Building maintenance in Saihat from Aemar Al-Maryam General Contracting is built around what apartment buildings and houses in this coastal town actually need: getting a rented flat ready between one tenant leaving and the next moving in, treating balcony railings that sea air has rusted, and replacing scaled-up float valves in rooftop tanks that either flood the roof or leave the house without water. Everything begins with a walk-through that leaves you holding a list of faults with photographs, after which repairs are booked into set days. One electrical or water fault costs from SAR 90 to diagnose, a whole flat or house from SAR 230 to survey, and the drive out to Saihat is estimated on site; all figures stay provisional until we have seen the property. Ring or message 0547879578.
Most people who contact us from Saihat own a building or a rented flat and want to know what must be fixed before handing the keys to the next tenant, what the outgoing tenant is responsible for, and how to stop rust and leaks from slowly eating the building. This page answers those questions in a practical order: the flat between tenants first, then the balconies, then the roof and its tanks, then the building and its shared parts, followed by prices and a worked example.
In short: building maintenance in Saihat
- Flats between tenants: an inspection with a photographed list, then mixers, drains, electrics, silicone and paint put right before handover.
- Landlord and tenant: the landlord normally bears periodic maintenance and anything that prevents use; the lease sets out minor upkeep.
- Balcony railings: rust removed, anti-rust primer, finish coats, and the point where the steel enters the concrete sealed.
- Tank float valves: scaled float valves replaced and the overflow and stop valve checked, within a plumbing visit from SAR 90.
- Cost: SAR 90 upward for one fault, SAR 230 upward for a full survey, plus travel estimated on site.
- We leave to others: repairing AC machines, appliances, tank cleaning, lifts and fire systems.
- Getting a quote: send 0547879578 photos of the flat, the balconies or the roof, and say how many flats the building has.
Building maintenance in Saihat: what a landlord needs before handing a flat to a new tenant
Maintaining a flat in Saihat between tenants is the best moment for maintenance in a building’s life: the flat is empty, every room is easy to reach, and nobody is waiting for the work to end. In this window we inspect the whole flat and produce a list that separates three kinds of item: what must be fixed before handover because it prevents the home from being used, what is worth fixing now because it is cheaper while the flat is empty, and what should go into the handover record because it may be the result of use.
What we usually find in a flat after a tenant has lived there for years: dripping mixers, slow drains, black mouldy silicone around baths and basins, broken or scorched sockets, breakers nobody can match to their circuits, holes in walls from curtain rails and TV brackets, dirty or flaking paint, and one or two broken tiles. All of it can be put right in a few days if it is done in the right sequence.

Checklist for preparing a flat between tenants
| Area | What we check and fix | Why before handover |
|---|---|---|
| Bathrooms | Mixers, traps, silicone, grout, floor falls, heater and its safety valve | A small leak becomes a dispute with the flat below |
| Kitchen | Sink mixer and waste, worktop sockets, leaks under the sink | The first thing a new tenant uses |
| Electrics | Sockets and switches, breaker labelling, RCD test button | Safety before anything else |
| Walls and ceilings | Filling holes, treating hairline cracks, repainting | The flat is let on how it looks |
| Tiles | Broken or hollow tiles | A broken tile gets worse with use |
| Balcony | Railing and its rust, drainage of the balcony floor | Child safety and protecting the steel |
| Meter | Hidden-leak test while the flat is empty | The most accurate time to test |
Test the meter while the flat is empty
There is no more accurate time for a leak test: nobody is using water. Shut and reopen the flat’s stop valve, take a picture of the meter, then leave it untouched for thirty minutes. If the indicator moves, there is a leak that must be found before the new tenant moves in.
The order of work in an empty flat
Sequence is what gets an empty flat ready on time without one job spoiling another. We start with everything that means opening a wall or floor: replacing a failed pipe or cable section, clearing drains, changing mixers and the heater if needed. Next we fill holes, treat hairline cracks and let the filler dry. Only then comes paint, never before, because any plumbing or electrical work after painting means a visible patch. Finally we renew the silicone around baths and basins, repair the broken tile, and test drains, breakers and the meter one last time.
