Skip to content

Dammam and every Eastern Province city

العربية
Core drilling

Core Drilling in Abqaiq – Utility Entries, Extractor Holes & Concrete Test Cores

Core Drilling in Abqaiq

Core drilling in Abqaiq is something we do in one scheduled visit that covers every hole your house or shop needs: the entry for the main water pipe through a boundary wall or outside wall, drain and cable holes, the extractor hole high on the back wall of a restaurant, and the concrete test cores an engineer wants from an older slab. Aemar Al-Maryam General Contracting drills them with a water-cooled diamond core rig after scanning for rebar, without breaking out the surrounding concrete. The lowest price on our list is SAR 90, for an AC-sized hole; final figures are fixed only after we have seen the site and agreed terms. Call or WhatsApp 0547879578.

Abqaiq is a small town, and the core jobs here are few in number but varied in kind. One house needs a single hole for a water pipe, a restaurant being fitted out needs a big hole for its hood, and the owner of an older house wants to know whether the roof slab can carry another floor before building on it. Because we travel from Dammam, the best thing you can do is gather all of that into one list that we bring on one visit. This page explains how to write that list, then goes through each kind of hole and what it needs.

Core drilling in Abqaiq in brief

  • What we drill: water, drain, power and telecom entries; extractor and AC holes; slab holes between floors; and concrete test cores.
  • Where: houses, villas and small apartment buildings, shops and restaurants on commercial streets, and boundary walls.
  • Starting prices: from SAR 90 (small), SAR 140 (5–6 in), SAR 230 (8 in) and SAR 320 (10–12 in). Test cores and larger holes get a price after inspection, and none of these numbers is final until then.
  • How we work: one scheduled visit with a complete list, so travel is shared and each hole costs less.
  • Test cores: drilled where the engineer specifies and handed to the lab; the report and decision belong to the engineer.
  • To order: WhatsApp the list, photos and map pin to 0547879578.

Core drilling in Abqaiq: write the full list before the visit

Core drilling in Abqaiq starts for us with a sheet of paper, not a machine. Every hole you know about before the date is a bit we bring with us, and a hole slipped into the same day is much cheaper than one that forces a return journey. So we ask you to walk round the house or shop with whoever will fit the pipes and write down every hole you will need in the coming months, however small.

ItemExample of what to writeWhy we need it
Locationfront boundary wall right of the gate / back wall of the kitchenso we know the access and the wall type
Purposewater pipe from the meter / restaurant hood / test core from the roof slabthe purpose sets the diameter, slope and sealing
Diameter1 inch / 6 inch / as the engineer specifiesso we pick the right bit
Thickness and materialblock boundary wall / concrete wall / concrete slabdecides wet or dry drilling
Floor and heightground / near the ceiling / on the roofso we bring a scaffold or ladder if needed
Marked photoone near photo, one distant photoreplaces a separate inspection visit in most cases

A list really does lower the price

The journey from Dammam to Abqaiq costs us roughly the same for a single hole as for a dozen. If you gather all your holes, or team up with a neighbour who has some too, that cost is split across more holes and each one’s share falls.

Water, drain and power entries in Abqaiq

Service entry holes are among the jobs we are asked for most in Abqaiq: a new water pipe from the meter to the tank, a drain rerouted to the connection point, or a power or telecom cable run to an annex or shop. These holes are usually small, but they go through the outside wall or the boundary wall, so the level and the seal need particular care if they are not to become a way in for water or insects.

The main water supply entry

The plumber decides the pipe diameter and its route from the meter to the ground or roof tank. We drill a little larger than the pipe’s outside diameter so there is room for a protective sleeve and sealant, and at a level that lets the pipe run straight without sharp bends. If the hole goes through a block boundary wall carried on columns, we place it between two columns after scanning.

Drain holes and the network connection

The common household drain pipe is about 110 mm outside, the size people call a 4 inch pipe, so we core it with a 5 inch class bit. Drain holes need a steady fall, so the plumber sets the entry and exit levels before we drill and we hold them to the millimetre. The pipework itself is covered under our plumbing works.

Power and telecom conduits

Power and telecom holes are the smallest and the most numerous. Put them on the same list even if they look trivial: forcing them through a reinforced concrete wall with an ordinary hand drill is hard work and breaks the edge of the hole, while the rig cuts them cleanly in a few minutes.

