Skip to content

Dammam and every Eastern Province city

العربية
Annexes and majlis

Annex & Majlis Builder in Saihat – Side-Setback Annexes, Panel Rooms & Majlis Lighting

Annex Builder in Saihat

As an annex builder in Saihat, we help homeowners gain space without moving: a two-room annex in the side setback, a light sandwich-panel room on the roof, or a guest majlis with lighting that has been thought through. Aemar Al-Maryam General Contracting treats Saihat exactly like Dammam, because the two are close, so we follow the site at every stage without waiting. Panel rooms start at SAR 125 a square metre, a block annex with a mid-range finish at SAR 1,200 and bare block structure at SAR 830, all indicative until we visit. Phone or WhatsApp: 0547879578.

Saihat homeowners ask us three things more than anything else. Can I build in the side setback? What is the fastest room I can put on the roof? How do I make the majlis look good at night? This page is built around those questions, with cost examples and price tables to start your budget from.

Saihat annexes in brief

  • Setback annexes: two rooms and a washroom in the side passage, once the engineering office confirms what the rules allow on your plot.
  • Rooftop rooms: sandwich panel on a steel base over the column lines, after an engineer’s check.
  • Majlis: block, with a two-level gypsum ceiling, hidden lighting and spotlights planned before plastering.
  • Prices start from: SAR 125/m² sandwich panel, SAR 185/m² cement-board wall, SAR 830/m² shell, SAR 1,200/m² standard finish and SAR 46/m² gypsum ceiling, estimates until inspection.
  • Proximity: Saihat is close to our Dammam base, so inspections and follow-up are quicker.

Annex Builder in Saihat, Close to Dammam

Being an annex contractor in Saihat means turning up at the moments that matter: before the footings are poured, when the roof steel is fixed, and before the gypsum is closed. Saihat sits roughly 14 km from Dammam, between Dammam on its southern side and Anak to the north. That short distance lets our engineer and supervisor visit at every stage without the work losing a day waiting for a visit.

■ Faster inspection

We book the inspection at the earliest time that suits you, without waiting to group other jobs in the area.

■ Every stage followed

Excavation sign-off, steel checked before pouring, services before plaster, and waterproofing before tiles.

■ Steady supply

Materials come from Dammam on a short run, so work never stops for one missing item.

Saihat’s districts vary, from older quarters with narrow streets to newer districts with wider plots, so we always start an inspection at the street and the entrance before the annex itself. The size of vehicle that can get in and where it can unload affect both the time and the cost.

Annex Building in Saihat’s Side Setback: A Two-Room Annex

Building an annex in the side setback in Saihat is possible in many cases, but it is settled on the plot plan, not by guesswork. The setback is the space left between the house and the plot boundary. The updated residential requirements, as reported, allow building in it within limits, and the engineering office checks them against your deed and your district’s rules. The most common request in this position is a two-room annex with a washroom, for a married son or for guests staying a few days.

What the Requirements Say About Setback Annexes

The points below come from press coverage of the housing ministry’s revised residential building rules. We list them so you understand the general picture; how they apply to your plot is for the engineering office to decide:

ItemAs reportedWhat it means for your annex
Ground annex and the houseThe annex may adjoin the ground floor or merge with itThe annex can lean against the side wall of the house
Detached annexSeparated from the house by no less than 2.1 mIf it does not adjoin the house, the setback must be wide enough for that gap
Neighbour sideWhatever abuts the neighbour stays at or below 4.5 m, wall includedUsually a single storey, with no room above it in that part
CoverageAt most 75% of a villa plot under the ground floor plus annexesThe remaining area may limit the annex length
Building in setbacksCapped as a share of the plot perimeterThe whole setback around the house cannot be closed

Source: local press reports of the updated residential requirements. The engineering office confirms the details for each plot.

Laying Out a Two-Room Annex in the Side Passage

A side setback is usually a long, narrow strip, so a good layout there is linear: a room at each end, the washroom in the middle or at the end nearest the drain line, and either an internal corridor or an outside door for each room. We make sure no windows open onto the neighbour’s house and that daylight comes from the house side or from high windows.

■ Two rooms, one door

An entrance from the courtyard into a small lobby that serves both rooms and the washroom. Good privacy, little corridor space.

■ Two rooms, two outside doors

Each room opens onto the courtyard, handy when one of them is a store or an office.

■ One room linked to the house

One room gets an internal door cut through from the house, the other stays independent for guests.