That is why we ask the landlord at the start when the new tenant is due to move in, and plan the items backwards from that date, leaving time for drying. If the date is very close, we put first the items that prevent the home from being used and postpone improvements that can be done later with the tenant’s agreement and at a time that suits them.
Splitting repair costs between landlord and tenant
Published guidance on residential lease obligations places routine upkeep on the person letting the flat, along with fixing whatever stops the occupant from using it, and asks the occupant to permit urgent work that protects the unit. Both sides may agree in writing that small jobs fall to the occupant, whereas main services, the roof and structural walls generally remain the owner’s affair unless the contract plainly says otherwise. Before billing anybody for a repair, read what your registered Ejar lease says.
Our role here is practical, not legal: we record the condition of every item with photos when the tenant leaves, and again after the repairs when the new tenant arrives. That photo record makes it easier for landlord and tenant to agree what is wear from use and what is a normal fault, and it makes the next handover record clearer.
- ✓Usually the landlord’s: a leak in the network, a damaged breaker or cable, a failed heater, cracks and leaks from the roof, railing rust.
- ✓May be put on the tenant by the lease: minor upkeep such as changing a bulb or clearing a drain blocked through misuse.
- ✓For the handover record: many fixing holes, a tile broken by a heavy object, obvious damage from use.
Balcony railing rust in Saihat: treatment before paint
Rusting balcony railings are a recurring problem in Saihat buildings close to the sea, because air carrying moisture and salt gets in through any scratch in the paint and then creeps underneath it. The common mistake is to paint straight over the rust: the railing looks glossy for a month, then the paint blisters and flakes and the rust returns wider than before.
We also pay attention to a point many people overlook: where the railing posts enter the concrete. If water seeps around a post and the steel rusts inside the concrete, it expands and splits the edge of the balcony, and small pieces start falling from it. We check that spot on every balcony and seal it with a flexible sealant after treatment.
Steps for treating railing rust
- 1Check the railing is sound
We shake the posts to see whether they are firm and whether rust has eaten into the steel section. A railing with weakened steel or loose posts is a safety item recorded separately. - 2Remove the rust
With wire brushes and sanding discs down to clean steel, removing all blistered paint, not just its edges. - 3Clean and dry
We remove dust and salts and let the surface dry completely before any coat. - 4Anti-rust primer
Applied the same day so surface rust does not return. - 5Two finish coats
A paint made for exterior steel that stands up to sun and humidity. - 6Seal the post bases
A flexible sealant where the posts enter the concrete keeps water out.
On apartment buildings we reach upper balconies with lifts or scaffolding depending on the building height and the width of the street, which is why pricing is at inspection: the number of balconies, the length of railing, the degree of rust and the access method. The most economical approach is to treat all the balconies on a facade in a single campaign, so the lift is hired once rather than several times. Which coatings suit steel and seaside facades is explained by our Saihat painting team.
When paint is not enough
If railing posts have worked loose or rust has visibly eaten into their section, or if the concrete edge of the balcony has cracked and exposed its steel, these are safety items, not paint jobs. We list them as urgent, and cracked concrete needs an engineering assessment before treatment.
Rooftop tank float valves in Saihat: overflow and shortage, and how to fix them
The float valve in a rooftop tank in Saihat is a small part that controls the water for the whole house: it opens the supply into the tank when the level drops and closes it when the tank is full. Over time it scales up, its arm corrodes or its float cracks, and two opposite problems appear: a tank that overflows constantly, flooding the roof, wasting water and pushing up the bill; or a tank that never fills, leaving the upper floors without water.

On a tank visit we close the supply valve, check the float, its arm and the sealing washer, replace a scaled float valve with a new one suited to the network pressure, and set the shut-off level so the water stays below the overflow outlet. Then we check that the overflow pipe discharges to a drain and not onto a neighbour’s roof or down the facade, check that the tank lid closes properly, and look at the concrete base and the waterproofing beneath it.
