockets exposes the edges. The courtyard kitchen, on the other hand, needs toughness more than beauty, and moving a sink needs the falls worked out before any tile is laid.
The Aemar Al-Maryam General Contracting team is based in Dammam and reaches Hafr Al-Batin on planned dates. On this page we explain how we handle each of those requests and what we do not offer, followed by prices and a worked example for a villa kitchen. If your kitchen is in a flat or a smaller house, the same principles apply; the difference is size and number of items, not method, so we never skip a test or tile over a problem because the kitchen is small.
The short version for Hafr Al-Batin
- Scope: strip-out, plumbing and drainage, appliance circuits, waterproofing, floor and wall tiles, vents and cored hood outlets, damp-proof gypsum overhead, and a raised floor where the drains demand it.
- Excluded: wooden and aluminium kitchen cabinets entirely; the room goes to the cabinet maker.
- Requests we see often here: large-format wall porcelain, courtyard annex kitchens, moving the sink and burying the new waste in foam concrete.
- Starting figures: SAR 2,300 complete small kitchen, 14 strip-out, 32 porcelain to 60×60, 26 waterproofing, 135 plumbing, 75 per electrical point.
- Travel: priced after the inspection, with each item carrying less of it when jobs are grouped.
- Get in touch: photos and sizes on WhatsApp 0547879578.
Kitchen renovation company in Hafr Al-Batin: the service as we deliver it
We renovate the kitchen from its base to its finish and hand it back with straight walls, a floor at one level and tested points. The work normally passes through these stages, and we skip any that are already sound:
■ Removal
Breaking out old tiles and bedding, exposing pipes and cables, and carting away the rubble.
■ Services
Water and drainage on new routes, and dedicated circuits for the oven, washers, heater and hood.
■ Floor
Levelling, or raising in foam concrete, then a flexible membrane at the sink or across the whole floor.
■ Walls
Truing the surface, then ceramic or large-format porcelain to the height you want.
■ Air
Cored outlets for cooker hoods, plus fan openings in outdoor kitchens.
■ Handover
Route photos, a checklist and a room ready for the carpenter.
Need the same trades elsewhere in the house? See our Hafr Al-Batin pages for plumbing, electrical work and tiling.
Kitchen cabinets are outside our service: what we hand the carpenter
To be clear from the first line: kitchen cabinets, wooden or aluminium, are never supplied, built, fitted or mended by us, and we do not change their doors or hinges. That is the speciality of the kitchen carpenter and his workshop. If you are searching for “kitchen maintenance” in the sense of fixing cupboards, you will not find that service with us.
What we do for the carpenter is what makes his work easier and more accurate: we set water, waste and power points on his drawing to the centimetre, true up the wall he will hang units on, and leave the floor under the base units dead level. With large-format porcelain we also agree the wall-unit positions with him before tiling, so we can arrange the slabs and keep their joints out of the line of sight above the worktop.
Get the carpenter’s drawing before we start
A drawing showing each unit width and the sink and oven positions can save you breaking an expensive large slab later because a socket ended up in the wrong place.
Large-format kitchen wall porcelain in Hafr Al-Batin
Large-format porcelain, such as 60×120, 120×120 or full slabs, gives a kitchen wall a continuous look with few joints, and it is popular in Hafr Al-Batin villas. It differs from ordinary ceramic in three ways: the wall behind it must be flatter, the adhesive must cover the whole back of each piece, and lifting and cutting need specialist tools.
Flatness comes first
For tiles with any edge longer than about 38 cm, the American installation standard widely used in tiling limits surface deviation to 3 mm over 3 m. So we check the wall with a long straightedge in several directions, and if it is wavy we correct it with cement render or a levelling coat before tiling. Trying to make up for an uneven wall with extra adhesive behind a big slab leaves voids and uneven edges.
Adhesive and full coverage
We use a C2 improved cement adhesive, notch-trowel it on the wall and skim a thin coat across the slab’s back as well, so coverage is complete with no air pockets. A large slab that rings when tapped has part of it hanging in air and can crack if something knocks it. We lift each slab with a suction-cup frame that spreads its weight and place it on the wall flat, in one go.