⚠ We do not drill near the meter or main cable without checking

Before any hole close to the water meter, the electrical panel or a buried cable route, we locate it by scanning, ask the owner, and isolate the nearby circuit if needed.

Restaurant and shop extractor holes in Abqaiq

An extractor hole for a restaurant or shop in Abqaiq is usually ordered during fit-out, before trading starts. Its diameter comes from the hood supplier or the commercial kitchen designer, based on the hood size and airflow, and it typically falls somewhere between 8 and 12 inches, drilled high on the back wall close to the ceiling.

Shop Extractor Hole in Abqaiq
A core rig fixed high on the back wall of a small Abqaiq restaurant during fit-out, drilling for the extractor duct
  • Protecting equipment: we cover stainless worktables, appliances and tiles with plastic, because grey slurry leaves marks that are hard to clean off.
  • Height: a hole near the ceiling needs a stable scaffold, and the rig is fixed to the wall rather than held by hand.
  • What is behind the wall: we confirm what lies on the other side, a rear lane, a neighbouring shop or a power panel, before the bit breaks through.
  • Rectangular duct: if the extract duct is a wide rectangle, saw cutting suits it better than coring.

Our advice to shop owners is to fix the hole position with the hood supplier before the tiles go on if possible. Drilling through a tiled wall is perfectly possible, but it needs more care at the edge.

Concrete core sampling in Abqaiq to test an older slab

Concrete core sampling in Abqaiq is a service we carry out when an engineer asks for it: the owner of an older house wants to add a floor or a rooftop annex, or a building shows cracks or corroded bars, and the engineer needs to know the real strength of the concrete rather than the figure on the drawing. Here we are not opening a hole for a pipe; we are extracting an intact cylinder of concrete for an accredited laboratory to test.

Concrete Core Sampling in Abqaiq
An upright core rig on the roof of an older Abqaiq house extracting numbered concrete samples to test the slab’s strength

Who decides the cores and how many?

The engineer running the assessment decides where the cores come from, how many and at what diameter; we carry it out. The widely used ACI 318 approach takes three cores for each strength result in question and treats the concrete as acceptable if the average of the three is at least 85% of the specified strength and no single core is below 75%. Interpreting those numbers, and deciding whether to build on the slab or strengthen it, stays with the engineer.

How we extract a test core

  1. 1
    Scan for rebar
    the core must not contain bars, so we map the steel and choose a spot between them.
  2. 2
    Diameter and length
    ASTM C42 calls for a core of at least about 94 mm diameter, with a preferred length close to twice the diameter.
  3. 3
    Steady wet drilling
    a rig anchored on its stand, a water-cooled diamond bit and a gentle feed so the core does not crack.
  4. 4
    Numbering and bagging
    every core is numbered and its position recorded; drilling water is wiped off and the cores are sealed in bags as the standard’s procedure requires.
  5. 5
    Handover
    we pass the cores to the engineer or the laboratory the same day wherever possible.
  6. 6
    Closing the holes
    each core hole is filled with non-shrink repair mortar, and the waterproofing is restored if the core came from the roof.

Where our job ends

We do not issue a strength certificate or rule on whether the slab is fit for use. We extract the core properly and hand it over; the laboratory tests it and the engineer decides. Core testing complements the rebound-hammer survey explained on our renovation contractor in Abqaiq page: the hammer reads surface hardness, while a core gives the strength of the concrete itself.

Test cores are priced once we know their number, diameter and location, so send us the engineer’s request or a photo of it to 0547879578 on WhatsApp, and an estimated cost comes back to you.

Concrete coring in Abqaiq: how the diamond rig works

Concrete coring in Abqaiq means a hollow bit with diamond segments on its rim spinning through the material, cutting a thin ring and lifting out a complete concrete core. There is no hammering and no breaking; the hole comes out at an exact diameter with a smooth edge. That is very different from knocking a hole through with a chisel and hammer, which leaves a ragged opening, shakes the wall and needs repair afterwards.

Diamond coringBreaking by hand
Hole shaperound, exact diameterirregular and bigger than needed
Effect on the wallrotation without impactvibration and repeated blows
Dustlittle, because drilling is wetheavy
Afterwardsseal around the pipe onlyrepair the broken edges

Wet or dry drilling in Abqaiq?

