An asphalt contractor in Khafji paves a building car park or villa yard on a properly compacted base, fixes settlement at its root rather than at the surface, and marks out the bays, accessible ones included. Owners turn to Aemar Al-Maryam General Contracting for exactly that: apartment buildings, shops and villas across Khafji get new car park paving, repair of sunken asphalt by recompacting the base course, pothole patching, crack sealing and milling, and line marking to finish. Rates start at SAR 37 per square metre when there is a sound base under the site and we lay 5 cm, and at SAR 74 for a full build from natural ground. Prices firm up only after a site visit and a signed scope, and the drive up from Dammam is priced on that same visit. Ring or WhatsApp 0547879578.
Up near the Kuwaiti border on the Gulf coast, Khafji lies roughly 298 km from Dammam and 226 km from Jubail, so we never set off without first understanding the site from your photos. Most of what reaches us from Khafji is not new paving on bare ground. It is building car parks paved years ago that now show dips at the entrances and above service lines, and owners who want their bays re-marked once the repairs are done. That is why this page opens with settlement.
The essentials for car park owners in Khafji
- What we do here: car parks for apartment buildings, shops and offices, villa yards and house fronts, settlement, pothole and crack repairs, and line marking.
- Settlement: we open the area, trace the water or weak compaction behind it, and rebuild the base in layers before any asphalt.
- Accessible bays: wheelchair symbol on the surface, slope no steeper than 2%, a hatched side aisle, and a raised sign.
- Starting rates: SAR 37 a metre for 5 cm on a firm existing base, SAR 41 for 7 cm, SAR 74 starting from natural ground, 55 for polymer-modified, 46 for cold patching, 38 for milling and relaying. Provisional until we visit and agree.
- Travel: about 298 km from Dammam, costed at inspection; bundling several jobs into one visit brings it down.
- Order now: photos of the car park and the dips, plus dimensions, on WhatsApp 0547879578.
Asphalt settlement repair in Khafji: why it sinks and how we recompact the base
Repairing sunken asphalt in Khafji starts with a single question: what made the layers under the asphalt weaken? Asphalt is a flexible layer that follows whatever supports it. When the base drops, the surface drops with it; water then collects in the dip, seeps through its edges into the base and weakens it further, and the hole grows every winter. That is why spreading a new layer over the dip only hides the problem for a few months.
When we open a sunken area in a building car park or villa yard, we usually find one of these causes:
■ Water from below
A leaking pipe, a poorly sealed inspection chamber, or a blocked drain that lets water stand and soak into the base.
■ An old trench
A utility line laid and then backfilled in one go without layer-by-layer compaction, which settles over time.
■ A thin or loose base
Asphalt laid on sand or a few centimetres of stone, which could not carry the car wheels.
■ Weak ground
Soft, salty or damp soil that was never replaced before construction and weakens each time it gets wet.
Our repair method is the same whatever the cause, though the details change:
- 1Mark the limits
We draw a rectangle around the dip that reaches out to sound asphalt and saw-cut it with straight edges and square corners. - 2Open and inspect
We lift the asphalt and dig out wet or loose base material until we reach firm ground, looking for the water source as we go. - 3Remove the cause
A leak is repaired first by a plumber in Khafji, a blocked drain is cleared, weak soil is replaced. - 4Rebuild the base
Fresh crushed stone goes back in, each lift kept to 15 cm or less after rolling; each lift is dampened and compacted with a vibratory plate until it is fully tight. - 5Spray and pave
Prime goes on the new base and is left to cure, tack goes on the cut faces of the old asphalt, then hot mix is laid and rolled flush with the surrounding surface.

⚠ A patch over settlement comes back
If someone offers to spread a “levelling layer” over the dip without opening it, the water that caused the settlement is still down there. The yard will look level for a few weeks, then the patch will drop and the asphalt around it will crack.
Pothole patching in Khafji: temporary or permanent?