Cutting around sockets and outlets
Every socket and water outlet in a wall clad with big porcelain means a precise cut inside a slab. So we fix outlet positions before tiling, arrange the slabs so outlets fall near their edges wherever possible, and make the cut-outs with diamond tools rather than by snapping. Joints are sized to suit the tile format and type and filled with water-resistant grout.
Pricing large-format porcelain
Our table gives a starting labour rate of SAR 32 per square metre for porcelain up to 60×60. Bigger formats get a price once we have seen the job, because that price hinges on the wall condition, the number of cuts and the slab size. For tiling in general see tile installer in Hafr Al-Batin.
Moving the sink and raising the kitchen floor with foam concrete
When a homeowner wants the sink moved under a window or into a central island, the question of falls appears. The pipe that drains a sink only works properly with a gradient of about 2%, letting water and grease run, which is roughly 2 cm for every metre. If the new sink is 4 m from the drainage point, the pipe needs about 8 cm of drop, plus its diameter and some cover. If the existing floor cannot take that, the answer is to raise it.

Testing the drains before backfilling
Before anything is poured over the pipes we test them: we fill the wastes with water and watch every joint, pressure-test the supply lines, and photograph the full routes. We cap the vertical pipe ends so concrete cannot get in. After the backfill, getting at a single joint means breaking up the floor, which is why we never shortcut this stage.
Why we do not backfill with sand
Uncompacted sand settles over time and with water, leaving a void under the tiles; they ring hollow and then crack. Foam concrete is a cement mix full of air bubbles, far lighter than ordinary concrete, so the slab barely notices the extra weight, and it fills around the pipes with no gaps. Once it has set we lay a cement screed over it with a calculated fall, then the membrane, then the tiles. Raising the floor changes the level at the door and threshold, so we work it out with the carpenter before he cuts his units.
How much does the floor rise?
We do not raise the floor more than necessary. The height is worked out from the furthest waste point: the fall needed along the pipe, then its diameter, then cover to protect it, then the screed, membrane and tiles. Sometimes it is enough to raise only the strip along the pipe route, with a small step or gentle ramp at its edges, rather than the whole room. We show you both options at the inspection with their effect on the door and worktop height, because raising the floor by 5 cm means the base units also stand 5 cm higher.
For larger pouring work around the house see concrete pouring in Hafr Al-Batin. Floor raising is priced at inspection according to its thickness and area.
An outdoor annex kitchen in a Hafr Al-Batin courtyard
Many Hafr Al-Batin houses have a second kitchen outside, built in blockwork in a corner of the courtyard, where heavy dishes and whole lambs are cooked so the smells and smoke stay out of the house. That kitchen faces desert sun and dust and is washed with water, so it needs a durable finish before a pretty one.

- ✓Extract opening: square and high on the wall for an extract fan, sized by agreement and formed before tiling.
- ✓Floor: anti-slip tiles with a gentle fall to a drain, over a membrane if the house suffers from damp.
- ✓Walls: light ceramic that wipes clean, reflects light and does not hold the sun’s heat.
- ✓Electrics: a dedicated feed from the house panel with RCD protection, and sockets set well above the floor, away from wash spray.
- ✓Door and threshold: a threshold that keeps courtyard water out, and a floor slightly higher than the yard.
If the outdoor kitchen already exists and needs renovating, that is our work here. If you want to build a new annex from the ground up, our Hafr Al-Batin annex builders put up the structure, and we then take on the interior finishing.
When does a kitchen in Hafr Al-Batin need renovating?
Not every wish for change is a renovation. Where the room stays dry, nothing underfoot moves, water leaves the sink freely and the circuits carry the load, new finishes can be enough: a coat of paint, a fresh wall layer laid over keyed old tiles, a different tap. These signs, though, mean the problem is beneath the surface:
- ✓Slow drainage that keeps blocking: usually a pipe with too little fall or grease build-up in a long run.
- ✓Tiles that ring or crack along one line: debonded bedding or backfill that has settled underneath.