In a setback annex we deal with rainwater before anything else. The annex roof must fall away from the neighbour’s wall, and its drainage goes to the courtyard or to a drainage point inside the plot, never over the boundary wall. Where the engineer asks for it we leave a suitable gap between the annex wall and the boundary wall, and we detail the junction so moisture does not collect there.

Setback Annex Footings Beside the House Wall and Boundary Wall

A setback annex stands between two existing walls: the house on one side and the boundary wall on the other, each with a footing underneath that nobody can see. Digging next to an existing footing without a plan can expose it or loosen the soil beneath it. So the engineer designs the annex footings so they do not drop below the house footing right beside it, and may use eccentric or strip footings depending on the site. We dig in short stretches next to existing walls and never leave excavations open for long.

  • ●A joint between annex and house: where the annex adjoins the house we leave a movement joint set by the engineer and close it with a flexible sealant, so a slight settlement in one building does not pass into the other.
  • ●The boundary wall: we do not put the annex roof load on it unless it was designed for that, because a boundary wall is usually too weak to be a load-bearing wall.
  • ●Groundwater and salts: a blinding layer, generous cover to the steel, bitumen on everything buried, and a moisture barrier beneath the block.
  • ●Existing services: we locate drain, water and power lines in the passage before digging, since many houses run their services down the side setback.

When Is the Side Setback Not Suitable?

Not every setback suits a living annex. If the passage is so narrow that the room would be uncomfortably slim, if it holds a main inspection chamber or a meter that must stay accessible, or if it is the only route to the back of the house, the annex is better moved to the courtyard or the roof. We tell you that at the inspection, before you pay for a design that does not fit the place.

Cost Example: a Two-Room Annex 3.5 m Wide and 9 m Long

LevelCalculationApproximate cost
Block and concrete shell31.5 m² × SAR 830About SAR 26,145
Standard finish31.5 m² × SAR 1,200About SAR 37,800
Premium finish31.5 m² × SAR 1,670About SAR 52,605
Doorway sawn through from the houseSingle doorFrom SAR 140

Illustrative; the real annex width follows the setback width and the rules, and the washroom is priced at inspection.

Building a Room in a Saihat Courtyard

If the side setback is not wide enough, the front or back courtyard may take a separate room or a small annex. Footings deserve care here. In the Eastern Province groundwater sits close to the surface in many places and may carry salts, so we set footings on blinding, with full cover to the reinforcement, buried concrete is painted with bitumen, the walls start on a moisture barrier, and sulphate-resisting cement is used wherever the engineer asks for it.

Majlis Builder in Saihat

Building a majlis in Saihat is normally done in block with reinforced concrete, because a majlis is for long receptions and needs quiet and good heat and sound insulation. It then takes a standard or premium finish: render, paint and tiles, or a two-level gypsum ceiling, hidden lighting, wall cladding and porcelain. A majlis with a standard finish starts from SAR 1,200 per m², and with a premium finish from SAR 1,670.

An Outdoor Courtyard Majlis in Saihat

An outdoor courtyard majlis needs three decisions before design: an entrance guests reach straight from the gate, a washroom close to the drain line, and a west wall with fewer openings because the afternoon sun is what heats a majlis most. We recommend a shaded path from the gate to the majlis door, an outside basin at the entrance and a place set aside for shoes.

Majlis Finishing in Saihat: What Most Clients Choose

Majlis finishing starts at the floor and ends at the ceiling. The floor is a light porcelain that reflects the lighting and is easy to clean. The walls get a calm paint or wall cladding behind the main seating. The ceiling is a two-level gypsum design carrying the hidden lighting, and the windows get heavy curtains that cut the daytime heat. We make sure the seating, walls and lighting work together from the start, so we show you a simple concept before work begins and items do not change halfway through.

Building an Outdoor Diwaniya in Saihat

A diwaniya is a majlis for regular gatherings and needs more space, a dedicated coffee and hospitality corner and sometimes a large screen. We build it in block with good sound insulation so late-night voices do not reach the house and the neighbours, put its entrance on the gate side, and size its air conditioning for the usual number of guests rather than floor area alone.

Cement Board Majlis in Saihat: Does It Work?

Some clients ask for a whole majlis in cement board to save time. Structurally it can be done, with cement board on galvanised studs and rock wool, but a majlis used every day is quieter and sturdier in block. So we recommend cement board for temporary majlis or on roofs that cannot take block, and block for a permanent ground-floor majlis.