A small pothole whose damage has not reached the base is patched with hot mix after its edges are cut and tack is sprayed, and that patch is permanent. Cold mix is what we use when a hole is dangerous to cars and cannot wait for the visit; it fills the gap for weeks or months until the proper repair, and starts at SAR 46 per m². Potholes that keep reopening in the same spot are a sign of settlement beneath, and the cure is the method above.
Sealing cracks and milling a worn surface
A longitudinal or transverse crack in a building car park is a doorway for water into the base. We clean it, blow it out with compressed air and fill it with hot rubberised sealant before it becomes a pothole. When the whole car park surface is worn and its stones are showing but the base is still firm, we mill 3 to 5 cm, spray tack and lay a new layer at the same level, so the car park does not rise above the entrance thresholds and electrical room doors. This work starts at SAR 38 per m².
Building car park paving in Khafji
An apartment building car park in Khafji serves dozens of cars a day, entering, leaving and turning in the same places, so we build it on a sound base and pay attention to three spots that fail first: the entrance from the street, the turns where wheels twist, and the edges against kerbs and building walls.
- ✓Entrances: the base is strengthened there, because they take the load first and show damage first.
- ✓Falls: at least 1.5%, toward a drain or the street, away from the building entrances and service rooms.
- ✓Inspection chambers and drains: covers are raised to the new asphalt level and the surrounds are tightly compacted, since they are a classic settlement point.
- ✓Edges: compacted with a small tamper, with tack sprayed on the kerb face and the adjoining wall.
- ✓Phased work: we agree sections with the building management and close them in turn so residents never lose the whole car park.
If the car park has old concrete slabs or steel bases that must come out before paving, we arrange it with our demolition team in Khafji, and if concrete has to be cut to run a new drain we have concrete cutting in Khafji.
How many days does a building car park in Khafji take?
It depends on the car park’s condition. If the old base is sound and we only need to mill or lay a new layer, paving a medium car park takes one or two working days in phases, with marking afterwards once the surface has cooled. If there is settlement, or we are building from natural ground, add days for digging, levelling and laying and compacting the base in lifts, then at least a full day while the prime cures before the mix arrives. Because Khafji is far from our base, we plan the schedule so the crew is never idle: settlement and base work first, saw-cutting patch edges and adjusting chamber covers on the prime-curing day, then paving and marking. You get this schedule in writing after the inspection, so you can tell residents in advance which sections will close each day.
Shop and office car parks in Khafji
A shop car park differs from a residential one in that cars do not stay long; they change all day, so the surface wears faster at the entrances and turns. We work when customers are few, keep the frontage open as far as possible, and send water away from the doors. At offices and private clinics, we also take care of the walking route from the car park to the entrance so water does not cross it.
Asphalt in front of houses and villa yards in Khafji
Asphalt in front of a house in Khafji stays inside the property up to the street line, and aims for a clean, dust-free garage approach sitting slightly above rainwater. A small yard is laid by hand and compacted with a small roller or plate, and its price per square metre is higher than a large car park because equipment and crew costs do not shrink with the area. If the yard has an old dip, we treat it the same way as described above before paving the rest.
Line marking and accessible bays in Khafji
Car park marking in Khafji is the step that turns paved ground into an organised car park: lines for each bay, entry and exit arrows, pedestrian routes, and accessible bays close to the entrance. We mark to the building’s approved layout and do not invent dimensions of our own.

Accessible bays come with requirements we follow: the wheelchair symbol clearly painted on the surface, a slope across the bay and its side aisle within about 2% in both directions so a wheelchair user can move safely, and a raised sign the driver can see. That is why we set the falls for this area while preparing the base, not after paving.