| Symptom | Likely cause | What we do |
|---|---|---|
| Water running constantly from the tank overflow | Float valve not closing, worn washer or high pressure | Replace the valve or washer and reset the level |
| Tank not filling and upper floors dry | Stuck or scaled float valve, or a half-closed stop valve | Free or replace the valve and check the stop valve |
| Pump starting and stopping often | A leak in the network or a pressure switch problem | Meter test and network check |
| Damp patch on the top-floor ceiling under the tank | Repeated overflow or damaged waterproofing under the base | Stop the overflow, then check the waterproofing |
We quote the float valve once we have seen the tank; most are changed during a plumbing call that starts at SAR 90, and the valve itself is charged by the model you pick. If the complaint is weak pressure rather than overflow, finding and curing it starts at SAR 135. Tank cleaning and disinfection is a specialist service we do not offer; we handle the structural and plumbing parts around the tank. Full plumbing details are in plumber in Saihat, and roof waterproofing under tanks in roof waterproofing in Saihat.
Apartment building maintenance in Saihat and the shared parts
Maintaining an apartment building in Saihat divides into what belongs to each flat and what belongs to everyone: the roof and its tanks, the stairs and corridors, the entrance and facade, and the main supply and drainage networks. In a building whose flats have several owners, the roof, stair core, lobby and main pipework are paid for jointly, each owner’s share following the floor area of his flat, and three or more owners are legally required to form an association. That association, or the person it names, becomes our client, and the report after each round separates common-part items from items belonging to individual flats.
In a building let entirely by one owner, it is usually most economical to run maintenance as a programme: a round of the roof and tanks before summer and before the rains, preparation of each flat when its tenant changes, and the facade balconies treated in one campaign. We set its price after surveying, as it scales with flats and rounds.
| When | What is checked in a Saihat building | Why |
|---|---|---|
| Before summer | Tanks, float valves and pumps, the main board and AC breakers | Peak consumption and load |
| Before the rain season | Roof drains and their pipes, balcony drainage | One heavy rain exposes every blocked drain |
| When a tenant changes | Preparing the flat with the photographed list | An empty flat is easier and cheaper to repair |
| Once a year | Facade, railings, stairs and corridors | Rust and flaking start small |
Water coming through from upstairs: whose repair is it?
Most disputes between neighbours in Saihat buildings start with a stain on a bathroom ceiling. The practical rule is that the source of the leak decides who repairs it: if it comes from pipework inside the flat above, such as a mixer, a floor drain or the bathroom’s waterproofing, the repair falls on that flat’s owner, because every owner must maintain his unit so that it does not harm others. If it comes from a shared main pipe or from the roof, it is a common-part item. Our job is to locate the source before any tile is lifted: a meter test for each flat, a water test of the upper bathroom’s drainage, then a thermal camera and moisture meter where needed. Instrument tracing costs from SAR 200 for a whole flat, or SAR 140 when only one wet room is suspect.
Saihat balconies: drainage and waterproofing, not just the railing
Balcony maintenance in Saihat does not stop at the railing. A balcony floor that does not fall towards its drain traps washing and rain water against the flat’s wall, so it gets under the door threshold or seeps into the ceiling of the balcony below, where stains, flaking and sometimes rusted steel at the edge appear. So on every balcony we check three things together: whether its drain runs, the falls of its floor, and the condition of the joints around the door threshold and where the railing posts enter.
A blocked drain is cleared on the same visit and a cracked joint around the threshold is renewed with a flexible sealant, but a balcony whose floor slopes towards the wall needs re-tiling with correct falls and waterproofing beneath the tiles, which we price after seeing it. If stains on the ceilings of the balconies below have reached the point of spalling concrete, we list it as urgent and needing an engineering assessment.
Electrics in rented flats in Saihat: what we review between tenants
Electrics in a rented flat go through things that an owner-occupied flat does not: one tenant adds an air conditioner to a circuit that cannot carry it, another runs a permanent extension lead behind the furniture, and a third replaces a scorched socket with a cheaper one. So we review the board between every pair of tenants: we mark up any unlabelled breakers, trip the RCD with its test button, check terminals for scorching, and check the sockets in the kitchen and bathrooms in particular. A new breaker starts from SAR 90, a board service with load redistribution from SAR 185, and a new point from SAR 75 when the kitchen needs an extra socket instead of extension leads.
Mistakes that raise the cost of maintaining a rented building
- ✓Handing over a flat without an inspection: a fault not recorded at move-out becomes a dispute at the next move-in.