A Tiled-Roof or Prefab Majlis in Saihat

A pitched clay-tile roof gives a majlis a different character. Tile covering starts from SAR 74 per m² of roof, and the pitched frame is priced at inspection. A factory-made prefab majlis needs a level base, anchoring, services and a permit; we price it at inspection and compare it with a majlis built on site.

Majlis Lighting Design in Saihat

Majlis lighting design is what makes a majlis welcoming in the evening, and it is decided before plastering, not after finishing, because every light point needs a cable, a route and a switch. The best majlis lighting is not the brightest. It is lighting in layers that the owner can set to suit the occasion.

Majlis lighting in Saihat
A finished Saihat majlis with a two-level gypsum ceiling washing warm hidden light from its edges, and small spotlights picking out a calligraphy panel and a shelf.
LayerWhere it goesWhat it does
General hidden lightingIn the edges of the two-level gypsum ceilingSoft, even light that never dazzles
Accent spotlightsRecessed in the ceiling over panels and shelvesPicks out details and adds depth
Seating lightOver the seating areas or on the wall behind themEnough light for reading and serving
Entrance and facade lightingAt the door and along the path from the gateWelcomes guests and lights the way
  1. 1
    Draw the seating first: where the Arabic floor seating, the coffee corner and any screen go, because the lighting follows the furniture.
  2. 2
    Choose the light colour: warm white for a majlis, with one colour throughout so the room does not look scattered.
  3. 3
    Split the circuits: one for hidden lighting, one for spotlights and a third for the seating, with dimming where possible.
  4. 4
    Place the switches: at the main entrance, plus an extra switch at the far end of a long majlis.
  5. 5
    Wire before closing: cables run and tested before the gypsum is closed, with an access hatch for the hidden-lighting drivers.

A detail that makes the difference

Set the hidden lighting far enough back from the gypsum edge that a seated guest never sees the light source itself, only its glow reflected on the ceiling. Gypsum board ceilings start from SAR 46 per m².

Do not forget the power behind the lighting: sockets along the seating, a point for the coffee corner, a point for an electric incense burner, and a separate circuit for the majlis with its own breaker on the main board. We fix the AC positions and their drain routes on the same drawing as the lighting so the ceiling openings do not clash.

Rooftop Room Builder in Saihat: Sandwich Panel Rooms

A sandwich-panel rooftop room in Saihat is the fastest and lightest answer for anyone who wants a store, a workroom or an extra room on top of an existing house. Before any panel goes up, though, the engineer inspects the roof and fixes the column and beam lines the room’s base will sit on, because low weight does not remove the need for correct load paths and fixing against wind.

Sandwich panel room in Saihat
Assembling the walls of a sandwich-panel room on a Saihat house roof, the room sitting on a steel base frame fixed to the roof.
  1. 1
    The steel base: steel beams fixed to the roof over the column and beam lines, to the details the engineer sets.
  2. 2
    Wall panels: interlocking panels of two galvanised steel skins with an insulating core, set one by one and fixed to the base.
  3. 3
    Corners and joints: metal corner flashings on the edges and sealant in the joints to keep out rain and dust.
  4. 4
    A pitched roof: roof panels with a fall that sheds rain to the edge, and flashing where the roof meets the walls.
  5. 5
    Openings: a door and window in suitable frames, and an AC opening planned in advance.
  6. 6
    Interior finishing: flooring, electrics in conduit, and an inner gypsum board lining if you want it.

We choose the panel thickness and core by use. A 5 cm panel suits most rooftop rooms and starts from SAR 125 per m² supplied and installed. A rock-wool core behaves better in fire, while a foam core gives more thermal insulation per thickness, and we explain the difference before ordering.

Looking After a Sandwich Panel Room in Saihat’s Climate

A sandwich-panel room needs little maintenance, but it does need a regular look: check the sealant in joints and corners after every summer, clear dust and sand from the roof edge so it does not block rain runoff, make sure the fixing screws have not started to rust, and touch up any scratch in the outer coating before it spreads. That simple routine lengthens the life of the room in a humid coastal climate.

Sandwich Panel or Cement Board for a Saihat Rooftop Room?

CriterionSandwich panelCement board on a galvanised frame
Starts fromSAR 125 per m²SAR 185 per m² of wall
Installation speedFastestFast, a little slower
QuietnessLower, as a metal wallQuieter with rock wool
Inside feelMetallic unless linedA normal paintable wall
Best useStore, tool room, workroomBedroom, office or sitting room

A Gypsum Board Rooftop Room in Saihat

In a rooftop room gypsum board belongs on the inside only. It is an interior finishing panel that suffers from constant moisture and prolonged heat, and a house roof in Saihat, close to the sea, has both. So if you ask for “a gypsum board room”, we build it in sandwich panel or as a galvanised frame clad in cement board outside, then line it with gypsum board inside for a smooth finish.