In older car parks where we repair settlement or mill the surface, the old lines disappear wholly or partly, so we re-mark the entire car park rather than just the repaired part; otherwise it looks patched, with crisp new lines beside faded ones. If the old layout was impractical, such as a tight turn or a bay blocking an entrance, this is the moment to review it with the building management, within the approved plan, before any paint goes down.
| Marking element | What we do | Note |
|---|---|---|
| Bay lines | White paint in sharp, straight lines | To the approved layout |
| Accessible bays | Coloured base, stencilled wheelchair symbol, hatched side aisle | Slope within 2%, raised sign |
| Arrows and directions | Stencilled arrows at entrances and turns | Prevents crossing and confusion |
| Pedestrian routes | Clear crossing lines to the entrance | Kept away from water paths |
| Paint type | Cold paint at lower cost, or longer-lasting thermoplastic | Thermoplastic for busy car parks |
| Price | By number of bays and length of lines | At inspection |
Asphalt company in Khafji: what our work covers, from the ground to the last line
An asphalt company in Khafji should handle everything one site needs, so you are not coordinating several contractors: ground preparation, base course, sprays, paving, compaction, checks, then marking. This is what every job with us includes:
- ✓An inspection that measures the area and checks the soil, levels and water direction.
- ✓Removal and replacement of weak or salty soil where needed.
- ✓A base of graded crushed stone, about 15 cm for cars and about 23 cm where trucks enter.
- ✓MC prime on new base, and RC tack on old asphalt and edges.
- ✓Plant-made hot mix, temperature-checked, laid and rolled before it cools.
- ✓A straightedge check for evenness and a water test of the falls before handover.
- ✓Bay lines, accessible bays and arrows.
If you are refurbishing the whole building, the paving can be part of a renovation in Khafji project, provided it comes at the end, after the heavy equipment has left.
Coastal ground in Khafji: what matters for asphalt
Sabkha, a salt-crusted coastal flat, appears intermittently along the western shore of the Gulf. It looks hard when dry, but its salts dissolve when it gets wet and it loses part of its bearing capacity; university researchers in Dhahran ran a plate load test on coastal sabkha in the province and found that bearing capacity fell by around 30% once water had leached out the salts. We are not saying every plot in Khafji is sabkha, but the city’s position on the sea makes a ground check at inspection a step we never skip, especially on low sites or where water stands.
When we find weak, salty or damp soil, we choose one or a combination of three remedies: removing the weak layer and replacing it with suitable compacted material, laying a geotextile to stop the soil mixing into the base, and lifting the car park slightly to keep it clear of the moisture. We cost these on site, since the price follows how deep the weak layer runs.
Pavement layers and thicknesses in Khafji
The thickness you need depends on who will use the car park. This table summarises what we usually propose before the inspection; the final decision comes after it:
| Use | Base course (compacted) | Asphalt (compacted) |
|---|---|---|
| Villa yard and garage approach | About 15 cm | About 5–6 cm |
| Building or shop car park for cars | About 15 cm | About 5–6 cm, with strengthened entrances |
| Route for service trucks and tankers | About 23 cm | About 12–14 cm in two lifts |
| Settlement area after repair | New base in lifts up to the surrounding base level | Same as the surrounding asphalt |
We always remind owners to write thickness into the agreement as “after compaction”, because the mix shrinks by about a fifth to a quarter of its depth under the roller. Under the base, the natural soil is rolled to around 95% of the highest dry density it can reach; the stone base above it is rolled to 100%.
MC prime and RC tack in Khafji car parks
On a new car park we spray prime on the stone base and leave it a day or more to soak in and cure before paving. A settlement repair needs both: prime on the new base at the bottom of the excavation, and tack on the cut faces of the old asphalt so the patch fuses with its surroundings and water cannot get in along the joint. Tack is applied sparingly, roughly 0.25 L per m² at most, because too much makes the surface slippery and causes the bitumen to bleed through.
Asphalt in Khafji: what equipment do we bring?
Whatever you call it, asphalt, “zift” or paving, the job needs equipment matched to the site, and we choose it from the photos before the trip so we carry nothing unnecessary and lack nothing we need. A medium building car park usually calls for a small loader or grader to shape the base, a vibratory roller for the base, a vibratory plate for edges and around chambers, a water tanker to dampen the stone, a sprayer for prime and tack, a paver or hand-laying tools for tight spots, a steel-drum roller for finishing, a floor saw for patch edges, a thermometer for the mix and a long straightedge for evenness. For a small settlement repair in a villa yard, the saw, plate, sprayer and hand tools are enough.