- ✓Painting railings over rust: the rust returns within months and the paint is paid for twice.
- ✓Ignoring an overflowing tank: wasted water, a higher bill and waterproofing ruined under the base.
- ✓Calling a technician for each flat separately: travel is paid every time instead of grouping flats into one visit.
- ✓Leaving the stain in the neighbour’s ceiling: a small leak grows into a repair in two flats instead of one.
Inspecting a flat or house in Saihat and the fault list
A full inspection in Saihat starts from SAR 230 for a flat or house and ends with a written, photographed fault list in order of priority, while a diagnosis visit for a specific fault starts from SAR 90. Inspecting a whole building with its common parts is priced at inspection according to the number of flats and floors. Our list records condition as a contractor sees it; it is no substitute for a structural engineer, and we say when one is needed.
We need the water and electricity on during the visit, plus a way to the roof, the board room and the balconies. If the flat is occupied we ask the residents which faults they have noticed and when they appear, because the timing of a fault points to its cause.
Home maintenance in Saihat: what we do and do not offer
Home maintenance in Saihat, for us, is general-contractor maintenance by agreed appointment, not a 24-hour call-out service. Under one supervisor we bring together electrics, plumbing, waterproofing, crack repair, paint, tiling and gypsum, so anyone looking for a general maintenance company in Saihat gets one list with clear prices instead of coordinating several technicians. AC machines, appliances, lifts and fire detection or sprinkler systems are jobs for licensed specialists, and Civil Defence regards unmaintained fire systems as a safety breach. Where an AC unit meets the building, we run its cable and breaker (SAR 120 upward) and its condensate pipe (SAR 90 upward).
■ Electrics
New breaker from SAR 90, replacing a damaged cable section from 165. Details in electrician in Saihat.
■ Plumbing
Mixer from SAR 75, drain clearing from 90, heater with safety valve from 140. Details in plumber in Saihat.
■ Cracks and paint
Crack treatment in a room before painting from SAR 140, repainting a room from 320. See crack repair in Saihat.
■ Tiles and bathrooms
Repairing broken or hollow tiles from SAR 92; when a bathroom has reached the end of its life, see bathroom renovation in Saihat.
Our full maintenance guide is in building maintenance in Dammam, and the short service description on the building maintenance service page.
Maintenance or restoration in Saihat?
Maintenance in Saihat means keeping the building fit for use: painting a railing, changing a float valve, repairing tiles, renewing silicone; none of this usually needs a permit. Restoring structural defects, such as a balcony edge that has cracked and exposed its steel or a roof that needs complete re-waterproofing, is restoration, and normally an engineering office lodges a restoration licence for it on Balady. When a list goes beyond maintenance we say so plainly and refer you to our renovation contractor in Saihat page.
Building maintenance prices in Saihat
Saihat jobs carry the same per-item figures we publish for Dammam; what is added is the crew’s journey, estimated on site and shared across the day’s work, so readying two flats in one building on the same visit halves each one’s portion. The numbers are provisional labour charges, and parts and materials are chosen and signed off by you.
| Item in the flat or building | Indicative start (SAR) | Note |
|---|---|---|
| Survey of the whole flat or house with photos | 230 | one visit |
| One electrical or water fault | 90 | one visit |
| Round of the roof, tanks and stairwell | at inspection | depends on flat count |
| Basin, sink or shower mixer | 75 | each |
| Slow or blocked drain opened | 90 | per visit |
| Weak water upstairs: traced and cured | 135 | per visit |
| Electric heater fitted with its safety valve | 140 | each |
| Rooftop tank float valve | at inspection | valve charged separately |
| Breaker that keeps tripping, replaced | 90 | each |
| Perished length of circuit cable | 165 | per circuit |
| Wall cracks in a room prepared for paint | 140 | per room |
| Labour to repaint a whole room | 320 | per room |
| One or a few broken tiles | 92 | per job |
| Balcony railings: rust stripped and repainted | at inspection | length and access |
| Leak tracing by instrument, one wet room | 140 | whole flat 200 |
| Crew travel to Saihat | at inspection | shared across items |
More items appear in the estimated price guide. Rows without a number get priced when we see them; photos and a flat count sent to 0547879578 will bring a first estimate.