If the room will be used for sleeping or long working hours, we recommend lining it inside with gypsum board over the panel, with the electrics in conduit between the layers. It then looks like an ordinary room inside while staying light outside.

A Glass Annex in Saihat

Glazed rooms begin at SAR 1,620 a square metre, with an aluminium frame, insulated safety glass and an insulated roof. It suits a winter sitting room in the courtyard better than an exposed roof, and we design it with the glazing facing north or east and a roof overhang shading it.

Insulation and Air Conditioning in Saihat Annexes

Saihat is a coastal city with high humidity for much of the year and fierce summer heat. So we treat insulation as part of the build: an integrated waterproofing and thermal system for the annex roof from SAR 46 per m², insulated block or an insulation layer on sun-facing walls, and tightly sealed window frames. In sandwich-panel rooms the insulation is in the core of the panel itself, and what matters is sealing the joints and corners so moisture cannot get in and condense inside.

  • ●AC: we place the outdoor unit so it does not drip onto the setback passage or the neighbour’s wall, and run the condensate line to a proper point.
  • ●Metal parts: sections, corners and screws are galvanised or rust-resistant, because humid, salty air speeds up corrosion.
  • ●Ventilation: a window or extractor fan in the washroom, and a high vent in storerooms.
  • ●Electrics: a separate annex circuit with its own breaker, earth-leakage protection in the washroom, and a meter capacity check before adding AC units.

Clauses We Write Into a Saihat Annex Agreement

  • ✓The annex position and sizes as approved by the engineering office, especially in the setback.
  • ✓The structural system: block, cement board with its thicknesses, or sandwich panel with its thickness and core type.
  • ✓The steel base details for rooftop rooms and how it is fixed.
  • ✓The lighting and electrical plan with the number of points, circuits and switches.
  • ✓The rainwater route and the AC condensate point.
  • ✓Payments tied to completed stages, debris removal, and flood tests on the roof and washroom before handover.

Room Building Costs in Saihat: 4×4, 4×5 and 5×6

The cost of building a room in Saihat differs a lot between a sandwich-panel room on the roof and a block room in the courtyard. These are illustrative examples from our starting prices, with the sandwich-panel rooms calculated with panel walls and roof at 2.8 m height:

SizeFull sandwich panel (walls and roof)Block, standard finishBlock, premium finish
4×4(44.8 + 16) × 125 = about SAR 7,600SAR 19,200SAR 26,720
4×5(50.4 + 20) × 125 = about SAR 8,800SAR 24,000SAR 33,400
5×6(61.6 + 30) × 125 = about SAR 11,450SAR 36,000SAR 50,100

Sandwich-panel figures are for the shell before the steel base, door, window, electrics and floor, which are added after inspection. Indicative only until we visit.

How Much Does a Majlis With Lighting Cost in Saihat?

An illustrative 5×7 m majlis (35 m²) comes to about SAR 42,000 with a standard finish and about SAR 58,450 with a premium finish that includes the gypsum ceiling and hidden lighting. Adding a gypsum ceiling to a standard finish costs about SAR 1,610 (35 × 46), and the light fittings themselves are priced by what you choose.

Annex Prices in Saihat (Starting From)

Annex prices in Saihat, listed from the lightest build to the heaviest; each is a minimum and indicative:

What we build in SaihatUnitMinimum
Rooftop room or store in 5 cm sandwich panelsquare metreSAR 125
Quiet rooftop room: cement-board walls packed with rock woolsquare metre of wallSAR 185
Setback annex or courtyard majlis in block, structure onlysquare metre of floorSAR 830
Two-room annex ready to live in, mid-range finishsquare metre of floorSAR 1,200
Majlis with a high-end finish, two-level ceiling and hidden lightingfloor m²SAR 1,670
Suspended gypsum ceiling for majlis or roomsm²SAR 46
Protecting the annex roof from water and heatm²SAR 46
Clay tiles for a sloping roofm² of roofSAR 74
Glazed courtyard sitting roomfloor m²SAR 1,620
Diamond-sawn doorway from the house into the annexper doorSAR 140
Steel base for a rooftop room, washroom, block rooftop room, prefab majlis—Set during the visit

No figure here is final before the inspection and agreement: area, height, finish and where the annex goes, in the setback, the courtyard or on the roof, all change the sums.