Most of our Abqaiq holes are drilled wet, because water cools the diamond bit and traps the fine silica dust that cutting concrete releases, which is harmful to breathe. A wet vacuum picks the run-off up continuously, keeping floors and façades clean. Dry drilling is reserved for block walls and light partitions in finished homes, where water would harm gypsum or paint, and we use it with a dust extractor connected to the machine. Test cores are always drilled wet on a fixed stand with a gentle feed, so the cylinder comes out with sound ends and no cracks to confuse the laboratory. Before we leave, we show you every core with its number and the position recorded on the sheet.

Drilling holes in walls in Abqaiq

Drilling holes in walls in Abqaiq is governed by the wall material before anything else. Reinforced concrete calls for an anchored rig and water cooling. Block accepts dry drilling with a vacuum when we are worried about paint or gypsum inside. On a boundary wall we choose a position between the columns. In tiled shops we start with a bit suited to the tile so the edge does not chip, then carry on into the wall.

Drilling inside an occupied home in Abqaiq

Many Abqaiq holes are in homes where the family carries on living during the work, so we organise the drilling so the house does not turn into a site. We clear a small area around the hole, lay plastic over the floor and nearby furniture, and clamp a slurry collar round the bit, its hose feeding a wet vacuum, so nothing spreads. If the hole comes out into another room or onto the street, someone watches the far side so the core does not fall on anything. When we finish we lift the plastic and wipe down, leaving nothing behind but the hole itself.

Large rectangular openings, such as a new door, a window or a display opening in a shopfront, are cutting jobs rather than coring. You will find them explained on concrete cutting in Abqaiq.

AC core holes in Abqaiq

An AC core hole in Abqaiq is small in diameter but needs an accurate slope. The reference we use is a well-known manufacturer’s installation manual which gives a 65 mm bore dipping towards the exterior, letting condensate escape. We drill to the slope your AC technician sets, avoid columns and beams, and ease the bit out on the outside so the plaster does not drop away. In shops that need central air, we drill the duct holes at the diameters the technician specifies.

Slab and ceiling coring in Abqaiq

Slab coring in Abqaiq serves drains and supply pipes passing from one floor to the next, and for extractor and ventilation outlets on the roof. We usually drill from above, and a catch tray below takes the falling core and the run-off. Wherever a pipe exits through the roof, a collar must be bonded into the membrane around it, which we can agree as part of our waterproofing service when needed.

⚠ An older slab goes to the engineer first

If the slab is old and shows cracks, rusting bars or spalling cover, we do not recommend coring a large hole in it before an engineer has seen it. The engineer may ask for test cores before any alteration, as described above.

Kitchen and bathroom core holes in Abqaiq

Kitchen and bathroom core holes in Abqaiq homes cover the kitchen hood outlet, the bathroom fan and the drains for basins and floor gullies. Household bathroom fans are generally made for 100 mm ducting and kitchen hoods often run on 150 mm ducting, but the appliance manual is the final reference. For a gas pipe we drill only the hole; the gas line itself is laid and connected by a licensed gas fitter.

Core hole sizes in Abqaiq

Core hole sizes in Abqaiq are set by what passes through them. Here is a short table of the most common requests in town:

RequestApproximate classFrom
Power or telecom cableup to 2 inchSAR 90
Water supply pipe entrypipe size plus sleeveSAR 90
Split ACabout 65 mmSAR 90
4 inch drain or home kitchen hoodfive to six inchSAR 140
Restaurant hood or medium ducteight inchSAR 230
Large restaurant hood or ventilation ductbetween 10 and 12 inchSAR 320
Concrete test coresas the engineer specifiesafter inspection

A reminder: these opening prices firm up only after a site visit; thickness, reinforcement, working height and hole count all shift them.

Rebar scanning before coring in Abqaiq

Rebar scanning before coring in Abqaiq is a fixed step for every hole and every test core. For ordinary holes we scan to avoid the main bars and buried cables; for test cores we scan because a bar inside the core spoils the test result. We draw the steel pattern on the wall or slab in front of you and show you where we will drill before we start.

  • ✓Columns: never cored.
  • ✓Beams: cored only on an engineer’s written decision.
  • ✓Slabs with tensioned cables: no drilling before a radar scan.
  • ✓Exposed or rusting steel: we stop and tell you, as it may need assessing before we continue.

Core drilling prices in Abqaiq

Core drilling prices in Abqaiq begin at the same figures as in Dammam, plus a travel element inside the quote. That element has no fixed rate, because its share of each hole shrinks as the list grows.