- ✓Damp at the bottom of the wall or behind the units: a leaking joint or rising damp on the ground floor.
- ✓A breaker that trips when the oven runs with another appliance: one circuit carrying more than it can.
- ✓Grease and stains on the ceiling: a hood with no real outlet to the outside.
In these cases we do not start with new tiles but with the cause: we expose the route, correct the fall or replace the section, test, and then close up. Often a partial renovation is enough, such as breaking out only the sink area and re-running its waste, without touching the rest of the kitchen.
Ceiling and render
Indoor kitchens get green damp-resistant board overhead (SAR 74 a square metre upward), with a little hatch for reaching the hood duct. Should the old plaster under the tiles turn out soft, it is replaced with a sand-and-cement coat rather than gypsum, and let it dry before any paint. Untiled areas get a washable paint.
Mistakes we see in villa kitchens
- ✓Large porcelain on a wavy wall: edges sit unevenly and the reflection looks broken.
- ✓Dabs of adhesive behind a big slab: it rings hollow and cracks at the first knock.
- ✓Burying pipes in sand: it settles over time and the tiles above crack.
- ✓Moving the sink without working out the fall: slow drainage is discovered after the cabinets are in.
- ✓Sockets scattered across a porcelain wall: the slabs end up chopped by many cuts.
After handover
Leave large porcelain free of knocks or heavy fixings until the adhesive has had its time, keep strong acids off the grout, and clear the outdoor kitchen drain grate after every big cook-up. Try the RCD with its test button every few months.
Kitchen renovation prices in Hafr Al-Batin
Item rates in Hafr Al-Batin are our published Dammam starting prices with nothing added, plus travel set after the inspection. The table follows the order of the work:
| Stage | Work | Unit | From (SAR) |
|---|---|---|---|
| Full package | Small kitchen: strip-out, plumbing, sink waterproofing, budget tiles (no cabinets) | kitchen | 2,300 |
| Removal | Taking up old tiles and their bed | m² | 14 |
| Removal | Knocking down a non-structural block wall to open the kitchen | wall | 185 |
| Removal | Sawing a door or window opening in concrete | opening | 140 |
| Plumbing | Kitchen first fix: sink, filter, washer point | kitchen | 135 |
| Plumbing | Renewing a failed pipe section | section or point | 165 |
| Plumbing | Fitting a mixer or sink | mixer | 75 |
| Electrics | Extra point in an existing kitchen | point | 75 |
| Electrics | Breaker for a single-appliance line | breaker | 90 |
| Electrics | Supply to the hood or water heater | point | 65 |
| Electrics | Second-fix socket or switch plate | piece | 18 |
| Electrics | Spotlight with cut-out / under-unit strip | each / l.m | 9 / 45 |
| Floor | Levelling before tiling | m² | 14 |
| Floor | Flexible membrane, floor and sink zone | m² | 26 |
| Tiling | Floor ceramic (labour only) | m² | 23 |
| Tiling | Wall ceramic (labour only) | m² | 27 |
| Tiling | Porcelain up to 60×60 (labour only) | m² | 32 |
| Tiling | Budget tiles with material and adhesive | m² | 37 |
| Air | Hood outlet core, 5 or 6 inch | opening | 140 |
| Ceiling and walls | Moisture-resistant gypsum board | m² | 74 |
| Ceiling and walls | Cement render | m² | 18 |
| Ceiling and walls | Paint, economy / higher grade | m² | 14 / 32 |
| At inspection | Porcelain larger than 60×60, foam-concrete floor raising, oven line, granite worktop | — | at inspection |
| At inspection | Load-bearing wall, slab or beam | — | after an engineer’s report |
| At inspection | Crew journey from Dammam | visit | at inspection |
| Not offered | Wood or aluminium cabinets | — | — |
Read every row as provisional until the site visit and your approval. Rows are workmanship unless they mention material, and they rise or fall with room size, the state of walls and floor, slab size and which storey. Cabinets, appliances and gas lie outside the table. The 2,300 figure is the entry price for a small kitchen we take on in full; a one-off item is billed on its own row.