The quickest route to a price

Photograph the side setback from both ends, or the roof from a wide angle, and send the photos with the passage width and length on WhatsApp.

Annex Permits in Saihat

For a Saihat house that already has a permit, an annex is added by amending it. Balady files this under its “Adding and Modifying Building Components” heading, the engineering office draws and submits the plans, the stated processing window is a day to ten days, and the fee is calculated on the platform. Setback annexes in particular need the office to check the permitted distances and heights on the neighbour side before any design. An existing annex without a matching permit goes through the “rectify existing building status” service.

  • ●Rooftop annexes, according to the reports: a ceiling of 70% of the floor area underneath, with a 1.5 m step-in along the street side.
  • ●No building in the minimum neighbour-side setback on the first floor and upper annex, as reported.
  • ●An extra parking space inside the plot if the upper annex is used as an independent unit.

What the Engineering Office Usually Asks For

Requirements vary between offices, but most ask for the plot deed, the existing building permit and site photos. The office then prepares architectural, structural and electrical drawings for the annex, plus an engineering statement that the new annex will not compromise the house it joins. The more of the original house drawings you have, the faster this goes, so look for them before you contact the office. We coordinate with the office you choose and give it the site measurements and photos it needs.

How Long Does an Annex Take in Saihat?

WorkApproximate time
Balady permit1 to 10 days once the drawings are complete
Sandwich-panel rooftop room shellA few days once the base is fixed
Two-room block annex to handover3 to 8 weeks depending on finish
Gypsum ceiling and hidden lighting for a majlisDays within the finishing stage

Times are approximate and are fixed after inspection.

Common Mistakes in Saihat Setback Annexes

MistakeResultInstead
Building in the setback without the engineering officeA violation that may need changes or removalCheck distances and heights before design
A roof sloping towards the neighbour’s wallRainwater at the neighbour’s and damp in the wallFall towards the courtyard and drainage inside the plot
Windows overlooking the neighbourComplaints and lost privacy on both sidesHigh windows or windows on the house side
A panel room on the roof with no base on the columnsLoad in the wrong place and weakness in windA steel base over the column lines
Lighting decided after the gypsum is closedOpening parts of the ceiling or visible cablesA lighting plan before plastering

Building Contractor in Saihat: What We Handle

From the first sketch to the keys, a Saihat annex or majlis is ours to deliver: footings, structure and roof, protection against water and heat, power, plumbing and AC, then everything from render through gypsum to the lights. If an old canopy or room in the setback has to go before building, see demolition contractor in Saihat. Sawing a doorway through to the annex is explained under concrete cutting in Saihat, and refreshing an existing annex in renovation contractor in Saihat.

How to Order an Annex or Majlis in Saihat

  1. 1
    Photograph the space: the side setback from both ends, the roof from a wide angle, or the courtyard from the gate.
  2. 2
    Send measurements: the passage width and length, the roof size, or the house plan if you have it.
  3. 3
    Say what it is for: two rooms to live in, a rooftop room for storage or work, or a guest majlis.
  4. 4
    Mention lighting for a majlis: do you want hidden lighting and spotlights? A photo of a majlis you liked is enough.
  5. 5
    Inspection: we visit you in Saihat at the earliest time, and propose the system, layout and price.
  6. 6
    Permit, then work: we coordinate with the engineering office, then start and follow the job stage by stage.

Why Aemar Al-Maryam in Saihat?

■ Very close

The short distance from Dammam means real follow-up at every stage.

■ Setbacks done properly

We do not build in a setback until the engineering office has checked distances and heights.

■ Panel rooms fixed right

A steel base over the column lines, and sealed joints and roof.

■ Majlis with planned lighting

A layered lighting plan approved before plastering.

Saihat Districts We Serve

We serve Saihat’s older and newer districts, including:

Al KhaleejAl KawtharAl DeerahAl NoorAl DanahAl FayhaGhirnatahQurtubahAl GhadeerAl ZuhoorAl SalamAl NaqahAl KhasabAl Nimr

Nearby, we also cover stone-faced courtyard majlis in Qatif and garden majlis and rooftop rooms in Dhahran, while our Dammam annex and majlis guide explains every annex type. Local services are collected on our Saihat page.

Your Saihat annex is closer than you think

Photos of the setback, roof or courtyard plus a few measurements let us come back with a first layout and a rough cost; then we fix a day to visit.