HoleFrom
Up to about 100 mm (AC line, cables)SAR 90
5 or 6 inchSAR 140
8 inchSAR 230
10, 11 or 12 inchSAR 320
Above 12 inch, or concrete test coresset after inspection; send the photos or the engineer’s request on WhatsApp for an estimate

Important: nothing in this table is final before we inspect and you agree; the quote you receive already carries the travel.

Why does each hole cost less as the list gets longer?

Because most of the cost of working in a town away from our base is the trip itself and preparing the kit, not the minutes spent drilling. If the trip is for one hole, that hole carries the whole journey; if it is for ten, the ten share it. So we encourage you to add any postponed holes and to ask neighbours or nearby shop owners whether they need anything on the same date. General prices are on our prices page.

After drilling in Abqaiq: sealing holes and closing spares

Pulling the core out is not the end of the job. The gap left between the pipe and the side of the hole must be filled, or rainwater gets into the outside wall, drain smells escape, or insects come through the boundary wall. We agree with you before the date exactly how much of this sealing our work includes, so nothing is left hanging between our team and the plumber.

■ Water and power entries

a protective sleeve around the pipe, then a flexible sealant on both faces.

■ Roof holes

a sealing collar tied into the roof waterproofing around every pipe.

■ Extractor holes

sealing around the duct on the outside and a cowl to keep the rain out.

■ Test core holes

non-shrink repair mortar filling the hole completely, with waterproofing restored above it.

If the plumber or technician changes their mind after drilling and a hole is left unused, do not leave it open. Tell us during the same visit and we will close it with a suitable mortar, because closing it later means a separate trip.

Mistakes we often see when ordering core holes in Abqaiq

  • Ordering the hole before the diameter is known: the technician then arrives with a bigger pipe and we come back to enlarge the hole or drill another.
  • Splitting the job across several visits: one hole today and another next week, each trip carrying its own travel cost.
  • Tiling before drilling: then drilling through the tiles, which is possible but slower and more likely to chip the edge.
  • Coring a damaged slab without an engineer: especially when the plan is to build on it; it should be assessed first, possibly with test cores.
  • Leaving the gap around the pipe unsealed: so seepage or damp appears after the first rain.

Core drilling and concrete cutting in Abqaiq

Core drilling and concrete cutting often meet in a shop fit-out: a core for the hood, a cut for a display opening in the front, and small holes for power. Coring is for round holes; the diamond saw is for rectangular openings, doors, windows and square slab openings. If your list includes both, tell us from the start and both sets of equipment travel together. More detail: concrete cutting in Abqaiq and our concrete cutting service.

Core drilling contractor in Abqaiq: signs of serious work

  • ✓Asks for the list and photos before the date: rather than just “we will come and see”.
  • ✓Scans for rebar and shows you the pattern: before drilling begins.
  • ✓Drills on a stand-mounted rig: for reinforced walls, large holes and test cores.
  • ✓States what the price covers: drilling only, or sealing and closing as well.
  • ✓Knows the limits: does not overrule the engineer on a beam or a damaged slab, and does not claim to issue a lab report.

Be wary of offers of “laser coring”; drilling concrete is done with a diamond bit, and a laser is only a levelling and marking tool.

How to order core drilling in Abqaiq

  1. 1
    Write the hole list
    using the table at the top of this page: location, purpose, diameter, thickness and floor.
  2. 2
    Attach photos and the engineer’s request if any
    one near and one distant photo of each spot, plus the engineer’s sheet if test cores are needed.
  3. 3
    Message 0547879578 on WhatsApp
    include the map pin and two or three dates that work for you.
  4. 4
    Get the estimate and a date
    travel included; we may suggest a day that groups other Abqaiq work.
  5. 5
    Prepare the site
    power, a water source, covering what is needed in the shop, and someone to open up.
  6. 6
    Handover
    check every hole, receive the numbered cores if any, and we close whatever was agreed.

Is your Abqaiq hole list ready?

Share it along with pictures and a pin; we will arrange a single trip that completes all holes and cores.

Why Aemar Al-Maryam in Abqaiq?

■ One visit, one complete list

We arrive ready for every hole on the list, so trips are not repeated.

■ Test cores done properly

Scanning, numbering, bagging and handover, with the core holes filled afterwards.