Which mix suits your car park in Khafji?
For car parks and yards we use standard hot mix, which is enough for residents’ and visitors’ cars when the base is sound. On truck routes and tanker entrances we suggest polymer-modified asphalt, because ordinary mix ruts more readily under slow and parked trucks in an Eastern Province summer; it starts at SAR 55 per m². Cold mix is for temporary patching only. All our hot mix comes from an asphalt plant, and we check its temperature on arrival; if it arrives cold, it is not laid.
Are asphalt millings suitable for a car park in Khafji?
Millings are ground-up old asphalt, cheaper than new mix, and fine for farm roads and back yards where looks do not matter. They are rough and soften in the heat, though, so we do not suggest them for a building or shop car park that people use daily and care about, nor for a car park we will mark, because paint does not hold well on their coarse surface.
Asphalt price per square metre in Khafji
The asphalt price per square metre in Khafji starts at SAR 37 for a 5 cm layer over an existing sound base, the very starting rates we use in Dammam, plus travel, which is costed at the inspection. Treat them as provisional until the visit; they move with the car park’s size, the base beneath it, the number of settlement areas and the number of bays to mark:
| Item in Khafji | Per m² from | Where it is needed |
|---|---|---|
| 5 cm hot layer over a standing, sound base | SAR 37 | Building or shop car park, villa yard |
| 7 cm hot layer over a standing base | SAR 41 | Service truck route |
| Full build: levelling and compaction, base course, prime and 5 cm | SAR 74 | Ground never prepared before |
| Polymer-modified mix | SAR 55 | Tanker and truck entrances |
| Temporary cold patch | SAR 46 | A dangerous hole before the permanent repair |
| Milling 3–5 cm and a new layer | SAR 38 | Worn surface, firm base |
| Settlement repair with base recompaction | At inspection | Entrances and above services |
| Saw-cut hot patch that lasts | On site | Isolated potholes |
| Bay lines and accessible bays | At inspection | After paving |
| Replacing weak or salty soil | At inspection | Low and damp sites |
| Travel from Dammam | At inspection | All Khafji sites |
Travel to Khafji: why it is priced at inspection
A Khafji round trip is close to 600 km, carrying a roller, a vibratory plate, cutting gear, a water tanker and a crew, sometimes a paver too. Its real cost depends on the days of work and the equipment needed, so we do not put a number on it before seeing the site. Each extra job you fold into the same trip, such as settlement repair, paving and marking together, or an agreement with a neighbouring building, cuts the share of travel in every square metre.
Worked example: a 24 × 22.5 m building car park
For illustration: an apartment building car park of 24 × 22.5 = 540 square metres, with an old base that is mostly sound, needing a new 5 cm asphalt layer, one settlement area beside an inspection chamber, and 18 bays to mark:
| Item | Calculation | Approximate result |
|---|---|---|
| Car park area | 24 × 22.5 | 540 m² |
| Asphalt over the standing base | 540 × 37 | SAR 19,980 |
| Mix quantity (5 cm, about 2.3 t per m³) | 540 × 0.05 × 2.3 | Roughly 62 t |
| Settlement repair at the inspection chamber | By its area and depth | At inspection |
| Marking 18 bays including one accessible bay | By line length and symbols | At inspection |
| Travel from Dammam | — | At inspection |
So the part we can calculate in advance here is about SAR 19,980, with the last three items added once we have seen them. If the inspection showed that the old base was weak across most of the car park, the calculation would switch to the full build: 540 × 74 = roughly SAR 39,960.
Handover checklist: what to check before you sign
- ✓Water: hose water onto the car park and watch where it runs; it must not stand in any dip, especially where settlement was repaired.
- ✓Evenness: a long straightedge laid on the surface shows no gap beyond a few millimetres.