Tags

#annex_builder_in_Saihat#annex_builder_Saihat#annex_and_majlis_builder_Saihat#annex_contractor_Saihat#annex_construction_Saihat#majlis_builder_Saihat#outdoor_majlis_Saihat#side_setback_annex#two-room_annex_with_bathroom#building_a_room_in_the_setback#courtyard_room_Saihat#sandwich_panel_rooms_Saihat#sandwich_panel_rooftop_room#rooftop_room_Saihat#gypsum_board_rooftop_room#cement_board_majlis#majlis_lighting#hidden_majlis_lighting#two-level_gypsum_ceiling#diwaniya_Saihat#glass_annex_Saihat#4x4_room_cost_Saihat#sandwich_panel_room_cost#annex_prices_Saihat#Balady_annex_permit#building_contractor_Saihat#Al_Khaleej_Saihat#Al_Kawthar_Saihat#Al_Noor_Saihat#Aemar_Al-Maryam

Request an inspection: Annexes and majlis

Fill in the details and WhatsApp opens with your request so we can arrange the inspection.

Prices are estimates until inspection and agreement; the final price is written in the offer after the site visit.

Your request is saved first, then WhatsApp opens with a ready message. Nothing is sent until you press send in WhatsApp.

FAQ

Where do annex prices start in Saihat?

Bare block structure starts at SAR 830 a square metre, a mid-range finished annex at SAR 1,200 and a high-end one at SAR 1,670, while sandwich panel rooms begin at SAR 125 a square metre of panel. All are indicative until the site visit.

Is building an annex in my side setback allowed?

Press coverage of the revised residential rules says a ground annex can be built against the house or, if separate, keep a 2.1 m gap, and that anything next to the neighbour stays at or below 4.5 m with the wall. Your engineering office checks the plot before anything is designed.

What does a two-room setback annex cost in Saihat?

Take an annex 3.5 m wide and 9 m long (31.5 m²): about SAR 26,145 as bare structure, around SAR 37,800 with a mid-range finish and roughly SAR 52,605 high-end. The true size depends on how wide the setback is and what the rules permit.

What does a 4×4 sandwich-panel rooftop room cost?

At 2.8 m tall, the walls come to 44.8 m² and the roof to 16 m², so 60.8 m² of panel at SAR 125, roughly SAR 7,600 for the structure. The door, window, wiring and floor are priced on top.

Does a sandwich-panel rooftop room need an engineer's check?

Yes. It is lighter than block, but it sits on a steel base that must bear on the column and beam lines, and the engineer sets the fixing details and wind resistance. Low weight does not remove the need for a check.

Sandwich panel or cement board for a rooftop room?

Sandwich panel is the fastest to install, insulated by nature, and starts from SAR 125 per m². Cement board on a galvanised frame with rock wool is quieter and feels like a normal wall, starting from SAR 185 per m² of wall. The use decides.

How should majlis lighting be designed?

In layers: general hidden lighting in the edges of the gypsum ceiling, small spotlights picking out panels and shelves, and comfortable light over the seating, each on its own switch or circuit. The wiring is planned before plastering and closing the gypsum.

What light colour suits a majlis?

Warm white is the most comfortable for long gatherings; cool white suits work spaces more than a majlis. Hidden lighting is best made dimmable so it suits both receptions and late evenings.

Will you build a gypsum board room on a Saihat roof?

We never let gypsum face the weather. Outside goes sandwich panel, or cement board over galvanised studs; gypsum only lines the inside, because damp sea air and long heat ruin it.

Do I need a permit to build an annex in Saihat?

Yes. Your engineering office files an amendment to the house permit on Balady, and the platform aims to turn it round in a maximum of ten days. If an annex was put up earlier without approval, it is regularised through the separate status-correction service.

Can a door be opened from the house into a setback annex?

Yes, by sawing the wall with a diamond blade instead of breaking it, once the engineer has confirmed what the wall does. Sawing a door opening starts at SAR 140, and the edges come out straight and ready for the frame.

How long does a two-room annex take in Saihat?

In block, a two-room annex generally needs three to eight weeks until handover depending on the finish, whereas a panel rooftop room has its structure up within days before finishing starts.

Do you serve every district of Saihat?

Yes. We serve all Saihat districts, including Al Khaleej, Al Kawthar, Al Deerah, Al Noor, Al Danah, Al Fayha and Ghirnatah, and we get there quickly from Dammam because the distance is short.

Related services

We work in Saihat and every Eastern Province city:

ع