Worked example: a villa kitchen in Hafr Al-Batin
Illustrative example of a villa kitchen measuring 4 × 5 m with a 3 m ceiling, one 0.9 × 2.1 m doorway and one 1.5 × 1.2 m window. The brief: break out floor and wall tiles, level and waterproof the floor, lay 60×60 floor porcelain, rough in the plumbing and replace two damaged sections, add eight electrical points and two dedicated breakers, and core a hood opening:
| Item | Working | SAR |
|---|---|---|
| Floor | 4 × 5 | 20 m² |
| Walls less door and window | (4 + 5) × 2 × 3 = 54 − 1.89 − 1.8 | 50.31 m² |
| Breaking out floor tiles | 20 × 14 | 280 |
| Breaking out wall tiles | 50.31 × 14 | 704.34 |
| Floor levelling | 20 × 14 | 280 |
| Floor waterproofing | 20 × 26 | 520 |
| 60×60 floor porcelain | 20 × 32 | 640 |
| Plumbing rough-in | kitchen | 135 |
| Two damaged sections | 2 × 165 | 330 |
| Electrical points | 8 × 75 | 600 |
| Two dedicated breakers | 2 × 90 | 180 |
| Hood core | opening | 140 |
| Total, labour | about 3,809.34 |
That total excludes the large-format wall porcelain, which is priced at inspection by size and wall condition, any floor raising needed to move the sink, and travel. If you chose ordinary wall ceramic instead of large porcelain, the wall tiling line would be 50.31 × 27 = SAR 1,358.37, bringing the total to about SAR 5,167.71. Cabinets, appliances and gas are outside the whole calculation.
Travel to Hafr Al-Batin
Travel is not a lump sum; we estimate it after seeing the site, based on the working days and the equipment we will bring. The cheaper route is to bundle nearby jobs in the house into one visit, such as the kitchen and bathrooms or the kitchen and repainting, so the travel is spread over more than one job. For bathrooms in the city see bathroom renovation in Hafr Al-Batin.
Granite worktop fitting for Hafr Al-Batin kitchens
The worktop is not a cabinet, but it sits on top of them, so plenty of people ask about it. We fit a granite worktop when you have chosen the stone yourself, either on the carpenter’s units once they are installed or on blockwork bases in an outdoor kitchen. Granite suits kitchens better than marble because it copes with heat and scratches, whereas marble reacts with acids such as lemon and vinegar and loses its polish, and sealing it does not prevent that.
Before fitting we check the units are level, mark the sink and hob cut-outs from the actual appliance sizes, and leave a flexible joint between the worktop and the tiled wall. In an outdoor kitchen we give the top a very slight fall toward the sink so water does not sit on it. Fitting is priced at inspection according to length, number of cuts and stone type.
Kitchen electrics in Hafr Al-Batin
Big villa kitchens carry more appliances: a built-in oven, an electric hob, a dishwasher, a microwave and sometimes two fridges. Every high-load appliance gets its own line with a breaker matched to the rating in its manual, lighting is kept separate from sockets, while counter-level sockets sit behind a 30 mA residual-current device, the extra safeguard written into IEC 60364, the international reference behind the Kingdom’s electrical code.
With large porcelain in particular we fix socket positions precisely before tiling and group them where possible in horizontal rows at one height above the worktop, so the cuts fall within one slab instead of spreading across several. In older houses we check for points still on the old 127 V supply and convert them to 230 V in coordination with the electricity company.
Plumbing and waterproofing in Hafr Al-Batin kitchens
Water feeds are run in PPR joined by heat fusion, wastes in uPVC, and the two are never swapped. A domestic sink gets a 40 mm waste with a trap, two angle valves under the sink and a kitchen isolation valve. We test the supply at no less than its working pressure and the waste with water before anything is covered.
Then the waterproofing: the sink and dishwasher zone gets a flexible membrane carried up the wall behind them, and the whole floor is waterproofed when it lies at ground level with signs of damp or salt, or when the kitchen sits above a room. We flood-test the membrane for at least 24 hours before the screed and tiles. If the damage comes from a leaking roof, roof waterproofing in Hafr Al-Batin should come first.