Worked example: preparing a Saihat flat between tenants
A hypothetical case, worked through for clarity rather than offered as a quote: a three-room flat has just been vacated, and the landlord asks for a full inspection before letting it again. The list shows two dripping mixers, a slow bathroom drain, a constantly tripping breaker that needs replacing, two rooms needing repainting, and one broken kitchen tile.
| On the list | Worked out as | SAR |
|---|---|---|
| Flat survey | 1 × 230 | 230 |
| Replacing two mixers | 2 × 75 | 150 |
| Clearing the bathroom drain | 1 × 90 | 90 |
| New breaker | 1 × 90 | 90 |
| Repainting two rooms (labour) | 2 × 320 | 640 |
| Repairing the broken tile | 1 × 92 | 92 |
| Approximate total | 230 + 150 + 90 + 90 + 640 + 92 | 1,292 |
The total is SAR 1,292 for labour, before materials, travel and the silicone renewal, which is priced with the bathroom items. Had the landlord prepared two flats in the same building on one visit, the travel cost would have been shared between them rather than paid twice.
How to order maintenance in Saihat
- 1Send the photos
The flat room by room, the balconies from the street, or the tanks and float valves on the roof. - 2We set the visit type
A diagnosis visit from SAR 90, a full inspection from SAR 230 or a building survey, with a travel estimate. - 3Inspection and photographs
A list with every item and its photo, separating the landlord’s items from those for the handover record. - 4Approval and scheduling
You choose the items and we order them so the flat is ready before the new tenant’s date. - 5Execution
Plumbing and electrics first, then cracks, then paint, then silicone and a final clean of the work area. - 6Testing and handover
Meter, breaker and drain tests, and after-photos for the flat’s file.
Why Saihat landlords use Aemar Al-Maryam
- ✓A photo record for every flat: its condition at move-out and after repair, useful for the next handover record.
- ✓Scheduling around the tenant’s date: items ordered so the flat is ready on time.
- ✓Rust treated at the root: no paint over rust, and no railing left loose.
- ✓Several trades, one supervisor: plumbing, electrics, paint and tiles without you coordinating several technicians.
- ✓Honesty about scope: we say what we do not offer and refer structural items to an engineer.
Earlier jobs are pictured in our work gallery.
Saihat districts we serve
Saihat sits on the coast within Qatif Governorate, with Anak to its north and Dammam roughly 14 km to its south. Our crews cover neighbourhoods such as Al-Nimr, Al-Fayha, Al-Ghadeer, Al-Kawthar, Al-Salam, Al-Dana, Al-Zuhoor, Al-Khaleej, Gharnata, Qurtuba, Al-Noor, Al-Khisab, Al-Naqa and Al-Deira. We also work in neighbouring Qatif, whose older houses have their own page at building maintenance in Qatif, and in Dhahran, where we run compound programmes as described in building maintenance in Dhahran.
Because Saihat is close to our Dammam base, we schedule its visits on days when we group requests from several buildings and flats in neighbouring districts, which keeps every client’s travel portion down. Within one building we advise the landlord to group the flats whose leases change around the same time and to add a check of the roof, tanks and balconies, turning the visit into a full maintenance round of the building rather than scattered repairs. If the building is on a narrow street or its balconies are high, tell us in your first message so we can arrange the right lift or scaffold in advance.
What to send on WhatsApp for building maintenance in Saihat
- ✓For a flat between tenants: photos of every room, bathroom and the kitchen, and the new tenant’s move-in date.
- ✓For balconies: the building front photographed from across the road, close-ups of the railing and its bases, and the number of floors.
- ✓For the roof: photos of the tanks inside and out, the float valve, the overflow pipe, and any stain on the top-floor ceiling.
- ✓For the building: the number of flats and floors, and whether it has one owner or several.
- ✓Where and when: the neighbourhood, and the days that suit you.
Get your flat or building ready with a clear list
Send photos of the flat, balconies or tanks; we propose the right visit and estimate travel, and you choose from the priced list.
Further Saihat reading
Tags