■ Care in shops

Stainless, tiles and equipment protected from water and slurry.

■ Published starting prices

And you know the travel cost before the date.

The projects gallery shows photos of work we have carried out, and our core drilling service page covers the service in full.

Abqaiq and around: where we reach

We serve Abqaiq and its surroundings by appointment and group nearby requests into one trip. Send your exact location pin; that is all we need to plan the route. All our services are listed on the Abqaiq area page. If you also have work in Al-Ahsa, see core drilling in Al-Ahsa, and for the full guide to hole types and cases, read core drilling in Dammam.

Tags

#core_drilling_in_Abqaiq#core_drilling_Abqaiq#concrete_coring_Abqaiq#diamond_core_drilling#drilling_holes_in_walls_Abqaiq#AC_core_hole_Abqaiq#slab_coring_Abqaiq#water_main_entry_hole#utility_pipe_entry#drain_pipe_core_hole#cable_duct_core_hole#restaurant_extractor_hole#shop_extractor_duct_hole#kitchen_and_bathroom_core_holes#concrete_core_sampling#concrete_test_cores#core_testing_old_slab#core_hole_sizes#rebar_scanning_before_coring#core_drilling_prices_Abqaiq#core_drilling_contractor_Abqaiq#core_drilling_and_concrete_cutting#core_drilling_Al-Ahsa#Aemar_Al-Maryam

Request an inspection: Core drilling

Fill in the details and WhatsApp opens with your request so we can arrange the inspection.

Prices are estimates until inspection and agreement; the final price is written in the offer after the site visit.

Your request is saved first, then WhatsApp opens with a ready message. Nothing is sent until you press send in WhatsApp.

FAQ

What does core drilling cost in Abqaiq?

A hole the size of an AC line starts at SAR 90. Holes of five or six inches start at SAR 140, an eight-inch hole at SAR 230, and ten to twelve inches at SAR 320. Treat these as estimates pending our inspection; the drive from Dammam appears in the quote, divided among the holes you book.

Why do you ask for the full hole list before coming to Abqaiq?

Because we come from Dammam on a scheduled visit. A complete list tells us which bits to load for every hole, and it spreads the travel cost over more holes so each one carries a smaller share.

Can you drill the entry for the main water pipe through a boundary wall?

Yes. We drill to the diameter the plumber sets plus a little room for a sleeve and sealant, at a level that suits the pipe run from the meter to the tank, and the gap is then sealed so water and insects cannot get in.

Can you drill an extractor hole for a restaurant or shop in Abqaiq?

Yes, at the diameter the hood supplier or kitchen designer specifies. We cover stainless worktables and equipment with plastic and vacuum the water as we drill so tiles and equipment are not marked.

What is a concrete test core?

A cylinder of concrete we cut from a slab, column or footing with a diamond core bit and hand to an accredited laboratory, which tests its compressive strength. Engineers usually ask for cores when assessing an older building or checking doubtful concrete.

Who decides how many test cores to take and where?

The engineer running the assessment sets the number, positions and diameter; we drill, number, bag and hand the cores over. The widely used ACI 318 approach takes three cores for each strength result that is in question.

Do you issue the concrete strength report?

No. The laboratory issues the report and the engineer interprets it and decides. Our part is to extract clean cores clear of rebar, deliver them in a testable state and fill the holes afterwards.

Does taking test cores weaken the slab?

Cores are taken where the engineer chooses, away from critical zones, and after scanning so the bars are not cut. The holes are then filled with non-shrink repair mortar and the waterproofing is patched if they are on the roof.

How wide is the hole for a split AC in Abqaiq?

We work from one major brand's installation manual, which gives 65 mm and asks for the hole to dip towards the exterior. We drill whatever your unit's manual or AC technician asks for.

Can you core the slab of an older house in Abqaiq?

Yes, after scanning and a look at the slab's condition. If there are cracks or corroded bars we recommend an engineer sees it first, and they may ask for test cores before any alteration.

What should go on my hole list?

For each hole: where it is, what will pass through, the diameter if known, the wall or slab thickness and the floor, with a marked photo. Finish with a map pin and your preferred dates.

Do you also work around Abqaiq?

Yes, and we can combine your job with other work in the area on one trip. Send your exact location and we will tell you the next available date.

Related services

We work in Abqaiq and every Eastern Province city:

ع