- ✓The joint: patch edges are straight and tight, with no cracks and no step against the old asphalt.
- ✓Chamber covers: flush with the new asphalt, with tightly compacted surrounds.
- ✓Thickness: matches the agreed compacted figure, measured at the edges.
- ✓Marking: sharp lines, clear symbols, and the accessible bay where the plan puts it.
- ✓Cleanliness: no loose stones, no roller marks, and the site cleared of debris.
Mistakes we keep finding in Khafji building car parks
We see these mistakes often when we are called to repair a car park paved years ago, and avoiding them from the start spares you doing the work twice:
- ✓Service trenches backfilled in one go: a water or power line is laid under the car park and backfilled with soil without layered compaction, and months later a dip appears exactly above it.
- ✓Chamber covers at the wrong level: a cover above the asphalt breaks the edge around it; one below it collects water.
- ✓Falls toward the building entrance: water running to the door seeps in at the threshold and under the asphalt at once.
- ✓Patch on patch: each dip covered with a new layer without opening it, until the car park is a jumble of levels.
- ✓Marking before the asphalt has cooled: paint on a hot surface does not hold and peels quickly.
- ✓An accessible bay on a slope: a symbol painted on tilted ground does not serve the people it is meant for.
- ✓Ignoring a known leak: a dripping pipe in one corner is enough to ruin the base in that corner within a season.
Public streets in Khafji are not our work
What we pave lies inside your property boundary: the building’s private car park, the villa yard, and the frontage strip that is part of your plot. The public street is the municipality’s responsibility to pave and maintain, cutting into it or paving beyond your line needs the municipality’s coordination office, and a utility connection trench is applied for by the utility company on Balady. A sunken patch or hole in the street outside? Call 940 or log it in Balady.
Reopening the car park, and keeping it level
Cars can go back on when the mat has cooled right through; unlike concrete, rolled hot mix is not watered or cured. We give the building management a time based on the day’s heat, and in the first summer days advise that trucks do not stand long in one spot. After that, simple care is enough: clear the drains before rain, seal any crack early, and report any water leak in the car park immediately, because a leak is the first step toward new settlement.
How to order an asphalt contractor in Khafji
WhatsApp these to 0547879578 for a first estimate and a visit date:
- ✓One overall photo of the car park from the entrance, plus close-ups of each dip or pothole with something that shows its depth.
- ✓Rough length and width, and the number of bays to mark.
- ✓Do service trucks or tankers use the car park?
- ✓Any known water leak or blocked drain on site?
- ✓A location pin in Khafji.
- 1Photos and sizes
By WhatsApp or a quick call to 0547879578. - 2First reading
From the photos we judge whether the problem is surface wear or settlement, and suggest a fix with an estimated cost. - 3Khafji visit
We check the soil, settlement areas and falls, and set the travel cost. - 4Clear agreement
Written items: repairs, compacted thicknesses, marking and schedule. - 5Work and handover
We repair, pave and mark, then check water flow and evenness with you before leaving.
Why Aemar Al-Maryam for your car park in Khafji
■ We fix the cause
We do not cover settlement with a fresh layer; we open it and repair what is underneath.
■ Everything in writing
Base and asphalt thickness after rolling, and which spray goes where, are stated in the contract.
■ Correct marking
Accessible bays with the right falls, symbols and signs, to the building’s plan.
■ A planned trip
Equipment and quantities are set from your photos before we drive north.
Finished jobs are shown under projects; indicative prices for everything else we do sit in the price list.
Khafji and its surroundings
Our Khafji jobs range from apartment car parks in the housing districts to shopfronts along the main streets and private villas. Coverage details are on the Khafji page. We also pave in Hafr Al-Batin to the west and Al-Ahsa to the south, and our full guide is the asphalt contractor in Dammam page.
Has your building car park sunk, or does it need new markings?
Photograph the car park and the dips and send them with the dimensions; we will tell you the fix and the estimated cost and arrange the Khafji visit.
Services linked to paving in Khafji
Tags