Kitchen hood outlet in Hafr Al-Batin
A domestic hood duct is usually about 150 mm, so we core a 5 or 6 inch opening through the outside wall, from SAR 140, and fit a cowl with a flap that keeps dust out when the hood is off, which matters with the dust of Hafr Al-Batin. The duct never ends above a false ceiling. Outdoor kitchens get a square extract opening high on the wall for a fan. For hole details see core drilling in Hafr Al-Batin.
Open-plan kitchens in Hafr Al-Batin villas
An open-plan kitchen is a common request when villas are updated. When the partition is non-structural blockwork, we demolish it, make good its ends and run the tiles and ceiling through between the two spaces, with demolition from SAR 185. If the wall carries a slab or hides a column or beam, nothing happens until a structural engineer has reported and Balady has issued a permit, because an ordinary renovation permit does not cover changes to structural elements. For demolition work see demolition contractor in Hafr Al-Batin.
Kitchen renovation steps and duration in Hafr Al-Batin
- 1Photos and drawing
We receive the photos and the carpenter’s drawing if there is one, and decide what needs inspecting. - 2Inspection
Walls are checked for flatness, drains are inspected, and the list of items and the travel cost are settled. - 3Strip-out and services
Old finishes come off, and pipes and cables are laid out exactly as drawn. - 4Test and backfill
We test waste and supply, then raise the floor in foam concrete if needed. - 5Membrane and screed
Flexible waterproofing and a flood test, then a levelling screed. - 6Tiles and handover
Porcelain or ceramic, then openings and ceiling, and the room goes to the carpenter.
How many days it takes comes down to the amount of demolition, any floor raising, test times, and how long the adhesive under large slabs needs before grouting. We send you a day plan after the inspection and try to keep the working days consecutive.
Your kitchen handover checklist
- ✓Porcelain: run your hand over the joints; no raised edges. Tap the slabs; one even sound with no hollow ring.
- ✓Flatness: hold a long straightedge against the wall; no obvious gap beneath it.
- ✓Floor: if we raised it, no dips or cracks, and its level at the door as agreed.
- ✓Drainage: run the sink hard; it drains without gurgling or backing up.
- ✓Electrics: try every socket and press the RCD test button.
- ✓Records: receive the route photos taken before backfilling and tiling.
Any remark is noted and dealt with before the carpenter starts, because work after the cabinets are fitted is harder and dearer.
What sets Aemar Al-Maryam apart in Hafr Al-Batin
■ Large-porcelain accuracy
We true the wall before tiling and check the adhesive coverage behind every slab.
■ Falls worked out
We decide on raising the floor with numbers, and test the drains before burying them.
■ Published item rates
And when something needs an inspection, we say so.
■ A plain scope
No cabinets and no gas, and a clear drawing for whoever follows us.
The most complete kitchen guide on our site is kitchen renovation in Dammam; for renovating the whole house see renovation contractor in Hafr Al-Batin. You can browse finished jobs in our project gallery.
Hafr Al-Batin districts we reach
Villas, family houses and apartments are all within reach; districts we regularly visit:
In the north and east of the province we offer the same service in Khafji and Al-Ahsa. City information is on the Hafr Al-Batin page, all starting prices on the prices page, and the service description on the bathroom and kitchen renovation page.
Order a kitchen renovation in Hafr Al-Batin
Message WhatsApp 0547879578 and an estimated cost comes back before the inspection:
- ✓Photos: the kitchen from several angles, under the sink, and the wall to be tiled.
- ✓Sizes: length, width and height, with the door and window positions.
- ✓Changes: will you move the sink or oven? Do you want the kitchen opened to the living room?
- ✓Tiles: the porcelain type and size, if you have chosen it.
- ✓Appliances and carpenter: the appliance list and the cabinet drawing if there is one.
- ✓Location: a map link to the house and the days that work for you.
A level porcelain wall and a floor that will not sink
Photograph your kitchen now and tell us what you want to change; we will send back the items and their estimated cost.